• Title/Summary/Keyword: Pedestrian Delay

Search Result 43, Processing Time 0.022 seconds

A Study on the Installation of Pedestrian-oriented Roundabout (보행자 중심의 회전교차로 설치방안에 관한 연구)

  • Lee, Seoksoon;Nam, Doohee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.4
    • /
    • pp.30-38
    • /
    • 2022
  • As of 2020, 1,564 roundabouts have been installed and operated to prevent major traffic accidents and promote safe and smooth passage over the past 10 years. According to the Korea Transportation Research Institute, the number of accidents decreased by an average of 43.8% per year, fatal accidents by 50%, and serious injuries by 48.1%, confirming the safety effect. However, most intersections with high pedestrian traffic, such as children's protection areas near elementary schools, operate signal intersections. Therefore, in this study, a simulation was performed through the VISSM program to conduct a study on the pedestrian-centered roundabout installation method. This study was conducted to ensure that pedestrians can have the right of way safely by installing and operating traffic lights at crosswalks on roundabouts located in urban areas or child protection zones.

Study of Effectiveness of Signal Preemption Strategy Depending on Train Speed at Intersections Near Highway-Railroad Grade Crossings (철도건널목 인근 신호교차로에서의 우선신호 전략 비교분석(열차속도를 중심으로))

  • Jo, Han-Seon;Kim, Won-Ho;O, Ju-Taek;Sim, Jae-Ik
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.2 s.95
    • /
    • pp.17-26
    • /
    • 2007
  • Because the prime objective of the current preemption methods at signalized intersections near highway-railroad grade crossings(IHRGCs) is to clear the crossing, secondary objectives such as safe pedestrian crossing time and minimized delay often are given less consideration or are ignored completely during the preemption. Under certain circumstances state-of-the-practice traffic signal preemption strategies may cause serious pedestrian safety and efficiency problems at IHRGCs. An improved transition preemption strategy(ITPS) that is specifically designed to improve intersection performance while maintaining or improving the current level of safety was developed by Cho and Rilett. Even if the new transition preemption strategy improved both the safety and efficiency of IHRGCs, the performance of the strategy is affected by train speed. Understanding the impact of this factor is essential in order to implement ITPS. In this paper, the effects of train speed were analyzed using a VISSIM simulation model which was calibrated to field conditions. It was concluded that the delay is affected more by train speed than the transitional preemption strategy and the safety of the intersection is not affected by train speed once an advanced preemption warning time(APWT) is equal to or greater than 90 seconds.

A Overview and Effectiveness of the Computer Controlled Traffic Signal system at Seoul (대도시 신호관제시스템의 효과)

  • 박병소
    • Journal of Korean Society of Transportation
    • /
    • v.1 no.1
    • /
    • pp.10-27
    • /
    • 1983
  • In order to improve the traffic enviroments in the urban streets of Seoul, the computer controlled traffic signal system was installed on 45 intersections at 1980. Afterward, yearly expansion was done to the numbers of 132 intersections and 232 loop detectors. The problems of timing plans were discussed, mainly pedestrian crossing timing as well as the generations of split and offset. The broad urban streets more than 30m require long phasing time of pedestrians, even though the equivalent or correspondent traffic volume is rare. The configuration of computer system for traffic control was disscussed in terms of control strategy. An overview also given. The improvements were measured at every quater. The travel speed improved to 42%, delay time reduced to 41% and number of stops to 43% respectively.

  • PDF

An Analysis of the Vehicular Delay Caused by Scrambled Crosswalk Installation in a Roundabout (회전교차로에서 대각선횡단보도 설치에 따른 차량의 지체도 분석)

  • Kang, Sung In;Lee, Young Woo
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.3
    • /
    • pp.218-226
    • /
    • 2014
  • This study examines a way to install a crosswalk that can improve pedestrians' convenience and safety and that goes beyond the crosswalk design standard of existing roundabouts. When a scrambled crosswalk, one of the crosswalk installation methods, is introduced to the roundabout system, it shortens the cross-walking distance of pedestrians and thus enhances convenience. Although the installation of a scrambled crosswalk may enhance pedestrians' convenience, it may obstruct vehicular traffic. Thus, this study presents standards for reasonable diagonal crosswalk installation based on the investigation on its effects on a vehicle's delay time. This study includes an analysis of the various geometric structures of roundabouts. The study results show that as v/c and the number of pedestrians increased, the delay time after the installation of a scrambled crosswalk increased although the extent was different. In general, the effect of the installation of a scrambled crosswalk was insignificant regardless of the number of pedestrians when v/c was under 0.6. When the number of pedestrians was 300/hour or lower, the difference in the delay time was quite insignificant regardless of v/c. In addition, as the inscribed circle of the roundabout was larger, the difference in the delay time decreased depending on v/c and the number of pedestrians.

