• 제목/요약/키워드: Permission procedure

검색결과 46건 처리시간 0.019초

전기 및 증기 생산시설 최적가용기법 (BAT) 기준서의 이해와 개선방향 (Understanding and Improvement of Best Available Techniques for Electricity and Steam Production Facility)

  • 신수정;박재홍;이대균;김대곤
    • 한국대기환경학회지
    • /
    • 제34권2호
    • /
    • pp.281-293
    • /
    • 2018
  • As the public interest in environmental issues increased, the "Act On The Integrated Control Of Pollutant-Discharging Facility" was enacted. Through the integrated environmental pollution prevention act in which 19 industries with large environmental impacts are sequentially applied, pollutants can be managed in a medium-integrated manner and integrated permission of the business unit is possible and BAT can be applied to enable a scientific and proactive environmental management system. This study analyzed the overview of BAT reference documents(BREF), BAT setting procedure and method, and then suggested the development direction BAT and BAT-AEL monitoring method of a Electricity and Steam production facility.

Fuzzy Regression Model Using Trapezoidal Fuzzy Numbers for Re-auction Data

  • Kim, Il Kyu;Lee, Woo-Joo;Yoon, Jin Hee;Choi, Seung Hoe
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • 제16권1호
    • /
    • pp.72-80
    • /
    • 2016
  • Re-auction happens when a bid winner defaults on the payment without making second in-line purchase declaration even after determining sales permission. This is a process of selling under the court's authority. Re-auctioning contract price of real estate is largely influenced by the real estate business, real estate value, and the number of bidders. This paper is designed to establish a statistical model that deals with the number of bidders participating especially in apartment re-auctioning. For these, diverse factors are taken into consideration, including ratio of minimum sales value from the point of selling to re-auctioning, number of bidders at the time of selling, investment value of the real estate, and so forth. As an attempt to consider ambiguous and vague factors, this paper presents a comparatively vague concept of real estate and bidders as trapezoid fuzzy number. Two different methods based on the least squares estimation are applied to fuzzy regression model in this paper. The first method is the estimating method applying substitution after obtaining the estimators of regression coefficients, and the other method is to estimate directly from the estimating procedure without substitution. These methods are provided in application for re-auction data, and appropriate performance measure is also provided to compare the accuracies.

폐기물 소각시설 최적가용기법 연계배출수준 (BAT-AEL) 설정 (BAT-AEL Calculation in Waste Incineration Facility)

  • 신수정;박재홍;이대균;김대곤;배연정
    • 한국대기환경학회지
    • /
    • 제34권1호
    • /
    • pp.144-155
    • /
    • 2018
  • As the public interest in environmental issues increased, the "Act On The Integrated Control Of Pollutant-Discharging Facility" was enacted. Through the integrated environmental pollution prevention act in which 19 industries with large environmental impacts are sequentially applied, pollutants can be managed in a medium-integrated manner and integrated permission of the business unit is possible and BAT can be applied to enable a scientific and proactive environmental management system. In addition, if the facility with BAT works normally, the pollutant emission is offered with the range of lower limit to upper limit. This study analyzed the overview of Best Available Techniques-Associated Emission Levels (BAT-AEL), and its setting procedure and method, and then suggested the BAT-AEL of a waste incineration facility. In comparative analysis on Emission Limit Values (ELVs) of EU, this study tries to propose improvement matters and development directions if the relevant standard is revised.

Fuzzy 정수계획법을 이용한 송전망의 확충계획에 관한 연구 (A Study on the Transmission System Expansion Planning using Fuzzy Integer Programming)

  • 김홍식;문승필;이영진;최형림;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.350-353
    • /
    • 2001
  • This study proposes a new method for the transmission system expansion planning using the fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual systems. A branch and bound method which includes the network flow method and the maximum flow-minimum cut set theorem has been used in order to proceed the stepwise cost characteristics analysis. Uncertainties of the permission of the construction cost and not strict reserve rate and load forecasting of expansion planning have been included and also processed using fuzzy set theory in this study. In order to proceed the latter analysis, the solving procedure is illustrated in detail by branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on 21-bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in future.

