• 제목/요약/키워드: Pavement management

검색결과 253건 처리시간 0.023초

시험도로 건설과 계측시스템 구축 (A Review of Instrumentation System and Construction of Korea Highway Test Road)

  • 최준성;김도형;김성환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF

도로포장의 효율적 동상방지층 설계를 위한 현장 계측자료의 데이터베이스(DB) 구축 (An Establishment of Database for Effective Design of Anti-Frost Heave Layer using Field Data)

  • 김낙석;남영국;조규태;이범우
    • 한국방재학회 논문집
    • /
    • 제11권3호
    • /
    • pp.43-47
    • /
    • 2011
  • 우리나라는 겨울철에 동결된 상태로 있다가 봄에는 해빙되는 계절적 동토지역이다. 이러한 계절적 특성으로 인하여 겨울에서 봄에 이르기까지 도로포장의 동결 융해가 반복되어 도로 파손을 유발 시키고 있다. 동결 융해로 인한 피해를 줄이기 위하여 도로포장 설계 시 노상이 동결하는 것을 방지하기 위한 동상방지층을 별도로 설치를 하고 있으나 실효성 검증 없이 국외 연구 결과에 따른 시방서를 바탕으로 무분별하게 적용되고 있어 국가적으로 예산을 낭비하고 있는 실정이다. 본 연구에서는 동결지수 선도를 따라 선정된 15개 지역의 성토부 2 m 이하, 절토부, 절성경계부 구간에서 계측된 온도 및 함수비 데이터들을 효율적으로 관리하고 모니터링 하기위한 데이터베이스를 구축하고자 하였다. 연구결과 계측자료의 효율적인 저장 및 관리가 가능한 데이터베이스를 구축하여 도로설계 기술자의 손쉬운 계측 자료 검색 및 다운로드가 가능하게 되었다.

실험적 방법에 의한 콘크리트 사장교의 보행자 중심 진동사용성 평가 (Vibration Serviceability Evaluation for Pedestrian of Concrete Cable-stayed Bridge by Experimental Method)

  • 강성후;최봉현;박선준
    • 한국방재학회 논문집
    • /
    • 제11권2호
    • /
    • pp.59-66
    • /
    • 2011
  • 본 연구에서는 콘크리트 사장교를 대상으로 차량주행속도와 교면아스팔트의 포장 상태, 차량중량 등을 실험변수로 하여 차량이 교량을 주행할 때 교면(보도)진동이 보행자에게 미치는 진동사용성 평가 방법에 대해 연구하고 그 결과로부터 진동사용성 여부를 평가하였다. 특히, 실험변수 가운데 교면포장 상태를 BMS기준에 의해 A와 C등급으로 구분하였다. 여기에는 진동을 발생시키는 에너지원을 "환산중량"으로 정의하고 차량주행 속도와 차량중량의 자승근을 곱한 형태로 사용하였다. 환산중량 228.0~1161.9 km/h kN 범위 내의 동일한 실험 조건에서 얻어진 교면포장 상태 A등급의 경우에 대한 C등급 경우의 진동가속도 응답 비율은 1.23~1.43으로 분석되어 교면포장 상태가 진동가속도 응답을 결정짓는데 큰 영향을 미치고 있음을 확인 할 수 있었다. 연구대상 교량의 교면 진동가속도 응답을 추정할 수 있는 진동추정식을 신뢰도 50%, 90%, 95%로 구분하여 제시하였으며, 실험 교량에서 교면 포장 A등급과 C등급의 경우 각각 전체응답의 30%, 40%가 레벨 C(강하게 감지)범위, 70%, 60%가 레벨 D(명확하게 감지) 범위에 있는 것으로 나타났다.