A Study on Real Time Signal Metering Operation at Roundabouts by Considering Queue Clearance Time (대기행렬 소거시간을 고려한 회전교차로 실시간 신호미터링 운영 연구)

  • Lee, Sol;Ahn, Woo-Young;Lee, Seonha;Cho, Han-Seon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.6
    • /
    • pp.133-143
    • /
    • 2018
  • Roundabouts are generally installed at which traffic and pedestrian volume is relatively small intersections, and hence traffic can flow one direction around a circular island without traffic lights. A number of researches for roundabout signal metering have been processing ways to deal with operation efficiency drops in conditions of unusual traffic and pedestrian volume increases. However, there is still a shortcoming exists in previous operation algorithm does not consider the hidden vehicles between yield lines and detectors and queueing vehicles in circular lanes. These queueing vehicles between them can be cleared by introducing the queue clearance time. The purpose of this research is developing a real time signal metering operation algorithm by considering the vehicle queue clearance time. The results of varying queue clearance time application show that there is a substantial average vehicle delay reduction in VISSIM Com-Interface simulation. When the total number of entering vehicle is 3,200~4,800 vehicle/hour with varying queue clearance time application 21~50 seconds gives average delay reduction per vehicle by 16.1~71.7%.

Study on the Installation warrants of staggered crosswalk traffic island on Urban Streets - Focusing on pedestrian safety and service level - (도시부가로 이단 횡단보도 교통섬 설치 준거에 관한 연구 - 보행자 안전과 서비스수준을 중심으로 -)

  • Shim, Kwan-Bo;Kim, Joong-Hyo;Park, Kyung-Woo;Ha, Dong-Ik
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.6
    • /
    • pp.97-107
    • /
    • 2013
  • On the Staggered Crosswalks, pedestrians cross the crosswalks two times. This method can reduce the cycle, the vehicle delay and the walking distance by increasing the major direction of green time. The safety of pedestrians is also effective. This study suggests the warrant of the facilities of island width and length etc. by considering the road structure and pedestrians. Also this study suggests the standard of the safety through the accident analysis of Staggered crosswalks and General Crosswalks. In the results, accident rate of the Staggered Crosswalks 18.3(100 million vehicle-km) was lower than the accident rate of the General Crosswalks 28.3(100million vehicle-km). By understanding the start point of crossing of the Staggered Crosswalks, the analysis of the location and types of accident suggests the safety zone(spare space). The setting warrants of Staggered Crosswalks are 4 lane over the road and the 2 meter over sidewalk width of island. The minimum length of the Pedestrian island was doubled compared to the crosswalks width. And the maximum length was set by considering the wait time of the pedestrians.

Applicability of Emergency Preemption Signal Control under UTIS (UTIS를 이용한 긴급차량 우선신호 제어방안)

  • Park, Soon-Yong;Kim, Dong-Nyong;Kim, Myung-Soo;Lee, Jung-Beom
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.5
    • /
    • pp.27-37
    • /
    • 2012
  • Even thought the firefighters have to hurry to the scene to extinguish the blaze, the fire engines could not rushed out due to the worst of traffic condition. Traffic signal control is one of the most important methods to minimize the fire engines's travel time. The focus of this paper is to develop a traffic control strategy, which is emergency vehicle preemption algorithm considering pedestrian in order to reduce travel time of emergency vehicle. This algorithm also includes recovering strategy after preemption signal to minimize the other vehicle's delay. In order to estimate the effectiveness of traffic control, traffic simulation was performed using VISSIM micro simulation tool for two different kinds of networks, which were non-coordinated corridor and coordinated corridor. The differences of travel time and average delay between emergency vehicle and ordinary vehicle were respectively estimated under pre-existed pretimed signal and preemption traffic control at two respective networks. The results of the simulation for the emergency vehicle, travel time was reduced to 36.8~43.3% under "Add or Subtract" method whereas it was reduced to 30.7~46.0% under "Dwell" method. In addition, in non-coordinated corridor case of ordinary vehicle, average control delay of "Dwell" method was increased 33.5% whereas it grew 0.5% under coordinated corridor. And "Add or Subtract" method was confirmed that average control delay of ordinary vehicle was increased 0.7% under non-coordinated corridor whereas it swelled 4.5% under coordinated corridor.

