• Title/Summary/Keyword: Peak Load Control

Search Result 205, Processing Time 0.03 seconds

A Study on the Demand Forecasting Control using A Composite Fuzzy Model (복합 퍼지모델을 이용한 디맨드 예측 제어에 관한 연구)

  • Kim, Chang-Il;Seong, Gi-Cheol;Yu, In-Geun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.9
    • /
    • pp.417-424
    • /
    • 2002
  • This paper presents an industrial peak load management system for the peak demand control. Kohonen neural network and wavelet transform based techniques are adopted for industrial peak load forecasting that will be used as input data of the peak demand control. Firstly, one year of historical load data of a steel company were sorted and clustered into several groups using Kohonen neural network and then wavelet transforms are applied with Biorthogonal 1.3 mother wavelet in order to forecast the peak load of one minute ahead. In addition, for the peak demand control, composite fuzzy model is proposed and implemented in this work. The results are compared with those of conventional model, fuzzy model and composite model, respectively. The outcome of the study clearly indicates that the composite fuzzy model approach can be used as an attractive and effective means of the peak demand control.

Evaluation on Reducing Peak Cooling Load Based on Dynamic Load Model of Building Perimeter Zones (건물의 외주부 존에 대한 동적 부하모델 이용 피크냉방부하 저감효과 분석)

  • Lee, Kyoung-Ho;Brau, James E.
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.4
    • /
    • pp.1-8
    • /
    • 2011
  • In this paper, inverse building modeling was applied to building perimeter zones which have different window orientation. Two test zones of east-facing and west-facing zones in ERS(Energy Resource Station) building, which is representative of small commercial building, was used to test performance of cooling load calculation and peak cooling load reduction. The dynamic thermal load model for the east and west zone was validated using measured data for the zones and then it was used to investigate the effect of peak cooling load reduction by adjustment of indoor cooling temperature set points during on-peak time period. For the east zone, the peak load can be reduced to about 60% of the peak load for conventional control even without any precooling. For the west zone, PLR is nearly independent of the start of the on-peak period until a start time of 1pm. Furthermore, PLR has a small dependence on the precooling duration. Without any precooling, the peak cooling load can be reduced to about 35% of the peak load associated with conventional control.

An New Load Allocation Algorithms of Direct Load Control (직접부하제어 시스템의 새로운 부하 배분 알고리즘)

  • Kim, Jeong-Uk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.407-410
    • /
    • 2010
  • This paper presents an advanced load allocation algorithm in Direct Load Control(DLC) system. It is important to aggregate a various demand side resource which is surely controllable at the peak power time for a successful DLC system. Previous load allocation algorithm appropriate for DLC system is based on interchanged information, but, this algorithm can not derive optimal solutions. In this paper, we develop the optimal algorithm and the new load allocation algorithm in polynomial time. The simulation results show that the proposed heuristic algorithm for DLC system is very effective.

An Application of Direct Load Control Using Control Logic Based On Load Properties (부하특성별 제어로직을 적용한 직접 부하제어 시스템 활용)

  • Doo, Seog-Bae;Kim, Jeoung-Uk;Kim, Hyeong-Jung;Kim, Hoi-Cheol;Park, Jong-Bae;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 2004.07d
    • /
    • pp.2668-2670
    • /
    • 2004
  • This paper presents an advanced load control method in Direct Load Control(DLC) system. It is important to aggregate a various demand side resource which is surely controllable at the peak power time for a successful DLC system. Because the DLC system use simple On/Off control that may cause a harmful effect on a plant to reduce a peak power load, there are some restriction on deriving a voluntary participation of demand side resource. So it needs a new approach to direct load control method, and this paper describes an advanced load control method using control logic which is based on load properties. This method is easy to take account of a various characteristic of load, it can be use as a dynamic control logic which is good for adaptive control. The suggested control logic method is verified by modeling a control logic for a turbo refrigerator which affects on peak power in summer season.

  • PDF

A development of direct load control system for air-conditioner (원격제어 에어컨 개발 보급현황 및 향후전망)

  • Gang, Won-Gu;Kim, Choong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

POWER LOAD MANAGEMENT FOR PEAK LOAD CLIPPING (POWER LOAD DIRECT CONTROL METHOD) (Peak부하(負荷) 억제(抑制)를 위한 전력부하관리(電力負荷管理) (전력부하(電力負荷) 직접제어방식(直接制御方式)))

  • Kim, Yeong-Han;Lee, Hyo-Sang;Kim, Jai-Young
    • Proceedings of the KIEE Conference
    • /
    • 1989.07a
    • /
    • pp.246-250
    • /
    • 1989
  • Owing to the rapid development of economy and the higher living standard of people, electricity demands have growth and the peak load has been increased rapidly. To cope with this impacts and to reduce the cost of service,utilities are conserned about power load management program. This paper shows a scheme of power load control and the basic structure of direct load control system. And also radio control method using the public pager which is one of the best economical and serviceable method in techniques will be introduced briefly.

  • PDF

Development of Adaptive Home Power Peak-Cut Control System Using Power Line Communication (전력선통신을 이용한 소규모 주택용 맞춤형 전력피크 제어시스템 개발)

  • Kim, Sang-Dong;Park, Ji-Ho;Kim, Dong-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.1
    • /
    • pp.219-226
    • /
    • 2016
  • In this paper, adaptive home power peak-cut control system is developed using PLC. The developed scheme provides monitoring of power usage, power peak-cut control and additional function. In test bed, zone is presented by bedroom, living room, kitchen and bathroom. And individual load is presented by lighting, heater and fan in zone. In developed scheme, zone control is implemented by single PLC modem. And individual load control is implemented by key-map table. In addition, power peak-cut control system S/W, which can perform setting of power peak, power peak-cut control and monitoring of power usage.

The development and implementation of airconditioner control system for peak load clipping (하계 피크전력 감소를 위한 냉방기제어시스템 개발 및 적용)

  • 문홍석;조선구;이원빈
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.783-787
    • /
    • 1996
  • The rapid growth of air conditioning load has become a main reason of peak load increase in summer. In connection with this, we surveyed the load management projects of utilities world wide and their detailed activities. This study is to develop a remote load control system using computer and radio communications. We finished the field-test of this system on August 1995 in Seoul area. During the field-test, the remote load control of air conditioners was proved to be well-timed. Two control modes, group control and all control, are available for the user to select. The transmission reliability of the load control signal was very good and the functions of system hardware as well as the software were excellent. So we confirmed the applicability of the load control system including the pager communication network. In this paper, detailed information on the system functions and experimental results are described.

  • PDF

A Peak Load Control-Based Worker-Linker Pattern for Stably Processing Massive I/O Transactions (안정적인 대용량 I/O거래 처리를 위한 Peak Load Control(PLC) 기반의 Worker-Linker 패턴)

  • Lee, Yong-Hwan;Min, Dug-Ki
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.12 no.5
    • /
    • pp.312-325
    • /
    • 2006
  • Integration applications, such as EAI, B2Bi, need stable massive data processing systems during overload state cause by service request congestion in a short period time. In this paper, we propose the PLC (Peak Load Control)-based Worker-Linker pattern, which can effectively and stably process massive I/O transactions in spite of overload state generated by service request congestion. This pattern uses the delay time algorithm for the PLC mechanism. In this paper, we also show the example of applying the pattern to business-business integration framework and the experimental result for proving the stability of performance. According to our experiment result, the proposed delay time algorithm can stably control the heavy overload after the saturation point and has an effect on the controlling peak load.

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF