• Title/Summary/Keyword: Passenger/Freight mixed train

Search Result 4, Processing Time 0.019 seconds

A Comparison Study on the Parcel Transport Service Model-using High-Speed Passenger/Freight Mixed Train (여객/화물 고속복합열차를 이용한 소화물 운송 서비스 모델 비교연구)

  • Yum, ByongSoo;Ha, Ohkeun;Lee, Jinsun
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.471-480
    • /
    • 2015
  • Reliance on road transport in domestic logistics can lead to intensified congestion and greenhouse gas emissions due to the rise in oil prices, any increase in logistics costs can have a high social cost. The government policy on Low Carbon Green Growth is seeking to take advantage of the railway system. However, existing railway transport logistics systems, for reasons such as low speed, low track capacity constraints, and the impossibility of implementing a Door to Door system, make it difficult to activate a railway logistics program. As a result of this study, a national R&D project to develop a High-Speed Passenger/Baggage Mixed Train(Hy-SoBex) utilizing the rail capacity constraints to overcome the difficulties of linking an air cargo and freight railway logistics system, we propose a variety of service models and select the optimal service model.

A Study on the Additional Train Scheduling Method (열차 증편방법에 관한 연구)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.313-319
    • /
    • 2014
  • Additional train scheduling is often required to increase the capacity of transporting passengers or freight. In most previous studies on scheduling additional trains, operation time of the added train is designated first; and then the train operation feasibility is examined. However, it is often difficult to apply this approach to domestic trains because the density of the railroad network in Korea is high and various types of trains are in use. Moreover, for freight trains, it is even more challenging because the delay is accumulated due to lower priority whenever a freight train and a passenger train contend for a common segment of rail. In this paper, we address the additional train scheduling problem which entails finding a feasible schedule for an additional train having a fixed departure time or departure time windows. The problem is modeled as a mixed integer programming and a column generation technique is used to solve it.

An Exploratory Development of Mathematical Programming Model for the Railway Conflict Resolution Problem on a Single Line Track (단선구간 열차경합해소 문제를 위한 수리계획 모형의 기본설계)

  • Oh Seog-Moon;Hong Soon-Heum;Kim Jae-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.314-320
    • /
    • 2005
  • This paper is designed to help train dispatcher resolve railway conflicts in rent-time. We developed a mixed integer programming model to optimize the train schedule that determines the best overtaking or crossing positions, The objective of the model is to minimize the maximum lateness of the trains and reduce the total sum of the lateness, while satisfying the field constraints associated with the difference between passenger trains and freight trains, and the limited number of sidings. We applied the model on a portion of a single line track, Joong-Ang Line to ascertain the efficiency of the model, and showed how the model can be used to resolve the railway conflicts. The results indicates that our model can provide useful results in terms of optimal schedule for the test problem. This type of modeling approach would be useful for a train dispatcher to make a real-time railway conflict resolution.

Mixed Operation with Express Train for Urban Railways in Seoul Metropolitan Area (대피선 설치를 통한 수도권 광역철도 급행화 방안)

  • Son, Gi-Min
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.195-207
    • /
    • 2007
  • The urban railways connecting between the inner city and suburb of Seoul metropolitan area, has lost the competitiveness against cars because too many stops deteriorated operating speed and passenger's level of service. This paper suggests that an express train should be introduced into the urban railway system in order to sort out such a complication. There are two considerations in the present study. Firstly, train schedule problem should be taken into account. In this regard, a new model for urban railway system was developed by revising the existing models dealing with single line freight railway. Approximate branch and bound algorithm based on conflict group rather than a single conflict was adopted. Consequently, it was found that the time saving in calculating the optimal schedule is the most meaningful contribution of the algorithm. The second consideration is associated with the application of the model. A case study was carried out using the actual operation data from Ansan line. In conclusion, the operation speed of the line can increase considerably with minimal number of new sidings.