• 제목/요약/키워드: Peak operation

검색결과 803건 처리시간 0.031초

원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현 (A1gorithm Embodiment for Automatic Pump Operation Pattern)

  • 변두균;윤영환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구 (Study on ESS Operation Plan for Energy Reduction in Industrial Customer)

  • 유순정;이안기;백정선;차대중;김재철
    • 전기학회논문지
    • /
    • 제67권9호
    • /
    • pp.1152-1158
    • /
    • 2018
  • In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.

실시간 전기요금제에서 마이크로그리드의 운용 방법 (Microgrid operating method in realtime pricing)

  • 정태영;백영식
    • 전기학회논문지
    • /
    • 제59권12호
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.

국내공항의 항공기 운항 첨두 특성과 첨두시 주기장 소요에 관한 연구 (Peak-time Characteristics and Parking Apron Requirements of Korean Airports)

  • 유승권;이영혁
    • 대한교통학회지
    • /
    • 제21권6호
    • /
    • pp.27-42
    • /
    • 2003
  • 공항개발 사업을 계획하는 데 있어서 가장 기본이 되는 요소는 항공수요 중에서도 첨두시의 수요이다. 통상 첨두시 수요를 근거로 공항시설의 소요규모를 정하는 것이 일반적이며 시설용량의 포화 정도를 가늠할 때도 첨두시 수요를 기준으로 한다. 첨두운항의 형태는 해당 공항을 이용하는 항공 노선의 특성, 공항의 지리적 위치, 공항을 이용하는 여객 및 화물의 특성 등에 따라서 다르게 나타나며, 첨두수요는 첨두시간계수에 의해 산출된다. 지금까지 국내의 공항건설계획에서 채택해온 첨두특성과 첨두시간계수는 외국의 연구결과에 따른 것이었다. 그러나 이들 기존의 연구결과가 제시하는 다양한 첨ㄷ특성이나 첨두시간계수가 국내 실정에 적합한 지의 여부는 아직 공식적으로 확인된 적이 없다. 본 논문에서는 최근 10년간의 국내 공항별 항공운송 실적통계와 5년간의 공항별 운항스케줄을 이용하여 시간대별 운항패턴과 첨두특성을 분석하였다. 그리고 공항별 첨두시간계수를 산출하고 기존의 연구결과와 비교분석하였으며, 국내공항의 사업계획을 위한 연간운항회수별 첨두시간계수를 제시하였다. 또한 공항별로 시간대별 주기장 소요를 분석함으로써 운항특성에 따라 주기장 소요가 어떤 양상을 보이는지 연구하였다.

상전원의 피크치 전력 감소를 위한 전력병합장치 회로설계 (Circuit Design of Parallel Power Operation Equipment for Peak Power Reduction)

  • 양재수;김동한;김만도
    • 정보처리학회논문지:컴퓨터 및 통신 시스템
    • /
    • 제3권9호
    • /
    • pp.273-278
    • /
    • 2014
  • 최근 전력의 수요공급 불균형으로 전력사용 피크시간대의 전력사용 강제 제한이 불가피하다. 따라서, 본 논문에서는, 피크전력이 발생하지 않는 시간대의 전기를 저장하고 전력부족이 예상되는 피크전력 시간대에는 저장전력을 공급하는 병렬운전 기기의 회로를 설계하는데 있다. 이 회로설계를 통하여, PRS의 핵심기능인 상용전원과 인버터 발생전원의 병렬연결 운용으로, 상용전원의 피크치 전력을 조절할 수 있었다. 또한 효율을 높이기 위하여 Transless Power Circuit DC-AC 인버터를 개발하였다. 더 나아가, 가변임피던스 제어를 적용하여 무정전 전원장치의 저장전력을 상용전원과 연계함으로써, 기존의 무정전 전원장치에서 구현을 못하고 있는 저장전력 사용시간을 획기적으로 늘릴 수 있는 기술구현 가능성을 입증하였다.

