• Title/Summary/Keyword: Peak power

Search Result 2,645, Processing Time 0.033 seconds

A development of direct load control system for air-conditioner (원격제어 에어컨 개발 보급현황 및 향후전망)

  • Gang, Won-Gu;Kim, Choong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

High Efficiency Power Amplifier Based on Digital Pre-Distortion (디지털전치왜곡 기반 고효율 전력증폭기 설계)

  • Kwon, Ki-Dae;Yoon, Wonsik
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.8
    • /
    • pp.1847-1853
    • /
    • 2014
  • The PAPR of the input signal is increased due to OFDMA signal in a mobile communication system. High efficiency of a power amplifier, which accounts for power consumption, is a very important key technology. Digital Pre-Distortion techniques were used to improve the linearity of the power amplifier. The Asymmetric Doherty scheme was used to improve the efficiency of the power amplifier. In this paper, we propose a new structure of Asymmetric Doherty. Drive power amplifier part is separated as main path and peak path, and phase shifter is employed to improve power combine characteristics of the Doherty Amplifier. Also, envelope tracking technology for drive gate bais in drive peak amplifier is used to improve efficiency.

Design of High Average Power Pulse Transformer for 30-MW Klystron of L-Band Linac Application (산업용 선형가속기 시스템 적용을 위한 30-MW 클라이스트론용 고 평균전력 펄스 트랜스포머의 설계)

  • Jang, S.D.;Son, Y.G.;Gwon, S.J.;Oh, J.S.;Bae, Y.S.;Lee, H.G.;Moon, S.I.;Kim, S.H.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1550-1551
    • /
    • 2006
  • An L-band linear accelerator system for e-beam sterilization is under design for bio-technology application. The klystron-modulator system as RF microwave source has an important role as major components to offer the system reliability for long time steady state operation. A PFN line type pulse generator with a peak power of 71.5-MW, $7{\mu}s$, 285 pps is required to drive a high-power klystron. The high power pulse transformer has a function of transferring pulse energy from a pulsed power source to a high power load. The pulse transformer producing a pulse with a peak voltage of 275 kV is required to produce 30-MW peak and 60 kW average RF output power at the frequency of 1.3-GHz. We have designed the high power pulse transformer with 1:13 step-up ratio. The peak and average power capability is 71.5-MW (275 kV, 260 A at load side with $7{\mu}s$ pulse width) and 130 kW, respectively. In this paper, we present a system overview and initial design results of the high power pulse transformer.

  • PDF

Parameter Evaluation of High-Power Pulse Transformer for L-Band 30-MW Klystron (L-band 30-MW 클라이스트론용 고출력 펄스트랜스포머의 파라미터 평가)

  • Jang, S.D.;Son, Y.G.;Kwon, S.J.;Oh, J.S.;Kim, S.H.;Yang, H.R.;Moon, S.I.;Kwon, B.H.;Cho, M.H.;NamKung, W.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1079-1081
    • /
    • 2007
  • An L-band Linear Accelerator System for E-beam sterilization is under construction for bio-technology application. The klystron-modulator system as an RF microwave source has an important role as major components to offer the system reliability for long time steady-state operations. A PFN line type pulse generator with a peak power of 71.5-MW, $7\;{\mu}s$, 285 pps is required to drive a high-power klystron. The high power pulse transformer has a function of transferring pulse energy from a pulsed power source to a high power load. The pulse transformer producing a pulse with a peak voltage of 275 kV is required to produce 30-MW peak and 60 kW average RF output power at the frequency of 1.3-GHz. We have designed the high power pulse transformer with 1:13 step-up ratio. The peak and average power capability is 71.5-MW (275 kV, 260 A at load side with $7\;{\mu}s$ pulse width) and 130 kW, respectively. In this paper, we present measurements and its analysis on the design parameters, and an initial test result as well as a design concept on the high-power pulse transformer.