  • PDF

Switching performances of multivarite VSI chart for simultaneous monitoring correlation coefficients of related quality variables

  • Chang, Duk-Joon
    • Journal of the Korean Data and Information Science Society
    • /
    • 제28권2호
    • /
    • pp.451-459
    • /
    • 2017
  • There are many researches showing that when a process change has occurred, variable sampling intervals (VSI) control chart is better than the fixed sampling interval (FSI) control chart in terms of reducing the required time to signal. When the process engineers use VSI control procedure, frequent switching between different sampling intervals can be a complicating factor. However, average number of samples to signal (ANSS), which is the amount of required samples to signal, and average time to signal (ATS) do not provide any control statistics about switching performances of VSI charts. In this study, we evaluate numerical switching performances of multivariate VSI EWMA chart including average number of switches to signal (ANSW) and average switching rate (ASWR). In addition, numerical study has been carried out to examine how to improve the performance of considered chart with accumulate-combine approach under several different smoothing constant and sample size. In conclusion, process engineers, who want to manage the correlation coefficients of related quality variables, are recommended to make sample size as large and smoothing constant as small as possible under permission of process conditions.

아파트단지 설계기준 평가를 통한 설계규제에 관한 연구 (A Study on the Design Control Through the Evaluation of Design Guidance for Apartment Complexes)

  • 안건용;김귀곤;임승빈
    • 한국조경학회지
    • /
    • 제14권1호
    • /
    • pp.15-32
    • /
    • 1986
  • Today, the control and criteria of design for apartment site are heavily dependent on laws and ordinance in Korea. But they are indefinite and some part which are deficient in laws and ordinance, are dependent on professional judgement. So trey are not consistent and there are many problems in their applications. The purpose of this study is to suggest fundamental date for the future establishment of better control and criteria, by way of evaluation method about existing control and criteria of design in apartment site in the country. The method of this study is reviewing the present laws and ordinance, carrying out the questionaire survey and making a comparative analysis by doing various statistical analyses. The results of this are as follows; 1) More definite criteria of site density are necessary. 2) Stricter criteria and control about the orientation are indispensible for more efficient use of site. 3) More diverse facilities must be provided. 4) The laws and ordinance must be strengthened for the purpose of increasing the landscape area. 5) It is desirable to provide the criteria of bicycle road to save energy. 6) The facilities criteria for the physically handicapped must be strengthened. 7) The mechanism for the reflection of habitant's attitudes and beliefs should be established. 8) It's necessary to simplify the permission procedure to save tilde and money.

  • PDF

원자력발전소 적용 고밀도 폴리에틸렌 배관의 맞대기 융착절차 및 검증절차 분석 (Butt-fusing Procedures and Qualifications of High Density Polyethylene Pipe for Nuclear Power Plant Application)

  • 오영진;박흥배;신호상
    • Journal of Welding and Joining
    • /
    • 제31권6호
    • /
    • pp.1-7
    • /
    • 2013
  • In nuclear power plants, lined carbon steel pipes or PCCPs (pre-stressed concrete cylinder pipes) have been widely used for sea water transport systems. However, de-bonding of linings and oxidation of PCCP could make problems in aged NPPs (nuclear power plants). Recently at several NPPs in the United States, the PCCPs or lined carbon steel pipes of the sea water or raw water system have been replaced with HDPE (high density polyethylene) pipes, which have outstanding resistance to oxidation and seismic loading. ASME B&PV Code committee developed Code Case N-755, which describes rules for the construction of buried Safety Class 3 polyethylene pressure piping systems. Although US NRC permitted HDPE materials for Class 3 buried piping, their permission was limited to only 10-year operation because of several concerns including the quality of fusion zone of HDPE. In this study, various requirements for fusion qualification test of HDPE and some regulatory issues raised during HDPE application review in foreign NPPs are introduced.

수도권 사업장 대기총량제 시행에 따른 신·증설 사업장 허가기준 개발 연구 (A Study on the Permit Method for a New or an Enlarged Facilities According to the Implementation of Air Pollutant Emission-Cap Regulation in Metropolitan Area)

  • 김홍록;윤영봉;고병철;신원근;김동중;이명훈
    • 환경영향평가
    • /
    • 제16권4호
    • /
    • pp.301-310
    • /
    • 2007
  • For the improvement of air quality in the metropolitan area, Korea has enforced the air pollutant emission cap regulation from the 1st of July, 2007, and the companies that intend to install a new or an enlarged facility in the metropolitan area will be restricted. However, the current regulation on permission does not describe a standard of judgement distinctly. In this study, therefore, a method of permission on the installation of a new or an enlarged facility was developed by supplementing the law in force based on the foreign cases. To develop a specific permit regulation and procedure, the developed nations' cases such as US, Canada, EU were reviewed thoroughly. Also, an appropriate method was suggested to apply domestically for a new or an enlarged facility permit within the regulations of the metropolitan special law. The method consists of first, calculating the possible permit quantity from the difference between an estimated annual emission cap and the annual emission provided by the implementation plan in each region. Second, permitting a new or an enlarged facility construction within the difference of the emission between the regional emission cap and the implementation plan in 2014. Third, distributing emissions allowable to each performance year based on the regional emission cap and the implementation plan in 2014. Fourth, making use of the emission difference between the implementation plan and the performance result in each year. Considering the general domestic conditions, the convenience of the permit authority and permitted companies, the most reasonable method was to use the fourth. To enforce the suggested permit method in a more flexible way, parts of the related regulations need to be revised and continuous research and analysis on the results from the implemented system and on foreign cases is necessary to develop this method a suitable system for domestic conditions and to settle the air pollutant emission cap system.

