• 제목/요약/키워드: Peak-to-Peak Method

검색결과 4,289건 처리시간 0.047초

Study on the Synthesis of Wool-blending Fiber Bundle and New Signs of the Curve

  • Ren Yonghua;Yu Jianyong
    • Fibers and Polymers
    • /
    • 제6권4호
    • /
    • pp.339-342
    • /
    • 2005
  • In this paper, a hand-operating method (tiled test method) of the wool-blending sample is made out, and make use of the method, the test of wool-blending bundle in different blending ratio is accomplished. According to the test data, the synthesis method of the stretch curve is worked out and the synthesis software for the typical stretch curve of wool-blending bundle is designed. Through laboratory hand-operating method, the blending fasciculus applying to fiber bundle test can be obtained in a short time. Calculation for sampling is accomplished in the article. We bring up 9 new signs to describe the characteristics of the curve behind peak for the first time: elongation behind peak (HE), elongation percentage behind peak (HEP), relative elongation rate behind peak (RHE), total break work $(W_a)$, break work behind peak (HW), break work coefficient behind peak (HWC), elongation percentage of half-load behind peak (HEL), load percentage of half-elongation behind peak (HLE), break efficiency behind peak (HEC).

국내영역에서 셀전달지연 추정 및 peak-to-peak CDV 노드별 할당 (Estimation of CTD and Peak-to-Peak CDV Allocation to Nodes in Domestic Region)

  • 박천관;한종석
    • 대한전자공학회논문지TC
    • /
    • 제38권2호
    • /
    • pp.6-12
    • /
    • 2001
  • CBR 소스 트래픽에 대한 ATM 교환기와 광대역 망종단장치의 셀전달지연을 측정하여 국내영역에서의 셀전달지연을 추정하였다. 추정결과 I.356의 할당원칙에 의한 국내영역의 셀전달지연 목표치를 만족하였다. Chernoff 누적방법에 기초한 peak to peak CDV 할당방법을 제안하고 국내영역의 노트들에 적용하였다. 수치해석 결과 전송경로상에 놓인 노드수와 각 노드에서의 CDV가 증가하는 경우에 제안된 할당방법이기존의 균등할당 방법에 비해 정확도가 개선되었다.

  • PDF

A Simple and Robustness Algorithm for ECG R- peak Detection

  • Rahman, Md Saifur;Choi, Chulhyung;Kim, Young-pil;Kim, Sikyung
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권5호
    • /
    • pp.2080-2085
    • /
    • 2018
  • There have been numerous studies that extract the R-peak from electrocardiogram (ECG) signals. All of these studies can extract R-peak from ECG. However, these methods are complicated and difficult to implement in a real-time portable ECG device. After filtration choosing a threshold value for R-peak detection is a big challenge. Fixed threshold scheme is sometimes unable to detect low R-peak value and adaptive threshold sometime detect wrong R-peak for more adaptation. In this paper, a simple and robustness algorithm is proposed to detect R-peak with less complexity. This method also solves the problem of threshold value selection. Using the adaptive filter, the baseline drift can be removed from ECG signal. After filtration, an appropriate threshold value is automatically chosen by using the minimum and maximum value of an ECG signals. Then the neighborhood searching scheme is applied under threshold value to detect R-peak from ECG signals. Proposed method improves the detection and accuracy rate of R-peak detection. After R-peak detection, we calculate heart rate to know the heart condition.

수중음향통신에서 Peak Detector를 갖는 시간동기회복에 관한 연구 (A Study on the Timing Recovery using Peak Detector in Underwater Acoustic Communication)

  • 한민수;김기만
    • 한국항해항만학회지
    • /
    • 제36권5호
    • /
    • pp.371-378
    • /
    • 2012
  • 본 논문에서는 OQPSK(Offset Quadrature Phase Shift Keying) 변복조를 사용하는 수중음향통신에서 시간동기회복을 위해 기존의 Gardner TED(Timing Error Detector)에 Parabolic Peak Interpolation 을 사용하는 Peak Detector를 첨가하여 위상 수렴속도를 상승시켜 송신 데이터양의 감소를 도모하였다. Parabolic Peak Interpolation을 이용하여 지속적으로 국소 최대 또는 최소의 근사치로 이동한 후 Gardner TED를 적용하기 때문에 시간동기화 안정화를 속도를 빨리함으로써 Preamble 구간의 데이터양을 절반으로 줄일 수 있고 또한 Preamble 구간에서도 위상 수렴을 하지 못하는 임계치에서 제안한 방법을 시뮬레이션한 결과 임계점에서 BER(Bit Error Rate)이 약 23%정도 성능이 개선되는 것을 확인할 수 있었다. 또한 실제 동해에서 수집한 데이터를 사용하여 기존의 Gardner TED만 사용하는 방법과 성능 비교 결과 송수신기 사이의 거리가 3 km 이었을 때 제안한 방법을 적용한 경우 기존의 방법에 비해 Converge speed가 1.4배 이상 상승하는 것을 확인할 수 있었고, BER측면에서도 약 20%정도 상승하는 것을 확인할 수 있었다.