Real-Time Peak Shaving Algorithm Using Fuzzy Wind Power Generation Curves for Large-Scale Battery Energy Storage Systems

  • Son, Subin;Song, Hwachang
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • 제14권4호
    • /
    • pp.305-312
    • /
    • 2014
  • This paper discusses real-time peak shaving algorithms for a large-scale battery energy storage system (BESS). Although several transmission and distribution functions could be implemented for diverse purposes in BESS applications, this paper focuses on a real-time peak shaving algorithm for an energy time shift, considering wind power generation. In a high wind penetration environment, the effective load levels obtained by subtracting the wind generation from the load time series at each long-term cycle time unit are needed for efficient peak shaving. However, errors can exist in the forecast load and wind generation levels, and the real-time peak shaving operation might require a method for wind generation that includes comparatively large forecasting errors. To effectively deal with the errors of wind generation forecasting, this paper proposes a real-time peak shaving algorithm for threshold value-based peak shaving that considers fuzzy wind power generation.

공업용수 정수장 설계시 첨두부하 적용방안 (Application of peak load for industrial water treatment plant design)

  • 김진근;이희남;김두일;구자용;현인환
    • 상하수도학회지
    • /
    • 제30권3호
    • /
    • pp.225-231
    • /
    • 2016
  • Peak load rate(i.e., maximum daily flow/average daily flow) has not been considered for industrial water demand planning in Korea to date, while area unit method based on average daily flow has been applied to decide capacity of industrial water treatment plants(WTPs). Designers of industrial WTPs has assumed that peak load would not exist if operation rate of factories in industrial sites were close to 100%. However, peak load rates were calculated as 1.10~2.53 based on daily water flow from 2009 to 2014 for 9 industrial WTPs which have been operated more than 9 years(9-38 years). Furthermore, average operation rates of 9 industrial WTPs was less than 70% which means current area unit method has tendency to overestimate water demand. Therefore, it is not reasonable to consider peak load for the calculation of water demand under current area unit method application to prevent overestimation. However, for the precise future industrial water demand calculation more precise data gathering for average daily flow and consideration of peak load rate are recommended.

컨볼루션을 이용한 전자 유압 시스템의 피크압력 저감 제어 연구 (A Study of Peak Pressure Reduction Control of Electro Hydraulic System using Convolution)

  • 김경수;정진범;유범상
    • 드라이브 ㆍ 컨트롤
    • /
    • 제16권3호
    • /
    • pp.59-66
    • /
    • 2019
  • Hydraulic systems are essential for most of the construction equipments due to their various advantages, such as very powerful, quick response speed, precision control and remote control. Moreover, they are necessary to apply the electro hydraulic systems for precise and remote controls. Operating the small electronic joystick of the remote controller for the control of a multipurpose work machine with remote control technology increases the possibility of a sudden operation compared to the use of a conventional hydraulic joystick. When a joystick is suddenly operated, the peak pressure is generated in the system due to the quick response of the system. Then a vibration is generated due to the peak pressure, which causes instability to the operation of the construction equipment. Therefore, in this study, we confirmed the level of reduction of peak pressure occurring in the electro hydraulic system by using AMESim, when the output signal of the step shape generated by the sudden operation of the electronic joystick was changed by using the convolution operation.

피크전류제한 설정에 따른 피크전류제한 기능을 갖는 자속구속형 초전도한류기의 고장전류제한 특성 분석 (Analysis on Fault Current Limiting Characteristics According to Peak Current Limiting Setting of a Flux-Lock Type SFCL with Peak Current Limiting Function)

  • 고석철
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.68-73
    • /
    • 2012
  • In this paper, the fault current limiting characteristics of a flux-lock type superconducting fault current limiter (SFCL) with peak current limiting function were analyzed through its short-circuit tests. The setting condition for the peak current limiting operation was derived from its electrical equivalent circuit, which was dependent on the inductance ratio between the third coil and the first coil. Through the analysis on the short-circuit tests for the flux-lock type SFCLs with the different inductance ratio between the third coil and the first coil, the setting value for the peak current limiting operation of the flux-lock type SFCL with peak current limiting function could be confirmed to be adjusted with the variation of the inductance ratio between the third coil and the first coil.

2010년 여름철 전력계통 최적 운영에 관한 연구 (A Study on the Optimal Operation of 2010 Summer Peak in Korea Power System)

  • 이성무;조종만;김규호
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1733-1740
    • /
    • 2010
  • KPX(Korea Power Exchange) predicts that summer peak load will be 70,700MW and system overload will be 150% from contingency analysis. This paper presents a method to operate power system at 2010 summer peak. about equipment variation, power system variation, analysis results of voltage stability, and the method to relief overload by comparing 2009 and 2010. Especially, transmission constraints to prevent global contingency in Korea power system and the role of SPS(Special Protection System) to prevent voltage collapse when fault occurs are introduced.