• Title/Summary/Keyword: Path duration

Search Result 134, Processing Time 0.026 seconds

A Path Analysis of Musculoskeletal Disases and Related Factors in Shipbuilding Workers (조선소 근로자의 근골격계 질환과 관련 요인 간의 경로 분석)

  • Park, Eun-Young;Kim, Won-Ho
    • Physical Therapy Korea
    • /
    • v.15 no.3
    • /
    • pp.53-61
    • /
    • 2008
  • The purpose of this study was to examine the path analysis of factors related to musculoskeletal diseases of shipbuilding workers by considering related factors synthetically. The survey was completed by 1,536 shipbuilding workers and except for poor responses, 1,532 were analyzed. The survey consisted of questions about lifestyle, duration of service, physical and mental stress, and musculoskeletal diseases. The collected data was analyzed with SPSS/PC+ (a descriptive statistics program) and with AMOS 4.0 (a statistical program for path modeling) to test whether the hypothesized path model fitted the collected data. The results of the correlation analysis showed that musculoskeletal disease was associated with duration of service (r=-.095), physical stress (r=.077), and mental stress (r=.602). The results of the hypothesized path model satisfied the criteria required in relation to fitting the collected data. Musculoskeletal disease was directly affected by mental stress but not by physical stress, duration of service and life style. Thus, it is suggested that reducing mental stress is a strategy for the prevention for musculoskeletal disease.

  • PDF

Inference of the Probability Distribution of Phase Difference and the Path Duration of Ground Motion from Markov Envelope (Markov Envelope를 이용한 지진동의 위상차 확률분포와 전파지연시간의 추정)

  • Choi, Hang;Yoon, Byung-Ick
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.26 no.5
    • /
    • pp.191-202
    • /
    • 2022
  • Markov envelope as a theoretical solution of the parabolic wave equation with Markov approximation for the von Kármán type random medium is studied and approximated with the convolution of two probability density functions (pdf) of normal and gamma distributions considering the previous studies on the applications of Radiative Transfer Theory (RTT) and the analysis results of earthquake records. Through the approximation with gamma pdf, the constant shape parameter of 2 was determined regardless of the source distance ro. This finding means that the scattering process has the property of an inhomogeneous single-scattering Poisson process, unlike the previous studies, which resulted in a homogeneous multiple-scattering Poisson process. Approximated Markov envelope can be treated as the normalized mean square (MS) envelope for ground acceleration because of the flat source Fourier spectrum. Based on such characteristics, the path duration is estimated from the approximated MS envelope and compared to the empirical formula derived by Boore and Thompson. The results clearly show that the path duration increases proportionately to ro1/2-ro2, and the peak value of the RMS envelope is attenuated by exp (-0.0033ro), excluding the geometrical attenuation. The attenuation slope for ro≤100 km is quite similar to that of effective attenuation for shallow crustal earthquakes, and it may be difficult to distinguish the contribution of intrinsic attenuation from effective attenuation. Slowly varying dispersive delay, also called the medium effect, represented by regular pdf, governs the path duration for the source distance shorter than 100 km. Moreover, the diffraction term, also called the distance effect because of scattering, fully controls the path duration beyond the source distance of 300 km and has a steep gradient compared to the medium effect. Source distance 100-300 km is a transition range of the path duration governing effect from random medium to distance. This means that the scattering may not be the prime cause of peak attenuation and envelope broadening for the source distance of less than 200 km. Furthermore, it is also shown that normal distribution is appropriate for the probability distribution of phase difference, as asserted in the previous studies.

Energy approach for dynamic buckling of shallow fixed arches under step loading with infinite duration

  • Pi, Yong-Lin;Bradford, Mark Andrew;Qu, Weilian
    • Structural Engineering and Mechanics
    • /
    • v.35 no.5
    • /
    • pp.555-570
    • /
    • 2010
  • Shallow fixed arches have a nonlinear primary equilibrium path with limit points and an unstable postbuckling equilibrium path, and they may also have bifurcation points at which equilibrium bifurcates from the nonlinear primary path to an unstable secondary equilibrium path. When a shallow fixed arch is subjected to a central step load, the load imparts kinetic energy to the arch and causes the arch to oscillate. When the load is sufficiently large, the oscillation of the arch may reach its unstable equilibrium path and the arch experiences an escaping-motion type of dynamic buckling. Nonlinear dynamic buckling of a two degree-of-freedom arch model is used to establish energy criteria for dynamic buckling of the conservative systems that have unstable primary and/or secondary equilibrium paths and then the energy criteria are applied to the dynamic buckling analysis of shallow fixed arches. The energy approach allows the dynamic buckling load to be determined without needing to solve the equations of motion.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