  • PDF

Calculation of Photovoltaic, ESS Optimal Capacity and Its Economic Effect Analysis by Considering University Building Power Consumption (대학건물의 전력소비패턴 분석을 통한 태양광, ESS 적정용량 산정 및 경제적 효과 분석)

  • Lee, Hye-Jin;Choi, Jeong-Won
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.5
    • /
    • pp.207-217
    • /
    • 2018
  • Recently, the importance of energy demand management, particularly peak load control, has been increasing due to the policy changes of the Second Energy Basic Plan. Even though the installation of distributed generation systems such as Photovoltaic and energy storage systems (ESS) are encouraged, high initial installation costs make it difficult to expand their supply. In this study, the power consumption of a university building was measured in real time and the measured power consumption data was used to calculate the optimal installation capacity of the Photovoltaic and ESS, respectively. In order to calculate the optimal capacity, it is necessary to analyze the operation methods of the Photovoltaic and ESS while considering the KEPCO electricity billing system, power consumption patterns of the building, installation costs of the Photovoltaic and ESS, estimated savings on electric charges, and life time. In this study, the power consumption of the university building with a daily power consumption of approximately 200kWh and a peak power of approximately 20kW was measured per minute. An economic analysis conducted using these measured data showed that the optimal capacity was approximately 30kW for Photovoltaic and approximately 7kWh for ESS.

A LSTM Based Method for Photovoltaic Power Prediction in Peak Times Without Future Meteorological Information (미래 기상정보를 사용하지 않는 LSTM 기반의 피크시간 태양광 발전량 예측 기법)

  • Lee, Donghun;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.4
    • /
    • pp.119-133
    • /
    • 2019
  • Recently, the importance prediction of photovoltaic power (PV) is considered as an essential function for scheduling adjustments, deciding on storage size, and overall planning for stable operation of PV facility systems. In particular, since most of PV power is generated in peak time, PV power prediction in a peak time is required for the PV system operators that enable to maximize revenue and sustainable electricity quantity. Moreover, Prediction of the PV power output in peak time without meteorological information such as solar radiation, cloudiness, the temperature is considered a challenging problem because it has limitations that the PV power was predicted by using predicted uncertain meteorological information in a wide range of areas in previous studies. Therefore, this paper proposes the LSTM (Long-Short Term Memory) based the PV power prediction model only using the meteorological, seasonal, and the before the obtained PV power before peak time. In this paper, the experiment results based on the proposed model using the real-world data shows the superior performance, which showed a positive impact on improving the PV power in a peak time forecast performance targeted in this study.

Evaluation and Analysis of Scheduling Algorithms for Peak Power Reduction (전력 피크 감소를 위한 스케줄링 알고리즘의 성능 평가 및 분석)

  • Sung, Minyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2777-2783
    • /
    • 2015
  • Peak power reduction is becoming increasingly important not only for grid operators but also for residential users. The scheduling of electric loads tries to reduce the power peak by splitting the power-on period of an electric device into multiple smaller ones and by interleaving the on-periods of every device in a holistic way. This paper analyzes the performance of EDF, LSF, TCBM, and lazy scheduling algorithms and proposes the enhancement schemes. For analysis, we have implemented the scheduling policies in a simulation environment for distributed control systems. Through extensive experiments using real power traces, we discuss their performance characteristics in terms of power deviation, switch count, and temperature violation ratio. To prevent excessive switching, we propose to employ the concept of limited preemptibility and evaluate its effect on performance. It is found that the best performance is achieved when the scheduler capacity is dynamically adjusted to the actual power demand. The experiment results show that, by load scheduling, the probability of having a power deviation greater than 150W is reduced from 21.5% down to 3.2%.

Peak-to-Average Power Ratio Reduction Using N-tuple Selective Mapping Method for MC-CDMA

  • Ali, Sajjad;Chen, Zhe;Yin, Fuliang
    • ETRI Journal
    • /
    • v.37 no.2
    • /
    • pp.338-347
    • /
    • 2015
  • The multi-carrier transmission signal in Multi-Carrier Code Division Multiple Access (MC-CDMA) has a high peak-to-average power ratio (PAPR), which results in nonlinear distortion and deteriorative system performance. An n-tuple selective mapping method is proposed to reduce the PAPR, in this paper. This method generates $2^n$ sequences of an original data sequence by adding n-tuple of n PAPR control bits to it followed by an interleaver and error-control code (ECC) to reduce its PAPR. The convolutional, Golay, and Hamming codes are used as ECCs in the proposed scheme. The proposed method uses different numbers of the n PAPR control bits to accomplish a noteworthy PAPR reduction and also avoids the need for a side-information transmission. The simulation results authenticate the effectiveness of the proposed method.

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.