투수성 포장재의 우수 표면유출 저감 효과 (The Effect of Pervious Pavement on Reducing the Surface Runoff)

  • 이춘석;류남형;한승호
    • 한국환경복원기술학회지
    • /
    • 제11권6호
    • /
    • pp.26-37
    • /
    • 2008
  • The purpose of the study was to evaluate the effect of pervious pavements on reducing the surface runoff caused by rainfall. The surface runoff from twelve steel experimental beds with different pavement had been recorded every minute from May to September 2008, by the measuring system of tipping buckets(0.1mm/count) and data aquisition systems(National Instrument's Labview and DAQ boards & Autonics PR12-4). The dimension of the experimental bed was $1.5m(W){\times}2.0m(L){\times}0.6m(D)$ and eleven different kinds of vegetational(grass, grass+cubic stone, grass+hole brick), modular(brick, cubic stone, small cubic stone, wood block, interlocking block, clay brick, granular clay brick) and granular(naked soil, gravel) paving materials and concrete were applied for the comparison. Six rain events with depth over 30mm were selected and compared. The maximum depth of the rainfall selected was 137.5mm for 28 hours, and the minimum 30mm for 5 hours. The maximum rainfall per hour was 23mm/hr and the minimum 11.4mm/hr. The major findings were as follows; 1. All pervious pavement applied reduced over 75% of the surface runoff compared with concrete pavement. The grassy and porous pavements were relatively efficient in reducing surface runoff. 2. The grass was the more efficient as intercepting average 69.5mm of initial surface runoff, and maximum 77.8mm at the condition of 13.5mm/hr rainfall. The next was gravel intercepting maximum 65.5mm at the condition of 13.5mm/hr and the 40.9mm at 19.1mm/hr, average 55.7mm. 3. The modular pavements common in urban area were not good in intercepting the runoff except the 'clay granular brick' compared with others. The 'clay granular brick' showed relatively efficient intercepting average 14.1mm, which was the bigger amount than the 'grass+hole brick'. 4. The 'naked soil' were more effective than the 'concrete', 'brick', and 'interlocking block' in reducing the surface runoff, but less efficient than other materials. The capacity of the 'naked soil' to intercept the initial rainfall was similar to the 'brick'. As summary, the more grassy and porous pavement shows more effective in reducing surface runoffs.

Infrastructure Asset Management System Methodologies for Infrastructure Asset Management System in U.S.

  • 이상엽;정승현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.67-72
    • /
    • 2003
  • Infrastructure asset management is a methodology for programming infrastructure capital investments and adjusting infrastructure service provision to fulfil established performance, considering the life-cycle perspective of infrastructure. In this study, the methodologies for infrastructure asset management system implemented in sewer management system, bridge management system, pavement and highway management system, and embankment dam management system are described with focus on the system in U.S. As the major methodology to support the decision-making for asset mangers to better allocate the limited funds to the area needing it the most. various demand forecasting methodologies used in wastewater, water, transportation, electricity, and construction are also introduced for their applicability towards infrastructure asset management.

  • PDF

Framework of Non-Nuclear Methods Evaluation for Soil QC and QA in Highway Pavement Construction

  • Cho, Yong-K.;Kabassi, Koudous;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.45-52
    • /
    • 2012
  • This study introduces a methodology to evaluate different types of non-nuclear technologies to see how they are competitive to the nuclear technology for quality control (QC) and quality assurance (QA) in soil condition measurement for highway pavement construction. The non-nuclear methods including the Electrical Density Gauge (EDG) and the Light Weight Deflectometer (LWD) were tested for their performance against a nuclear gauge, and traditional methods were used as baselines. An innovative way of comparing a deflection gauge to a density gauge was introduced. Results showed that the nuclear gauge generally outperformed the non-nuclear gauge in accuracies of soil density and moisture content measurements. Finally, a framework was developed as a guideline for evaluating various types of non-nuclear soil gauges. From other perspectives rather than accuracy, it was concluded that the non-nuclear gauges would be better alternative to the nuclear gauge when the followings are considered: (1) greater life-cycle cost savings; (2) elimination of intense federal regulations and safety/security concerns; and (3) elimination of licensing and intense training.

A development of traffic information detection using camera

  • 김양주;한민홍
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1995년도 춘계공동학술대회논문집; 전남대학교; 28-29 Apr. 1995
    • /
    • pp.316-323
    • /
    • 1995
  • This paper presents an image processing technique to get traffic information such as vehicle volume, velocity, and occupancy for measuring the traffic congestion rate. To obtain these information, two horizontal lines are previously set on the screen. A moving vehicle is detected using the gray level difference on each line, and also template matching method at night. Threshold values are determined by sampling pavement grey level, and updated dynamically to cope with the change of ambient light conditions. These technique is successfully used to calculate vehicle volume, occupancy, and velocity. This study can be applied to traffic signal control system for minimizing traffic congestion in urban areas.

