• 제목/요약/키워드: Pavement Condition Index (PCI)

검색결과 7건 처리시간 0.019초

인천국제공항 아스팔트 포장 보수시기 결정 사례 연구 (Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport)

  • 이재호;김장락;문형철;조남현
    • 한국도로학회논문집
    • /
    • 제15권6호
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.

아스팔트 공항포장의 PCI 산출을 위한 공제값 곡선 개발 (Development of Deduct Value Curves for the Pavement Condition Index of Asphalt Airfield Pavement)

  • 이강진;서영찬;조남현;박대욱
    • 한국도로학회논문집
    • /
    • 제15권3호
    • /
    • pp.37-44
    • /
    • 2013
  • PURPOSES: This study is to develop the deduct value curves for the calculation of pavement condition index of asphalt airfield pavement. METHODS: To develop the deduct value curves of asphalt airfield pavement, panel rating was conducted to decide the pavement condition based on pavement distress type, severity, and density. RESULTS: Results show that standard deviation of deduct values by panel rating is increased at higher severity level and as damage density increases. The deduct value of alligator cracking show the highest. CONCLUSIONS: The deduct value curves based on panel rating could be used without existing problems which were occurred in Shahin's method.

IRI estimation using analysis of dynamic tire pressure and axle acceleration

  • Zhao, Yubo;McDaniel, J. Gregory;Wang, Ming L.
    • Smart Structures and Systems
    • /
    • 제19권2호
    • /
    • pp.151-161
    • /
    • 2017
  • A new method is developed to estimate road profile in order to estimate IRI based on the ASTM standard. This method utilizes an accelerometer and a Dynamic Tire Pressure Sensor (DTPS) to estimate road roughness. The accelerometer measures the vertical axle acceleration. The DTPS, which is mounted on the tire's valve stem, measures dynamic pressure inside the tire while driving. Calibrated transfer functions are used to estimate road profile using the signals from the two sensors. A field test was conducted on roads with different quality conditions in the city of Brockton, MA. The IRI values estimated with this new method match the actual road conditions measured with Pavement Condition Index (PCI) based on the ASTM standard, images taken from an onboard camera and passengers' perceptions. IRI has negative correlation with PCI in general since they have overlapping features. Compared to the current method of IRI measurement, the advantage of this method is that a) the cost is reduced; b) more space is saved; c) more time is saved; and d) mounting the two sensors are universally compatible to most cars and vans. Therefore, this method has the potential to provide continuous and global monitoring the health of roadways.

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • 한국도로학회논문집
    • /
    • 제8권2호
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

노후화된 시멘트 콘크리트 포장에 대한 콘크리트 및 아스팔트 덧씌우기의 포장성능 비교 (Comparison of the Pavement Performance for Concrete Overlay and Asphalt Overlay on Aged Cement Concrete Pavement)

  • 이승우;손현장
    • 한국도로학회논문집
    • /
    • 제13권2호
    • /
    • pp.31-39
    • /
    • 2011
  • 국내 고속도로의 60% 이상이 시멘트 콘크리트 포장으로 건설되었으며, 그 중 공용년수가 20년이 넘어선 구간이 절반 이상에 달하고 있다. 노후화된 시멘트 콘크리트 포장의 보수 보강은 국내의 교통여건상 우회도로가 준비되기 어렵기 때문에 조기 교통개방이 요구되며 현재까지는 주로 아스팔트 덧씌우기가 사용되고 있다. 반면에 아스팔트 덧씌우기 포장은 조기 파손으로 인해 많은 유지보수비용이 지출됨과 동시에 도로사용자의 불편을 초래하고 있다. 최근 들어 노후화 된 시멘트 콘크리트 포장의 효율적인 보강공법으로 접착식 콘크리트 덧씌우기 공법에 대해서 적용을 시도하고 있다. 따라서 아스팔트 덧씌우기 포장과 접착식 콘크리트 덧씌우기 포장의 합리적인 선택에 대한 비교 분석을 위해 포장의 연도별 파손상태에 대한 다양한 data가 필요하다. 하지만, 국내에서는 아스팔트 덧씌우기 포장과 접착식 콘크리트 덧씌우기 포장의 공용 중 파손상태에 대한 자료가 체계적으로 구축되어있지 않다. 본 연구에서는 아스팔트 덧씌우기와 접착식 콘크리트 덧씌우기 공법이 적용된 구간의 파손에 대해 충분한 자료를 구축하고 있는 미국의 LTPP Data를 이용하여, 공용성에 대해서 평가하였다. 단, 아스팔트 덧씌우기와 접착식 콘크리트 덧씌우기 공법은 파손형태가 서로 상이함으로써, 상대적인 비교를 위해 각각의 구간에 대해 포장상태지수(PCI, Pavement Condition Index)를 Database화 하였으며, 아스팔트 덧씌우기 구간과 접착식 콘크리트 덧씌우기 구간의 수명에 대해서 비교 분석을 수행하였다.

