1 |
F. Pena-Mora, G.H. Dwivedi, "Multiple Device Collaborative and Real Time Analysis System for Project Management in Civil Engineering", Journal of Computing in Civil Engineering, vol. 16, no. 1, pp. 23-28, 2002.
DOI
ScienceOn
|
2 |
M. Schneider, "Radio Frequency Identification (RFID) Technology and its Application inthe Commercial Construction Industry", University of Kentucky, 2003.
|
3 |
H.P. Tserng, R. Dzeng, Y. Lin, S. Lin, "Mobile Construction Supply Chain Management Using PDA and Bar Codes", Computer-Aided Civil and nfrastructure Engineering, vol. 20 no. 4, pp. 242-264, 2005.
|
4 |
Y. Yang, H. Choi, J. Kim, "Integrated operation method of safety checklist and schedule for construction acccident prevention", Journal of Korea Institute of Construction Engineering and Management, vol. 5, no. 2, pp. 123-135, 2004.
|
5 |
D. Yeom, "An Investigation on the Current Safety Management System and Suggested Guide", Woosong University, 2008.
|
6 |
X. Yu, V.P. Drnevich, "Mobile Computer for Portable Field Instrumentation System", ASCE GeoCongress 2006 : Geotechnical Engineering inthe Information Technology Age, Atlanta, GA, USA, pp. 1-6, 2006.
|
7 |
Y. Kim, "PDA prototype system for construction facilities safety suprevision", KonKuk University, 2003.
|
8 |
Y.S. Kim, S.W. Oh, Y.K. Cho, J.W. Seo, "A PDA and wireless web-integrated system for quality inspection and defect management of apartmet housing projects", Automation in Construction, vol. 17, no. 2, pp. 163-179, 2008.
DOI
ScienceOn
|
9 |
K. Kimoto, K. Endo, S. Iwashita, M. Fujiwara, "The application of PDA as mobile computing system on contruction management", Automation in Construction, vol. 14, no. 4, pp. 500-511, 2005.
DOI
ScienceOn
|
10 |
B. Kwon, "A Study on the Improvement of Current Construction Safety Management System", In-Cheon University, 2009.
|
11 |
I.O. Oh, C.S. Kim, J.S. Park, M.W. Pyeon, "Unit Technology Integration Scenario for the Application in Construction Work Sites", International Conference on Networked Computing and Advanced Information Management, pp. 472-477, 2010.
|
12 |
J. Lee, "Study on Applicaton of Web-Based PDA System by an Analysis of Construction Confirmation Work Process in Public Apartment Project", Han Yang University, 2010.
|
13 |
K. Lee, H. Lee, M. Park, H. Kim, Y. Baek, "Development of Real-Time Locatig System for Construction Safety Management", Journal of Korea Institute of Construction Engineering and Management, vol. 11, no. 2, pp. 106-115, 2010.
DOI
ScienceOn
|
14 |
Ministry of Employment and Labor, "Analysis on industrial accidents 2007", pp. 1-12, 2007.
|
15 |
J. Park, J. Lim, S. Kwon, "A Study on the Framework Constructin of Mobile ERP System based on Smart-Phone", Journal of the Architectural Institute of Korea, vol. 26, no. 10, pp. 123-130, 2010.
|
16 |
S. P. Peinado, A.J.V. Ricoj J.V. Caon, J.J. de las Heras, J.M. Mieres, "RFID-based Quality and Safety building site improvement during executiion phase", 35th Annual Conference of IEEE Industrial Electronic, pp. 2659-2664, 2009.
|
17 |
C. Choi, "A case stuydy and future directions of Radio Frequency Identification system in A/E/C industry", Korea Institute of Construction Engineering and Management Academy Conference, pp. 145-149, 2004.
|
18 |
M. Choi, "Improvement on construction safety management framework", Constrction Economy Research Institute of Korea, 1999.
|
19 |
A. Dong, M.L. Mahera, M.J. Kim, N. Guc, X. Wanga, "Construction Defect Management usign a Telematc Digital Workbench", Automation in Construction, vol. 18, no. 6, pp. 814-824, 2009.
DOI
ScienceOn
|
20 |
J.L. Funk, "The future of mobile phone-based intranet applications: A view form Japan", Technovation, vol. 26, no. 12, pp. 1337-1346, 2006.
DOI
ScienceOn
|
21 |
J. Irizarry, T. Gill, "Mobile Application for Information Access on Construction Jobsites", ASCE International Workshop on Computing in Civil Engineering, Austin, TX, USA, pp. 176-185, 2009.
|
22 |
J. Jung, T. Kim, H. Kim, Y. Jo, "A study on the improvement of current contruction safety management system", Korea Institute of Construction Engineering and Management Academy Conference, pp. 691-694, 2007.
|
23 |
M. Kang, K. Shin, J. Kim, "A study on Efficiency Increase of Construction Field Operations Using PDS", the Architectural Institute of Korea Academic Conference(Planning), vol. 23, no. 1, pp. 807-810, 2003.
|
24 |
B. Kim, D. Kim, U. Lee, B. Han, K. Kang, "Establishment of Integrated Instrumentation Management System for Retaining Wall via Internet and PDA", Journal of the Architectural Institute of Korea, vol. 21, no. 11, pp. 183-190, 2005.
|
25 |
S. Kim, U. Lee, K. Kang, "The study on the Proposals for Application to Information Technology in Field Construction", Korea Institute of Construction Academic Conference, vol. 5, no. 1, pp. 207-210, 2005.
|
26 |
T. Kim, C. Park, "A Scheme for Improving Site Labor Management using Information Management Technology", the Architectural Institute of Korea Academic Conference (Structure), vol. 24, no. 1, pp. 491-494, 2004.
|
27 |
Y. Chen, J.M. Kamara, "Using mobile computing for construction site information management", Engineering, Construction and Architectural Management, vol. 15, no. 1, pp. 7-20, 2008.
DOI
ScienceOn
|
28 |
S. Ahn, J. Yu, C. Kim, "A Study of Work Efficiency Management System Using PDA", Journal of the Architectural Institute of Korea, vol. 24, no. 11, pp. 143-151, 2008.
|
29 |
S. Bowden, A.Dorr, A. Thorpe, C.J. Anumba, P. Gooding, "Making the Case for Mobile IT in Construction", ASCE International Conference on Computing in Civil Engineering 2005, Cancun, Mexico, pp. 1-12, 2005.
|
30 |
S. Bowden, A. Dorra, T. Thorpeb, C. Anumbac, "Mobile ICT support for construction process improvement", Automation in Construction, vol. 15, no. 5, pp. 664-676, 2006.
DOI
ScienceOn
|
31 |
Y. Cho, "Application for Portable Wireless Device on Construction Site", the Architectural Institute of Korea, vol. 51, no. 6, pp. 52-53, 2007.
|