  • PDF

융설시스템을 이용한 조립식 보도포장 기술 개발 (Development of block-type sidewalk pavement system using snow-melting system)

  • 박경모;이정욱;김창덕
    • 한국건설관리학회논문집
    • /
    • 제16권6호
    • /
    • pp.136-143
    • /
    • 2015
  • 해외 선진국에서는 2000년 자연재해대책법 개정을 통해 차도 중심의 융설시스템에서 인권위주의 보행자 전용시스템으로 확대 적용하고 있으나, 국내에는 2006년 선진국형 융설시스템이 도입되어 도로 부문에 일부 시공 되었지만 보행자를 위한 융설시스템 개발 및 적용 사례는 전무한 편이다. 따라서 본 연구에서는 열선의 열이 보도블록 상부로 효율적으로 전달되도록 함으로써 지반으로 손실되는 열을 최소화하고 충격에 따른 열선의 손상 방지 및 공정을 단순화하여 원가 및 공정을 절감할 수 있는 블록형 보도포장 기술을 개발하고 이를 현장 적용하였다. 품질시험 결과 휨강도는 KS기준보다 약 5배, 흡수율은 7배~10배의 성능이 향상된 것으로 분석되었다. 또한 현장 시험결과 기존 융설시스템은 노면의 온도가 영상으로 올라가는데 약 180분이 소요되었으나 블록형 보도포장 기술은 약 10분 정도 소요되었으며 30분 경과 후 노면 평균 온도는 $3.5^{\circ}C$를 유지하였다. 이처럼 조립식 보도블록 기술개발을 통해 겨울철 보행자 낙상방지를 통한 국민안전확보 및 화학제설제 사용 억제를 통한 환경오염 방지에 기여할 수 있을 것으로 기대한다.

공간 빅데이터를 활용한 지방도 포장보수 우선지역 예측 서비스 (Priority Area Prediction Service for Local Road Packaging Maintenance Using Spatial Big Data)

  • 이민영;최지우;김인영;손수진;최인호
    • 지능정보연구
    • /
    • 제29권3호
    • /
    • pp.79-101
    • /
    • 2023
  • 전라북도의 지방도 포장보수 이력 관리 현황은 현장 건설사의 포장보수 후 성과품에만 의존하여 엑셀, 한글 문서로만 관리되고 있는 실정이며, 덧씌우기 예산 등은 매년 불규칙적인 투입으로 안정적인 도로 관리 불가한 현황이다. 그에 따라 지방도의 체계적인 유지관리 방안 필요하다. 해당 논문에서는 도로 파손과 관련이 있는 데이터 및 도로 환경과 관련이 있는 데이터를 수집 및 가공하여, 도로 파손이 발생할 수 있는 위험지역을 도출하였다. 해당 예측 결과 지역을 현장검수하여 해당 방법론의 유효성을 파악하였다. 국토부에 따르면 일반국도의 도로 파임 발생 건수는 18년도에 약 4만7천건, 19년도에 약 3만8천 건이며 도로 파임 피해 소송건수는 18년도에 93건, 19년도에 119건으로 증가했다. 일반국도의 경우 도로 파임 발생 건수가 18년도에 비해 줄었으나 이는 도로 포장 보수 등을 진행하면서 발생 건수가 줄어든 것이라고 한다. 전라북도의 지방도의 포장보수 우선순위를 분석하기 위해 연구를 진행하기 위해, 엑셀, 한글 문서로만 관리되는 지방도 포트홀 상습발생지, 덧씌우기 사업구간, 긴급 보수구간위치와 같은 보수 이력데이터를 데이터화 하여, 분석하고, 보수 이력 데이터에서 벗어나 지방도의 체계적인 유지관리를 개선한다. 더 나아가, 도로와 관련된 다양한 현황데이터를 활용하여 공간 융합 데이터를 구축하고, 머신러닝 학습 데이터 및 예측에 필요한 데이터 형태로 가공하였다. 해당 공간 빅데이터를 사용하여 지방도 유지관리가 필요한 우선지역을 예측하고 도로포장 유지관리 우선순위 예측하였으며, 해당 결과를 활용하여 도로관리 예산 및 정책 수립에 활용하려 한다.