Scaling Inter-domain Routing System via Path Exploration Aggregation

  • Wang, Xiaoqiang;Zhu, Peidong;Lu, Xicheng;Chen, Kan;Cao, Huayang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.3
    • /
    • pp.490-508
    • /
    • 2013
  • One of the most important scalability issues facing the current Internet is the rapidly increasing rate of BGP updates (BGP churn), to which route flap and path exploration are the two major contributors. Current countermeasures would either cause severe reachability loss or delay BGP convergence, and are becoming less attractive for the rising concern about routing convergence as the prevalence of Internet-based real time applications. Based on the observation that highly active prefixes usually repeatedly explore very few as-paths during path exploration, we propose a router-level mechanism, Path Exploration Aggregation (PEA), to scale BGP without either causing prefix unreachable or slowing routing convergence. PEA performs aggregation on the transient paths explored by a highly active prefix, and propagates the aggregated path instead to reduce the updates caused by as-path changes. Moreover, in order to avoid the use of unstable routes, PEA purposely prolongs the aggregated path via as-path prepending to make it less preferred in the perspective of downstream routers. With the BGP traces obtained from RouteViews and RIPE-RIS projects, PEA can reduce BGP updates by up to 63.1%, shorten path exploration duration by up to 53.3%, and accelerate the convergence 7.39 seconds on average per routing event.

A LONGITUDINAL STUDY ON PREDICTION OF ERUPTIVE PATH AND IMPACTION OF MAXILLARY CANINE (상악견치(上顎犬齒)의 맹출로예측(萌出路豫測) 및 매복(埋伏)에 관(關)한 누년적(累年的) 연구(硏究))

  • Son, Tae-Won;Lee, Dong-Joo
    • The korean journal of orthodontics
    • /
    • v.22 no.1
    • /
    • pp.159-168
    • /
    • 1992
  • To predict eruptive path of maxillary canine, 13 male and 11 female malocclusions were longitudinally studied for 4 years. And to study frequency and distribution of impaction of maxillary canine, 1500 malocclusions were studied. The path, velocity and duration of maxillary canine eruption were determined by periodic angular and linear measurement using periodic orthopantomograms and cephalograms. The following results were obtained. 1. Maxillary canine was erupted with $14.5^{\circ}$ distal tipping from initial stage $98.1^{\circ}$ to final stage $83.6^{\circ}$ of axial inclination on orthopantomogram. 2. Eruptive velocity of maxillary canine was fastest on stage 4, and mean eruptive velocity was 10.5mm per year on stage 4. 3. Eruption of maxillary canine was completed 12 year 5 months in male and 11 years 8 months in female. 4. To predict the duration for eruption completion by position of maxillary canine on cephalogram, regression equation was obtained. 5. Frequency of impaction of maxillary canine was 1.47% in malocclusion and more frequent in male. Distribution of buccal and palatal, right and left impaction was no different, but unilateral impaction was more frequent.

  • PDF

A Study on Characteristic of Visitor's Behavior and Circulation Path Type in Art Museum Exhibition Space (미술관 단위전시실의 경로선택 유형과 관람행동 특성에 관한 고찰)

  • Choi, Jun-Hyuck
    • Korean Institute of Interior Design Journal
    • /
    • v.17 no.2
    • /
    • pp.83-90
    • /
    • 2008
  • This study attempts to understand the arrangement and spatial requisites of art pieces by materializing the visitors' path of movement in the exhibition space, as well as researching their behavior. The purpose of the research is to the guideline for planning the exhibition layout and visitors' circulation can be derived in order to correspond to the visitors' characteristic of movement and circulation-path choice. Although such guideline may have limited use, it is still significant enough to be studied. Taking three Korean art galleries as the subjects of research, this study observes the arrangement of art pieces, movement path of visitors, characteristics of the visitors' behavior and the duration time a visitor takes to view an art piece without moving around in order to understand the arrangement and spatial requisites of art pieces which correspond to the visitors' behavior. The following results have been drawn in this research and analysis; First, when there is an island type exhibition other than the ordinary on-the-wall display in the exhibition space, the visitors' choice of path changes. In short, an island type exhibition seems to be a factor that changes the visitors' path. Second, in the entrance of an exhibition space unit, most of the visitors seem to choose a path which moves counter-clockwise. Third, it is considered that well-known art pieces or art pieces with a big size shall not be displayed on the comer of the exhibition room.

Estimation of Characteristics of Meteor Burst Radio Path Using Reference Path Comparison Method (참조 경로 비교법을 이용한 유성 버스트 무선로의 특성 추정)

  • 김병철;김기채;이무영
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.9 no.1
    • /
    • pp.72-86
    • /
    • 1998
  • This paper introduces a simple yet accurate method to predict burst rate and durence expected in a meteor burst communication path in question by comparing its path specifications to those of an exiting path. In this article, the authors analyze the method to derive the burst rate and duration by comparing span distance, frequency, antenna gain, transmitting power and thre- shold level to those of a existing path selected for the reference. the authors further report the result of experiments made for two difference paths; 750 km path and 1,200 km path to Hamamatu Japan and Hatinohe Japan from Kyongsan korea respectively. The occuring rate and average length of the bursts measured on the experiment paths show fairly good agreement with the analysis.

  • PDF

Studies on Post Contract Schedule Analysis (준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구)

  • KIHYUK, KO;SUNGPIL, PARK;YONGKIL, KIM
    • Journal of Arbitration Studies
    • /
    • v.32 no.4
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.