• Title/Summary/Keyword: Park Maintenance and Management

Search Result 786, Processing Time 0.033 seconds

Development of Vector-Photo Format for Construction and Maintenance Management (시공 및 유지관리를 위한 벡터사진포맷 개발)

  • Kim, Kyoon-Tai;Lim, Myung-Gu;Kim, Gu-Taek;Park, Nam-Cheon;Park, Su-Yeul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.118-119
    • /
    • 2013
  • Many pictures are taken in construction sites. However, the pictures are not being managed effectively. In this study, the need for vector-photo have been raised which combines pictures and 5W1H information, and the vector-photo format have been suggested. A test module and user-interface have been developed for validating an utility of the format proposed.

  • PDF

A Study on Development of Performance Measures for Level of Service(LOS) of Bridge Asset Management (교량 자산관리의 서비스수준 결정을 위한 성능척도 개발에 관한 기초연구)

  • Sun, Jong-Wan;Park, Kyung-Hoon;Lee, Min-Jae;Park, Cheol-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.101-110
    • /
    • 2011
  • Because bridges can cause more significant damage than other infrastructure a certain level of safety shall necessarily be secured for users. As most of bridges' service life become 20-30 years there will be a dramatic increase in the maintenance and repair cost but the budget and human resource will be limited. Asset management technique can help the efficiency in maintenance and budget management with the limited resource. For its application, there must be a way to evaluate how bridges provide service to users. The level of service can be quantified by a performance measure. This study introduces performance measures and an evaluation process for the determination of level of service. The evaluation results will be used as a fundamental information in the determination of maintenance/repair/management targets and in the decision making process of the bridge asset management.

A Maintenance and Administration of the Interworking System between PSTN and PSDN (PSTN-PSDN 연동 장치의 유지보수 및 운용관리)

  • Chung, Tae-Soo;Park, Hee-Yong;Lee, Hyun-Tae;Park, Kyung-Sae
    • Proceedings of the KIEE Conference
    • /
    • 1987.07b
    • /
    • pp.916-920
    • /
    • 1987
  • This paper describes the maintenance function and administration function in the IWS (InterWorking System between PSTN and PSDN) which Interconnects the PSTN and PSDN. The former function is for the stable operation of the IWS system, and the latter function is for the management of the subscriber, billing and statistics informations.

  • PDF

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

An applicable RCM method for Track circuit equipment of AREX's Signalling System (공항철도 궤도회로장치에 대한 RCM 적용 방안)

  • Song, Mi-Ok;Lim, Sung-Soo;Lee, Chang-Hwan;Park, Seung-Keun
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1126-1131
    • /
    • 2008
  • In this paper we introduce an applicable RCM(Reliability centered maintenance) method for Track circuit equipment of AREX's Signalling System. AREX computerize all the process of FRACAS(Failure Reporting, Analysis and Corrective Action System)) by the Facility Management System of Integrated Information System. These datum were analysed and reproduced as the RAMS index value which can be used by maintenance staff for optimizing the maintenance method of the System.

  • PDF

Development of Maintenance-Service Model for Small Photovoltaic Equipment (소형 태양광발전설비의 유지관리 서비스 모델 개발)

  • Kang, Seok-Hwa;Park, Byeong-Hun;Choei, Jong-Won;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.234-235
    • /
    • 2015
  • In South Korea, small photovoltaic equipment is increasingly adopted in more detached houses on the constant basis. With this broader use of small photovoltaic equipment, its systematic maintenance becomes all the more necessary. However, photovoltaic facility maintenance has been concentrated solely on large-scale solar energy generation plants in the country while hardly covering smaller facilities. In this research, the JEM rule and extant maintenance company services were analyzed to develop a proper maintenance model for small photovoltaic equipment. The maintenance service procedures designed herein are as follows: A small photovoltaic equipment user chooses a maintenance company and signs a contract. Once a contract is made, the Korea Energy Management Corporation provides a certain kind of incentive to the company. The company provides maintenance service to the user and receives a service fee. If such a maintenance service model is in place, small photovoltaic equipment efficiency is expected to increase and users could receive systematic maintenance services. Also the new creation of small photovoltaic equipment maintenance service would form a new market to generate more jobs for the society.

