• Title/Summary/Keyword: Park Facility

Search Result 2,351, Processing Time 0.031 seconds

Evaluation of the Present Management Conditions for the Facilities in Moodeung-san Provincial Park (무등산(無等山) 도립공원(道立公園) 시설물(施設物)의 관리상태(管理狀態) 평가(評價)와 개선방안(改善方案))

  • Kim, Sang-Oh;Oh, Kwang-In
    • Journal of Korean Society of Forest Science
    • /
    • v.87 no.4
    • /
    • pp.590-600
    • /
    • 1998
  • This study applied the normative approach to establish evaluative standards for the facilities in Moodeung-san Provincial Park. Based on the established evaluative standards, this study examined the present facility managerial conditions of the park, and suggested some management alternatives to solve the identified problems. Data were collected by on-site survey and a mail-back questionnaire during August of 1996 in Moodeung-san Provincial Park. Out of 1,173, 519 respondents (44.2%) were used for the analysis. According to the results, three indicators out of five established indicators except 'adequacy of garbage cans' and 'adequacy of trail-guidance facilities' were in worse conditions than the established evaluative standards. The three indicators were 1) adequacy of toilets, 2) cleanness of toilets, 3) waiting time for using public transportations. The present condition for 'adequacy of trail-guidance facilities' was the same with the evaluative standard. This study suggested some management strategies to improve these problematic conditions, and introduced how managers may use these information for the facility management of the park.

  • PDF

Planning for the Yeonin Mountain Provincial Park (연인산 도립공원 조성계획)

  • Lee, Jun-Bok
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.1 s.120
    • /
    • pp.9-19
    • /
    • 2007
  • This plan was submitted as part of an invited competition for the provincial park planning of Yeonin Mountain, which was held by the Gyeonggi Innovation Corporation in November, 2006. The proposed site is located at Seungan-ri, Gapyung-eup, Gapyung-gun, Gyunggi-do and covers about $150,010m^2$. The main goal of this project is to "Suggest a New Park Paradigm" by shedding old ways of thinking about parks through an integrated development concept. Planning was approached as follows: First, providing an unique theme to the support facilities area of Yeonin Mountain Piovincial Park. To achieve this theme, the Seungan support facilities area was designated to be home to a Seven Colored Theme Garden, currently named the Native Wild-flower Garden, while the Baekdun facilities area is to be centered on a Self-loaming Forest Camp, which will give the chance of a hands-on wildlife experience. With these themes, which create recreational goals that will encourage not only tourism but education as well, the foundation was laid for a multi-purpose park paradigm. Second, Developing a Core Facility Zone. To accomplish the development of a core facility zone, park buildings will be arranged in accordance with an integrated building lay-out for easy access and use, and the facilities specified by design for the Seven Colored Theme Garden are provided for the newly prepared site. This will allow focus on the user's viewpoint instead of the view of the planner or of ease of maintenance.

An Analysis on the Determining Factors of Satisfaction for Environmental Improvement of Trails around Recreation Park - Focused on Suseong Recreation Park in Daegu - (유원지 주변 산책로의 환경개선을 위한 이용만족도 결정요인 분석 - 대구광역시 수성유원지를 대상으로 -)

  • Kim, Dong-Seok;Lee, Woo-Sung;Jung, Sung-Gwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.5
    • /
    • pp.28-39
    • /
    • 2015
  • The purpose of this study is to analyze users' behavior and facility satisfaction and to suggest the practical solution plans for environmental improvement of trails in Suseong recreation park in Daegu. Therefore, satisfaction factor analysis on trails was carried out based on a field and questionnaire survey in Suseong recreation park. First, from users' behavior, 48% of users visited Suseong recreation park for walking. The greatest response to number of visits was once or twice a week, and average use time per visit was 80.4 minutes. In terms of trails, the greater responses to the number of visits were once(38.1%) or more than 5 times(23.8%), and average use time was 45.4 minutes. According to the results from the analysis of facility satisfaction, management condition, length, slope, and adjacent natural landscape of trails were evaluated at a satisfaction rate higher than 3.4 points. However, water pollution, and number of exits and parking lots were analyzed at a low rate of 2.75 and 2.78 points, respectively. In terms of analyzing determining factors of facility satisfaction for trails, use of facilities, walking convenience, surrounding landscapes, amenities, and noise had a significantly positive effect on satisfaction. In particular, walking convenience was the highest effect factor; its standardized coefficient was 0.533. The findings from this study can contribute to the improvement of the physical environment for trails of Suseong recreation park and provide basic data for plan and maintenance of similar waterside trails.

