A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

Study on ESS Operation Plan for Energy Reduction in Industrial Customer (산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구)

  • Yu, Soon-Jeong;Lee, An-gi;Baek, Jeong-Seon;Cha, Dae-Joong;KIm, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.9
    • /
    • pp.1152-1158
    • /
    • 2018
  • In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.

Microgrid operating method in realtime pricing (실시간 전기요금제에서 마이크로그리드의 운용 방법)

  • Jyung, Tae-Young;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.

Peak-time Characteristics and Parking Apron Requirements of Korean Airports (국내공항의 항공기 운항 첨두 특성과 첨두시 주기장 소요에 관한 연구)

  • Yoo, Seung-Gwon;Lee, Yeong-Heok
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.6
    • /
    • pp.27-42
    • /
    • 2003
  • The basis for planning airport development is the specific demand at peak hour among various aviation demands. The demand at peak hour is regarded to be the source which enables us to estimate the size requirement and capacity of an airport facility. The distribution type of peak hour-operation depends on the difference of aircraft route, geographical location of airport, passengers and cargo. The demand at peak hour is calculated with peak hour factor. So far, the features of peak hour adopted for domestic airport construction plan have been based on the foreign research results. However, it is officially unconfirmed whether the various peak hour characteristics or peak hour factor suggested from foreign studies can be compatible with Korean state or not. In this study, the aircraft operation pattern and the peak hour characteristics are analyzed with hourly data using the operation schedule of an airport for the last 5 years and the actual result statistics of Korean air transportation by airport through the recent 10 Years. After the peak hour factor of the airports is calculated and compared with existing research results, peak hour factor by annual operation frequency is suggested for Korean airports.

Circuit Design of Parallel Power Operation Equipment for Peak Power Reduction (상전원의 피크치 전력 감소를 위한 전력병합장치 회로설계)

  • Yang, Jaesoo;Kim, Donghan;Kim, ManDo
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.3 no.9
    • /
    • pp.273-278
    • /
    • 2014
  • Recent use of electricity during peak hours electricity supply-demand imbalance is inevitable that limit power use force. Therefore, in this paper, a circuit of parallel power operation equipment for peak power reduction which saves the power to electricity storage device during the non-peak power time and supply from the storage power during the expected power shortages time is designed Through this circuitry, the peak power of the commercial power supply with the parallel operation and connection of the commercial power supply and the power supply of the inverter from electricity storage that is a key feature of PRS(Peak power Reduction System) can be controlled. In addition, in order to increase the efficiency, a Transless Power Circuit DC-AC inverter is developed. Moreover, a variable impedance control is applied to the storage of electric power of an Uninterruptible Power Supply associated with a commercial power source.

Real-Time Peak Shaving Algorithm Using Fuzzy Wind Power Generation Curves for Large-Scale Battery Energy Storage Systems

  • Son, Subin;Song, Hwachang
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.14 no.4
    • /
    • pp.305-312
    • /
    • 2014
  • This paper discusses real-time peak shaving algorithms for a large-scale battery energy storage system (BESS). Although several transmission and distribution functions could be implemented for diverse purposes in BESS applications, this paper focuses on a real-time peak shaving algorithm for an energy time shift, considering wind power generation. In a high wind penetration environment, the effective load levels obtained by subtracting the wind generation from the load time series at each long-term cycle time unit are needed for efficient peak shaving. However, errors can exist in the forecast load and wind generation levels, and the real-time peak shaving operation might require a method for wind generation that includes comparatively large forecasting errors. To effectively deal with the errors of wind generation forecasting, this paper proposes a real-time peak shaving algorithm for threshold value-based peak shaving that considers fuzzy wind power generation.

Application of peak load for industrial water treatment plant design (공업용수 정수장 설계시 첨두부하 적용방안)

  • Kim, Jinkeun;Lee, Heenam;Kim, Dooil;Koo, Jayong;Hyun, Inhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.3
    • /
    • pp.225-231
    • /
    • 2016
  • Peak load rate(i.e., maximum daily flow/average daily flow) has not been considered for industrial water demand planning in Korea to date, while area unit method based on average daily flow has been applied to decide capacity of industrial water treatment plants(WTPs). Designers of industrial WTPs has assumed that peak load would not exist if operation rate of factories in industrial sites were close to 100%. However, peak load rates were calculated as 1.10~2.53 based on daily water flow from 2009 to 2014 for 9 industrial WTPs which have been operated more than 9 years(9-38 years). Furthermore, average operation rates of 9 industrial WTPs was less than 70% which means current area unit method has tendency to overestimate water demand. Therefore, it is not reasonable to consider peak load for the calculation of water demand under current area unit method application to prevent overestimation. However, for the precise future industrial water demand calculation more precise data gathering for average daily flow and consideration of peak load rate are recommended.

A Study of Peak Pressure Reduction Control of Electro Hydraulic System using Convolution (컨볼루션을 이용한 전자 유압 시스템의 피크압력 저감 제어 연구)

  • Kim, Kyung Soo;Jeong, Jin Beom;Ryuh, Beom Sahng
    • Journal of Drive and Control
    • /
    • v.16 no.3
    • /
    • pp.59-66
    • /
    • 2019
  • Hydraulic systems are essential for most of the construction equipments due to their various advantages, such as very powerful, quick response speed, precision control and remote control. Moreover, they are necessary to apply the electro hydraulic systems for precise and remote controls. Operating the small electronic joystick of the remote controller for the control of a multipurpose work machine with remote control technology increases the possibility of a sudden operation compared to the use of a conventional hydraulic joystick. When a joystick is suddenly operated, the peak pressure is generated in the system due to the quick response of the system. Then a vibration is generated due to the peak pressure, which causes instability to the operation of the construction equipment. Therefore, in this study, we confirmed the level of reduction of peak pressure occurring in the electro hydraulic system by using AMESim, when the output signal of the step shape generated by the sudden operation of the electronic joystick was changed by using the convolution operation.

Analysis on Fault Current Limiting Characteristics According to Peak Current Limiting Setting of a Flux-Lock Type SFCL with Peak Current Limiting Function (피크전류제한 설정에 따른 피크전류제한 기능을 갖는 자속구속형 초전도한류기의 고장전류제한 특성 분석)

  • Ko, Seok-Cheol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.12
    • /
    • pp.68-73
    • /
    • 2012
  • In this paper, the fault current limiting characteristics of a flux-lock type superconducting fault current limiter (SFCL) with peak current limiting function were analyzed through its short-circuit tests. The setting condition for the peak current limiting operation was derived from its electrical equivalent circuit, which was dependent on the inductance ratio between the third coil and the first coil. Through the analysis on the short-circuit tests for the flux-lock type SFCLs with the different inductance ratio between the third coil and the first coil, the setting value for the peak current limiting operation of the flux-lock type SFCL with peak current limiting function could be confirmed to be adjusted with the variation of the inductance ratio between the third coil and the first coil.

A Study on the Optimal Operation of 2010 Summer Peak in Korea Power System (2010년 여름철 전력계통 최적 운영에 관한 연구)

  • Lee, Sung-Moo;Cho, Jong-Man;Kim, Kyu-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1733-1740
    • /
    • 2010
  • KPX(Korea Power Exchange) predicts that summer peak load will be 70,700MW and system overload will be 150% from contingency analysis. This paper presents a method to operate power system at 2010 summer peak. about equipment variation, power system variation, analysis results of voltage stability, and the method to relief overload by comparing 2009 and 2010. Especially, transmission constraints to prevent global contingency in Korea power system and the role of SPS(Special Protection System) to prevent voltage collapse when fault occurs are introduced.