Micro-Grid 시스템에서 Peak-Shaving을 이용한 PV+ 시스템의 최적 운영 방법 (Optimal Operating Method of PV+ Storage System Using the Peak-Shaving in Micro-Grid System)

  • 이지환;이강원
    • 산업경영시스템학회지
    • /
    • 제43권2호
    • /
    • pp.1-13
    • /
    • 2020
  • There are several methods of peak-shaving, which reduces grid power demand, electricity bought from electricity utility, through lowering "demand spike" during On-Peak period. An optimization method using linear programming is proposed, which can be used to perform peak-shaving of grid power demand for grid-connected PV+ system. Proposed peak shaving method is based on the forecast data for electricity load and photovoltaic power generation. Results from proposed method are compared with those from On-Off and Real Time methods which do not need forecast data. The results also compared to those from ideal case, an optimization method which use measured data for forecast data, that is, error-free forecast data. To see the effects of forecast error 36 error scenarios are developed, which consider error types of forecast, nMAE (normalizes Mean Absolute Error) for photovoltaic power forecast and MAPE (Mean Absolute Percentage Error) for load demand forecast. And the effects of forecast error are investigated including critical error scenarios which provide worse results compared to those of other scenarios. It is shown that proposed peak shaving method are much better than On-Off and Real Time methods under almost all the scenario of forecast error. And it is also shown that the results from our method are not so bad compared to the ideal case using error-free forecast.

민감도 함수의 최대치 제어를 통한 강인제어 (Robust Control via Peak Control of Sensitivity Function)

  • 서상민
    • 제어로봇시스템학회논문지
    • /
    • 제15권11호
    • /
    • pp.1071-1075
    • /
    • 2009
  • This article describes a robust control method by using peak control of a sensitivity function in the state-feedback control systems. This method apparently reduces the peak, and as a result makes closed loop systems more stable. The designed closed loop systems also make the response to an external step disturbance more fast with a lower undershoot. At the conclusion, it is verified that the proposed method enhances robust stability and robust performance to parametric uncertainties through $\mu$-plot.

피크패턴법을 이용한 종이재의 PCBs 분석 방법에 관한 연구 (Study on the Analysis of PCBs in Papers by the Peak Pattern Method)

  • 김기명;유승석;이광호
    • 한국식품위생안전성학회지
    • /
    • 제14권1호
    • /
    • pp.67-75
    • /
    • 1999
  • The new approach using the Peak Pattern Method was conducted for the analysis of polychlorinated biphenyls (PCBs) from the papers or paper products to provide certain hygienic data for the recycled papers as well as white papers. The height of the each peak, obtained from the PCBs standards, was transformed to the spectrum to compare with that of the samples. In addition to the results of the single PCBs standards, the pattern of mixed PCBs standards with the adequate concentration and ratios were obtained prior to the analysis of the paper samples. The test showed excellent repetition within 5% variation, and the recoveries of PCBs ranged from 92% to 97%. The PCBs, considered as a hazard material, were analyzed using the Peak Pattern Method from six different types of paper samples including the roll tissue. It could not find the same pattern of the PCBs peaks from all of the paper samples.

  • PDF

피크부하용 혼소엔진발전의 경제성 분석 (An Economic Analysis on Dual-fuel Engine Generation for Peak Load)

  • 이옥배;안재경
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

공업용수 정수장 설계시 첨두부하 적용방안 (Application of peak load for industrial water treatment plant design)

  • 김진근;이희남;김두일;구자용;현인환
    • 상하수도학회지
    • /
    • 제30권3호
    • /
    • pp.225-231
    • /
    • 2016
  • Peak load rate(i.e., maximum daily flow/average daily flow) has not been considered for industrial water demand planning in Korea to date, while area unit method based on average daily flow has been applied to decide capacity of industrial water treatment plants(WTPs). Designers of industrial WTPs has assumed that peak load would not exist if operation rate of factories in industrial sites were close to 100%. However, peak load rates were calculated as 1.10~2.53 based on daily water flow from 2009 to 2014 for 9 industrial WTPs which have been operated more than 9 years(9-38 years). Furthermore, average operation rates of 9 industrial WTPs was less than 70% which means current area unit method has tendency to overestimate water demand. Therefore, it is not reasonable to consider peak load for the calculation of water demand under current area unit method application to prevent overestimation. However, for the precise future industrial water demand calculation more precise data gathering for average daily flow and consideration of peak load rate are recommended.

달리기 시 충격력과 충격 쇼크 변인들과의 관계 (Relationship between Impact and Shear Forces, and Shock during Running)

  • Park, Sang-Kyoon;Ryu, Ji-Seon
    • 한국운동역학회지
    • /
    • 제30권2호
    • /
    • pp.145-154
    • /
    • 2020
  • Objective: The purpose of this study was to determine the relationship between impact and shear peak force, and tibia-accelerometer variables during running. Method: Twenty-five male heel strike runners (mean age: 23.5±3.6 yrs, mean height: 176.3±3.3 m/s, mean mass: 71.8±9.7 kg) were recruited in this study. The peak impact and anteroposterior shear forces during treadmill running (Bertec, USA) were collected, and impact shock variables were computed by using a triaxial accelerometer (Noraxon, USA). One-way ANOVA was used to test the influence of the running speed on the parameters. Pearson's partial correlation was used to investigate the relationship between the peak impact and shear force, and accelerometer variables. Results: The running speed affected the peak impact and posterior shear force, time, slope, and peak vertical and resultant tibial acceleration, slope at heel contact. Significant correlations were noticed between the peak impact force and peak vertical and resultant tibia acceleration, and between peak impact average slope and peak vertical and resultant tibia acceleration average slope, and between posterior peak (FyP) and peak vertical tibia acceleration, and between posterior peak instantaneous slop and peak vertical tibial acceleration during running at 3 m/s. However, it was observed that correlations between peak impact average slope and peak vertical tibia acceleration average slope, between posterior peak time and peak vertical and resultant tibia acceleration time, between posterior peak instantaneous slope and peak vertical tibial acceleration instantaneous slope during running at 4 m/s. Conclusion: Careful analysis is required when investigating the linear relationship between the impact and shear force, and tibia accelerometer components during relatively fast running speed.