  • PDF

A Study on the Rolling Stock Assembly using Heavy Maintenance Factory (전동차 중정비 시설을 활용한 완성차 조립에 관한 연구)

  • Lee, Duk-Gyu;Park, Man-Su;Song, Moon-Shuk;Son, Young-Jin;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1418-1425
    • /
    • 2011
  • Subway operators in the country have their own heavy maintenance facilities for maintaining rolling stock(EMU). However, it is true that the heavy maintenance facilities are not utilized 100% with the recent trend of lengthening maintenance cycle(intervals). With the fact, this enabled the existing maintenance facilities to be utilized for other purposes. By taking advantage of spare facilities and the maintenance staff with rolling stock assembly abilities, subway operators can assemble rolling stock by procuring parts for the assembly instead of purchasing trains from other companies. It is estimated that this will enhance the operator's technology and have a great impact on the management skill as well. This study attempts to find out how the heavy maintenance factory can be utilized for rolling stock assembly.

  • PDF

A Study on the Safety Consciousness between Permanent and Temporary Workers and the Improvement of Safety Management System about Railroad Facilities Maintenance's Outsourcing Operation (철도시설물 유지보수 외주화에 따른 직영 및 외주직원간 안전의식 분석 및 개선에 관한 연구)

  • Park, Sung-Min;Lee, Won-Young
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.6
    • /
    • pp.79-83
    • /
    • 2013
  • The advent of private railroad corporations presented many problems on administration's effectiveness. These brought an effect on safety management too. Most public railroad corporations maintain their rolling stocks and facilities by their own workers. On the other hand, private railroad corporations depend on outsourcing to cut down the cost of maintenance. But they have similar safety management systems. Therefore we investigated the gap between the two types of corporations, focusing on workers' safety attitude and proposed solutions to improve safety management systems in private railroad corporations.

Research on Data-Driven Railway Risk Assessment Criteria (데이터 기반 철도 위험도평가 기준에 관한 연구)

  • Eun-Kyung Park
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.4
    • /
    • pp.555-562
    • /
    • 2023
  • The Railway Safety Act of 2014 strengthened the 'Railway Safety Management System' to establish autonomous safety management for railway operators and railway facility managers. Accordingly, it is required to establish and implement risk assessment and safety measures for risk management. However, the current risk assessment system is carried out at the fragmented safety management level within individual fields, which has caused difficulties in establishing and implementing risk assessment and safety measures. In addition, the technical standards of the safety management system stipulate that risk assessment of railway operators is mandatory, so standardized standards for risk assessment of railway facilities and railway vehicle maintenance are needed. Therefore, in this paper, we first verified railway risks by analyzing railway accident data for the last 10 years, and proposed a standardized framework to effectively assess and manage risks through a case study of a condition-based smart maintenance system developed based on railway vehicle maintenance data.

Economic Assesment for Track Ballast Structures based on Proper Maintenance Level (적정 유지관리수준에 기초한 궤도도상구조에 대한 경제성 검토)

  • Baek, Jae-Wook;Joo, Hwan-Joong;Song, Yoo-Seob;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.167-178
    • /
    • 2007
  • In general, it is known that the concrete ballast track is possible to reduce a cost of maintenance activities cause of maintenance free by restrictive maintenance in application of track ballast structures. However, if deteriorations and fracture mechanism of a material are considered, proper maintenance activities and repairing are continually required. For the problems, we evaluated an economical efficiency of the gravel ballast and the concrete ballast on a proper level of maintenance activities. As the method based on history path is difficult to obtain sufficient reliabilities cause of an absence of real data for maintenance activities, we chose the delphi survey method by professional group, and we obtained the appropriate index and profiles for maintenance activities. As a result, we founded that effects for cost reduction can be expected by preventive maintenance management, and we proposed economical restrictions and life cycle cost for track ballast structures in a life cycle.