A study on Restructuring the Street Network for the Improvement of Traffic Problems in Metropolitan Central Area (대도시 도심교통문제의 개선을 위한 가로망체계의 개편방안에 관한 연구)

  • 임강원;임강원
    • Journal of Korean Society of Transportation
    • /
    • v.5 no.2
    • /
    • pp.81-95
    • /
    • 1987
  • In line with the continued growth of car ownership, the traffic problems in central area of metropoles such as Seoul would become increasingly degraded. comparing with most western cities, the problems in Seoul are characterized by the improportionately high rates of intersection delay, station congestion, traffic accidents caused by weaving conflicts and pedestrian congestion. It is caused by the lack of flexibility I street network, which is prerequisite for upholding the efficacy of traffic management and control, resulted from the simplicity of network graph in terms of connectivity, street density and distribution by width. This pattern has been resulted from the prolonged policy pursuing the street-widening of the nagging bottleneck in such a short period since the 1950s, comparing that most western cities had undergone over several centuries an age of horse-and-vehicle transportation. In order to improve the expected traffic problems in central area over the coming periods of motorization, it is imperative to restructure the street network in Central Seoul so that the efficacy of traffic management and control may be operative. Based upon the long-range planning the street network should be restructured by stages so that cenral traffic may be controled by one-way operation and most through-traffic be detoured around fringe area.

  • PDF

A Study on the Application Method of All-Red Phase at the Signalized Intersection (신호교차로의 전적신호 적용방법 연구)

  • Woo, Yong-Han;Ryu, Yeong-Geun;Lee, Sang-Hyuk
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.5
    • /
    • pp.29-37
    • /
    • 2017
  • Intersection signal's phase time is calculated and determined by car and pedestrian traffic volume. If signal phase time and traffic volume dis-matched, cars and pedestrians have much delay time. This paper suggested an All-Red phase application method that cars and pedestrians securing safety and minimizing traffic signal waiting time. The key solution of this suggested method is determining All-Red phase operation by using sum of spare green time that have no passing cars. That is, total time of spare green time that have no passing cars is longer than All-Red phase time, operating All-Red phase has an effect. And case study carried out at the signalized intersection, revealed that this suggested method has much effectiveness.

Performance Evaluation of Channel Estimation for WCDMA Forward Link with Space-Time Block Coding Transmit Diversity (시공간 블록 부호 송신 다이버시티를 적용한 WCDMA 하향 링크에서 채널 추정기의 성능 평가)

  • 강형욱;이영용;김용석;최형진
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.6A
    • /
    • pp.341-350
    • /
    • 2003
  • In this paper, we evaluate the performance of a moving average (MA) channel estimation filter when space-time block coding transmit diversity (STBC-TD) is applied to the wideband direct sequence code division multiple access (WCDMA) forward link. And we present the infinite impulse response (IIR) filter scheme that can reduce the required memory buffer and the channel estimation delay time. This paper also compares the performance between MA filter scheme and IIR filter scheme in various Rayleigh fading channel environments through the bit error rate (BER) and the frame error rate (FER). Extensive computer simulation results show that transmission with STBC-TD provides a significant gain in performance over no transmit diversity technique, particularly at pedestrian speeds. If STBC-TD technique is employed in the channel estimator based on MA filter, it provides considerable performance gains against Rayleigh fading and reduces the optimum filter tap number. Consequently, the channel estimation delay time and the complexity of the receiver are reduced. In addition, the channel estimator based on IIR filter has the advantages such as little memory requirement and no delay time compared to the MA scheme. However, IIR filter coefficients is very sensitive to the mobile speed change and it exerts a serious influence upon the performance. For that reason, it is important to set uP the optimum IIR filter coefficients.