예방적 유지보수 공법의 현장 적용성능 평가 연구 (Field Performance Evaluation of Preventive Maintenance Methods)

  • 이상염
    • 한국도로학회논문집
    • /
    • 제19권2호
    • /
    • pp.103-112
    • /
    • 2017
  • PURPOSES : In this study, field performance evaluation of crack treatment of pavement and the feasibility of surface treatment of pavement are presented. The performance and cost of preventive maintenance methods have been previously verified, and the methods are being used in many developed countries and cities. However, the performance and cost of the system have not been verified in domestic, field applications. Therefore, in order to improve performance, the field performance is evaluated, and a reasonable cost is proposed. METHODS : Visual Inspection was conducted to evaluate the field application and performance of the preventive maintenance method. In addition, the PCI index was calculated from the results of visual inspection of the application area of the surface treatment method, and the performance life of each method was predicted. For the economic evaluation, life cycle cost analysis was performed using the life cycle cost analysis program. RESULTS :In order to evaluate and quantify the field performance of crack repair material, the residue condition of the pavement surface after crack treatment, rather than the performance of the material, is evaluated. In addition, the crack resistance and performance life of surface treatment methods are evaluated. The cost of currently available treatment methods are compared to the common pavement cut and overlay method, and it is determined that the preventive method is not economical based on life cycle cost analysis. CONCLUSIONS :Because of the characteristics of cracking, it is necessary to conduct the evaluation of currently applied methods and the analysis of the cause of damage, by visual inspection. Moreover, in order to evaluate the performance and economic suitability of the currently applied surface treatment methods, it is necessary to acquire information on application sections by monitoring their long-term conditions and performance.

고속도로 접착식 콘크리트 덧씌우기 포장의 공용성 분석 (Performance Evaluation of Bonded Concrete Overlay in Highway)

  • 박종원;김영규;한승환;이승우
    • 한국도로학회논문집
    • /
    • 제16권1호
    • /
    • pp.1-10
    • /
    • 2014
  • PURPOSES : This study aimed to evaluate the long-term performance of bonded concrete overlay in Korean Highway, and factors influencing the performances. METHODS : The evaluation for long-term performance of bonded concrete overlay is investigated based on the following study : i) The pavement distress of number of bonded concrete overlay sections in Korean highway are collected through field measurement, and PCI for each section is calculated. ii) Performance of LTPP data of bonded concrete overlay sections in U.S.A is analysed. And it is compared with bonded concrete overlay of Korean highway. iii) An analysis of the factors influencing to long-term performance of bonded concrete overlay is investigated. RESULTS : Performance analysis was confirmed that the overlay thickness was affecting significantly on the Bonded Concrete Overlay life. The comparison of LTPP data(U.S.A) and field measurement data(Korean) was showed. CONCLUSIONS : It was showed that the performance of Korean bonded concrete overlay is relatively lower than that of the bonded concrete overlay in U.S.A. The cause of lower performance can be explained by the lack of overlay thickness.