A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

A Study on Improvement of Defense R & D Program by PMB (PMB적용을 통한 국방연구개발 사업관리 개선방안 연구)

  • Choi, Seok-Cheol;Bae, Yun-Ho
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.2 s.25
    • /
    • pp.60-69
    • /
    • 2006
  • The PMB(performance measurement baseline) is the total time-phased budget plan against which program performance is measured. Additionally it is the schedule for expenditure of the resources allocated to accomplish program scope and schedule objectives, and is formed by the budget assigned. In this paper, we suggest an improvement of the R & D(research and development) program for defense acquisition by using the PMB and an application of the IBR(integrated baseline review) to review the PMB for project manager of the defense agency.

Methods of Establishing the Optimal Performance Measurement Baseline and Evaluating the Progress for Implementing EVMS (EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법)

  • Won Dong-Soo;Kim WooYoung;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.395-400
    • /
    • 2001
  • In construction projects, it is very important to evaluate the performance of works in comparison with the cost and schedule plans. So, on the first of July, 2000, the Ministry of Construction and Transportation announced the EVMS will be applied in public sector soon. However there are still many arguments about how to establish the Performance Measurement Baseline(PMB) and how to evaluate the progress with accuracy. And many people confuse the meaning of EVMS with that of cost and schedule management. So, the purpose of this research is to propose the new useful methods to set up the PMB and to assess the exact progress in consideration of cost, schedule, and float time for successful implementation of EVMS.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.