• Title/Summary/Keyword: Park construction time

검색결과 1,501건 처리시간 0.035초

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Construction Safety Management Framework based on Smart Mobile

  • Park, Moon-Seo;Kim, Eui-Jun;Lee, Hyoo-Soo;Lee, Kwang-Pyo
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.48-57
    • /
    • 2012
  • With increasing number of serious construction disasters such as death, a safety management in real-time is more required recently. One of the ways to support the needs, a convergence with Information Technology (IT) has been noticed. Although number of inefficiencies including a limitation of IT equipment (weight, control inconveniences) has been concerned, data exchanging and processing fields have been improved at a wide range with an advance of mobile communication and an introduction of smart mobiles that are simple and convenient. In this research, a framework is realized in connection with smart mobile to find the problems of current safety management and derive demands in order to support effective safety management. Two smart mobile applications, Safety Management application and Safety Guideline application, enable a real-time safety management and less re-work by provided safety information.

피톤치드를 함유한 기능성 시멘트 경화체의 특성에 관한 연구 (Study on the Properties of Functional Cement Matrix using Phytoncide)

  • 김현성;김선아;박선규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.29-30
    • /
    • 2018
  • The development of the industry has increased the indoor living time of modern people. Therefore, indoor pollution is attracting attention as a social issue. One of the indoor air pollution is formaldehyde. Formaldehyde has been classified as a first-level carcinogen by international cancer research organizations. Formaldehyde has been used to protect products such as construction materials and finish materials, and being diffused in the interior construction process. In this study, we used phytoncide with cement matrix to reduce formaldehyde, an indoor environmental contaminant. The strengths was increased slightly and formaldehyde showed a reduction effect over time.

  • PDF

해상 자켓 구조물 파일 모니터링 현장 사례 (Pile Moniotring for Offshore Jacket Structures ; Field Study)

  • 김대학;이규환;박찬덕;문상욱;김학중
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.1237-1244
    • /
    • 2006
  • This research discussed about method for basis construction of sea jacket construction. Several access ways of method for foundation construction of sea jacket construction are used. Accompany many efforts of design and build process to overcome the form of construction work and application equipment, special quality of construction and restriction and so on of sea environment in the case of pile foundation. Therefore, great many factor of sea condition, construction special quality, base condition, construction time, equipment composition, worker composition etc. shows other work form in spot at sea jacket construction process.

  • PDF

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

3D Infill을 활용한 PC모듈러 시공시스템 개발 (Development of PC modular Construction System using 3D Infill)

  • 정준수;임석호;허병욱;채지용;박진호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.14-15
    • /
    • 2020
  • The need for off-site construction has increased in the construction industry in Korea in recent years due to the enforcement of the 52-hour workweek, the increasing age of workers on construction sites, the deepening dependence on overseas workers, and the stagnation of productivity in the construction industry. Thus, studies on OSC started in April 2020. In addition, as a national policy study advocating the modular construction method, which is one of the OSC methods, was completed in the first half of 2019. 70 housing units in two complexes that satisfied the Housing Act requirements have been supplied to citizens. However, although modular construction methods have been recognized as a dramatic construction method that achieves shortened construction schedules and solves the issues of cost reduction and the shortage of technical workers on sites by combining the advantages of the manufacturing industry and applying the economies of scale, realistically it has issues due to the rising cost of steel and a low pre-fabrication ratio. Moreover, the construction time of core parts, such as those built by pouring concrete, has become a factor that hinders the shortening of construction times. Thus, this study aims to propose a precast concrete(PC) modular construction system, which fuses three-dimensional infill as an interior finish material and a three-surface PC module that can acts as a structure for a construction method that is economical and can shorten construction time.

  • PDF

기행문 - 스페인에서 본 천재 예술가(藝術家) 가우디(Antoni Gaudi)가 설계.시공한 구엘공원(Park G$\ddot{u}$ell) 주거단지와 경내(境內)에 건설한 석조교량(石造橋梁)에 대한 소고(小考) (Travel of the Park G$\ddot{u}$ell in Spain Barcelona which were designed and made a construction by Antoni Gaudi, as a genius artist, and review the works of residential development-Park G$\ddot{u}$ell, and also bridge made by stone bricks in the compound)

  • 조규영
    • 건설안전기술
    • /
    • 통권55호
    • /
    • pp.37-51
    • /
    • 2012
  • There is a shround of mystery surronnding Gaudi. In all probability, the first mist preventing us from gaining acess to his work is the intrinstic mysteriousness of all genius and, at the end of the day, of all human spirit. The situation is complicated by the well-known fact that Gaudi wished to creat an aura of silence around his persona, while, at the same time as maintaining this secretiveneness - in other words, the annihiliation of his fundamental values-gave expression and symbolisation to his moods and incerdible mental power. On a piece of land on the Muntanya Pelada, in the Barcelona district of La Salut, Eusebi G$\ddot{u}$ell Wanted to build an urbanisation inspired by the concepe of the garden city. in this he sought to return to nature, health and an escape from the insalubrous industrial city. Gaudi worked on the construction of this park between 1900 and 1914, and even moved his home there in 1906. An outstanding feature of park G$\ddot{u}$ell is the integration of architecture with nature. In other to save the natural slopes, Gaudi built viaducts from brick pillars, which he covered with stone obtained from the excavation.

  • PDF

AI기반 콘크리트 마감 자동화 시스템용 응결추정계의 물시멘트비에 따른 응결추정 평가 (Estimation of Setting Time Applying Setting Estimator for AI Finishing Robot System Depending on Water-Cement Ratio)

  • 박재웅;정준택;임군수;한준희;김종;한민철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.17-18
    • /
    • 2023
  • This study aims to compare the hardness value development characteristics according to the water-cement ratio during a series of experiments to develop a setting estimator for an AI-based concrete finishing automation system. For the test variables, water-cement ratios are varied with 30, 40 and 50%. Proctor penetration test and surface hardness test by setting time estimator are conducted to estimate the setting time. For the effect of water-cement ratios, they did not affect the surface hardness either, while initial set time and final set time are not constant with water-cement ratios.

  • PDF

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • 인간식물환경학회지
    • /
    • 제23권3호
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.