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.2
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

Case Study of Safety Management at Small Industry Handling Hazardous Chemicals (유해화학물 취급 중소기업 시설 관리실태 현황 및 개선방안)

  • Song, Eunhee;Lee, Donghoon;Cho, Youngho;Kwak, Dongho;Park, Kyoshik
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2017
  • Small and medium industry facility handling hazardous chemicals was inspected and summarized. The inspection results were summarized in four categories such as hazards to process, storage, workers, and the others. The result was applied to further improvement of the facility. In conclusion, the industry intented to satisfy minimum requirement of regulation and they do not pay attention to keep maintaining the facility in integrity condition.

Development of a Rotating Turbine Test Rig (회전부를 장착한 터빈 시험장비 개발)

  • Park, Eung-Sik;Song, Seung-Jin;Hong, Yong-Shik
    • The KSFM Journal of Fluid Machinery
    • /
    • v.1 no.1 s.1
    • /
    • pp.58-63
    • /
    • 1998
  • To investigate turbine flow fields under realistic conditions, a rotating turbine test facility has been developed at the Inha University Propulsion Laboratory. The experimental facility consists of an air inlet, settling chamber, single turbine stage test section, and diffuser. This turbine has a design flow coefficient of 0.55 and work coefficient of 1.88. The turbine test rig has four features. First, a large scale test section improves space resolution. Second, low speed rpm enhances safety and reduces required power, Third, DC motor/generator is able to regenerate blower power. Fourth, various types of experiment can be carried out.

  • PDF

Dynamic Supplier-Managed Inventory Control and the Beneficial Effect of Information Sharing (공급자 주도의 동적 재고 통제와 정보 공유의 수혜적 효과 분석에 대한 연구)

  • Kim Eun-gab;Park Chan-kwon;Shin Ki-tae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.29 no.3
    • /
    • pp.63-78
    • /
    • 2004
  • This paper deals with a supplier-managed inventory(SMI) control for a two-echelon supply chain model with a service facility and a single supplier. The service facility is allocated to customers and provides a service using items of inventory that are purchased from the supplier, Assuming that the supplier knows the information of customer queue length as well as inventory position in the service facility at the time when it makes a replenishment decision, we identify an optimal replenishment policy which minimizes the total supply chain costs by reflecting these information into the replenishment decision. Numerical analysis demonstrates that the SMI strategy can be more cost-effective when the information of both customer queue length and inventory position is shared than when the information of inventory position only is shared.

A Study on Facility Layout for Optimamization of Material Flow System (물류시스템 최적화를 위한 설비배치에 관한 연구)

  • Park, Se-Joon;Lee, Young-Hae;Hur, Sun;Lee, Moon-Hwan;Yu, Ji-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

Productivity Improvement Plan Using Motion Analysis and Facility Relocation : Case Study (동작분석과 설비 재배치를 통한 생산성 향상 방안 : 사례연구)

  • Kim, Dong-Hyun;Park, Dong-Bin;Kwon, Ick-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.71-81
    • /
    • 2010
  • Today's fierce competition and global economic recession make most of manufacturing companies in the world difficult to gain a profit. In order to survive such a environment and increase competitiveness, manufacturing companies have to continuously eliminate their wasteful factors through an efficient process analysis, improve quality of products, increase the flexibility of manufacturing processes. In this paper, we consider a case study for the Shanghai New Auto which is a subcontractor of MOBIS in China, to improve productivity by using therblig method, one of the motion analysis, to minimize the work-in-process inventories and to shorten the manufacturing cycle times. We also try to relocate the facility layout to increase the efficiency and flexibility of manufacturing processes.

Application of Disaster Information Classification System for Disaster Management (시설물 재해관리를 위한 재해정보분류체계 구성 방안)

  • Kang Leen-Seok;Park Seo-Young;Moon Hyoun-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.335-342
    • /
    • 2006
  • Disaster management system should be built for minimizing damage factor that affects to construction facility from natural disaster. It could be classified by three categories such as disaster prevention, damage survey and recovery phases. For an integrated disaster management system, a disaster information classification system(DICS) is necessary for the reasonable disaster information management. This study suggests an integrated DICS that includes disaster type classification, facility type classification and information type classification for disaster management service. The applicability of suggested DICS is verified by railway facility and the research result could be used as a basic information system for national disaster management system.