말기 암 환자에 대한 임상시험과 피험자의 자기결정권의 본질 (The Clinical Trial of Terminal Cancer Patients and The Nature of Self-Determination of The Subject)

  • 송영민
    • 의료법학
    • /
    • 제15권1호
    • /
    • pp.211-237
    • /
    • 2014
  • Because of unpredictability and high possibility of abnormal results by clinical trials compared to general medical behaviors, a procedure for ensuring with sufficient explanations by investigators must be secured. Therefore, in a sequence of clinical trials, what kinds of scope, stage, and method of explanations provided by investigators, including doctors or researchers, to trial subjects are closely related to the compensation for damages by violation of liability for explanation. In case of application of clinical trials to patients who have critical illness such as cancer, issues of "Quality of Life" regarding trial subjects, cancer patients, should be discussed. Especially, in case of clinical trials for terminal cancer patients, the right of subjects' self-determination, which is a fundamental principle in medical behaviors, should be discussed. The right of self-determination includes participation in clinical trials for the possibility of life-sustaining even a little bit, or no participation in clinical trials in order to have a time for completing the rest of his life. Like this, if the extent and scope of explanations related to the issues of "Quality of Life" are raised as main issues, the evaluation of "Quality of Life", should be a prerequisite. In many occasions, realistically, despite bad results such as deaths or serious adverse drug reactions after clinical trials, it may not be easy for compensating to trial subjects or their survivors, who requested civil compensation for damage. Futhermore, in abnormal results after concealment of clinical trials or performance of clinical trials without permission, and in the case of trial subjects' failures of proving proximate cause between the clinical trials and abnormal results, problematic results such as no protection to the trial subjects could be occurred. In performing clinical trials, investigators should provide sufficient explanations for trial subjects and secure voluntary informed consents from the trial subjects. Therefore, clinical trials without trial subjects' permissions and the informed consent process violate trial subjects' rights of self-determination, and the investigators shall be liable for compensation for damages. Then, issues might be addressed are what are essential contents of patients' "rights of self-determination" infringed by clinical trials without subjects' permissions. Two perspectives about patients' rights of self-determination might be considered. One perspective regards physical distress of patients (subjects) from therapies without sufficient explanations as the crux of the matter. The other perspective regards infringement of human dignity caused by being subjects without permission as the crux of the matter irrespective of risks' big and small influences. This research follows perspective of the latter. Forming constant fiduciary relation between investigators (doctors) and subjects (patients) pursuant medical contracts, and in accordance with this fiduciary relation, subjects, who are patients, have expectations of explanations and treatments by the best ways. If doctors and patients set this forth as a premise, doctors should assume civil liability when doctors infringe patients' expectations.

  • PDF

도시재생사업의 리스크요인 분류 및 중요도 산정 (Risk Factor Classification and Weight Estimation for Urban Regeneration Project)

  • 조재경;현창택;윤유상;김윤식;차용운
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.89-99
    • /
    • 2012
  • 대규모 복합개발 형태로 추진되는 도시재생사업은 사업의 특성상 사업이 장기화, 참여주체들 간의 갈등요소, 복잡한 인 허가 과정, 잦은 정책변화 등의 리스크요인을 내포하고 있다. 따라서 사업 진행과정 중 발생할 수 있는 수많은 리스크요인들을 사전에 효율적으로 관리할 수 있는 체계적인 리스크관리가 필요하다. 그러나 도시재생사업과 같은 대규모 복합개발사업의 리스크관리는 아직 도입단계로 주로 일회적인 리스크관리계획이 수립되고 있다. 따라서 본 연구에서는 수많은 리스크요인들이 내재된 도시재생사업의 체계적인 리스크 관리를 위하여, 선행연구와 사례분석을 통해 도시재생사업의 리스크요인을 제시하였다. 그리고 도시재생사업의 추진단계에 따라 리스크요인을 분류하고 그에 대한 중요도를 산정하여, 단계별 중점 리스크요인을 제시하였다.