• 제목/요약/키워드: Parallel tunnel

검색결과 146건 처리시간 0.021초

병렬 쉴드터널의 이격거리와 적용사례 (Distance between the Parallel Shield tunnel and Application)

  • 곽철홍;김재영;김동현;이두화;이승복;김응태;심재범
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.225-232
    • /
    • 2005
  • The construction of parallel tunnel by using the shield TBM method was increased recently. Accordingly the application and the propriety of the parallel shield TBM tunnels were studied through domestic and foreign construction cases herein. Also the behavior of tunnel structure and ground was evaluated by a numerical analysis with various ground conditions and the distance between the parallel tunnels. As a result, it was concluded that a deep investigation as well as a ground reinforcement was required with a ratio(L/D) of the distance between the parallel tunnels(L) to tunnel outer diameter(D) less than 0.5 because the Interference phenomenon was expected to occur. And the appropriateness of the application method of parallel shield TBM tunnel was validated through the 2-dimensional numerical analysis simulated the process of excavation after the ground reinforcement in the starting area of the OOO construction site with the ratio(L/D) of 0.35.

  • PDF

Analysis of Strategies for Installing Parallel Stations in Assembly Systems

  • Leung, John W.K.;Lai, K.K.
    • Industrial Engineering and Management Systems
    • /
    • 제4권2호
    • /
    • pp.117-122
    • /
    • 2005
  • An assembly system (AS), a valuable tool for mass production, is generally composed of a number of workstations and a transport system. While the workstations perform some preplanned operations, the transport system moves the assemblies by special designed pallets from one station to another. One common problem associated with automatic assembly systems is that some assembly operations may have relatively long cycle times. As a consequence, the productivity, as determined by the operations with the longest cycle time, can be reduced significantly. Therefore, special forms of parallel workstations were developed to improve the performance of an assembly system. In this paper, three most commonly used parallel stations: on-line, off-line and tunnel-gated stations in a free transfer assembly system are studied via discrete event simulation. Our findings revealed that the off-line parallel system has the best performance because the two independent parallel stations can lower the buffer requirement; reduce the sensitivity to variability of processing time and balance of a line. On-line parallel systems were found to have a relatively poor performance, because the operations of two parallel stations block each other, and higher buffer capacity is required to achieve similar capacity. The tunnel-gated system was more efficient than the on-line system since the first parallel station can operate independently. More importantly, we have quantified the productivity of the three different strategies mentioned. Engineers can choose the optimal strategies for installing parallel stations under their working environment.

암반 필라를 포함한 비대칭 근접 병설터널의 안정성 평가에 관한 연구 (A study on the stability analysis for asymmetry parallel tunnel with rock pillar)

  • 김도식;김영근
    • 한국터널지하공간학회 논문집
    • /
    • 제9권4호
    • /
    • pp.387-401
    • /
    • 2007
  • 최근 용지매입의 제한, 주변 구조물과의 간섭 등으로 두 터널의 이격거리가 매우 작은 근접 병설터널의 시공이 증가하고 있다. 이러한 경우 터널의 안정성뿐만 아니라 중앙 필라부의 안정성 확보를 위한 보강공법의 선정은 매우 중요한 문제라 할 수 있다. 본 연구에서는 상 하행선의 터널단면이 다른 비대칭 형태이면서, 두 터널간의 이격거리가 매우 근접한 병설터널에 대한 안정성 평가 및 필라부 보강방안에 대하여 상세한 해석적 검토를 수행하였다. 또한 근접 병설터널의 안정성을 확보할 수 있도록 암반 필라의 안정성 검토와 보강공법 등 근접 병설터널의 사례연구를 토대로 보강공법의 적정성과 합리적인 대안을 제시하였다. 특히, 굴착순서, 이격거리, 굴착방법에 따른 터널 거동 파악을 위하여 암반 필라의 응력상태 및 터널변위를 분석하여 암반파괴이론에 근거한 안정성 평가를 수행하였다. 또한 암반 필라부 보강공법의 적정성 검토 및 향후 근접병설 터널에서의 암반 필라 안정성 확보를 위한 개선방안을 제안하였다

  • PDF

대단면 근접병설터널에서의 필러부 거동특성 검토 (Review of Mechanical Behaviors of Pillar in Large Parallel Tunnel)

  • 신영완;김영근
    • 터널과지하공간
    • /
    • 제20권3호
    • /
    • pp.131-144
    • /
    • 2010
  • 근접병설터널은 충분한 이격거리를 확보한 병설터널의 거동특성과는 구별되는 거동특성을 보이므로 이에 대한 체계적인 안정성 평가방법을 대단면 근접병설터널 설계사례를 중심으로 고찰하였다. 또한 대단면 근접병설의 경우 필러부의 안정성을 확보하는 것이 본 터널의 안정성을 좌우하는 매우 중요한 요소라 할 수 있다. 본 검토에서는 대단면 근접병설터널 시공경험을 바탕으로 이격거리, 지반조건 및 굴착순서에 따른 필러부의 역학적 거동특성을 해석적으로 검토하여 대단면 근접병설터널 계획시 합리적인 터널설계 시공이 이루어질수 있도록 도움이 되고자 하였다.

Wind-tunnel study of wake galloping of parallel cables on cable-stayed bridges and its suppression

  • Li, Yongle;Wu, Mengxue;Chen, Xinzhong;Wang, Tao;Liao, Haili
    • Wind and Structures
    • /
    • 제16권3호
    • /
    • pp.249-261
    • /
    • 2013
  • Flexible stay cables on cable-stayed bridges are three-dimensional. They sag and flex in the complex wind environment, which is a different situation to ideal rigid cylinders in two-dimensional wind flow. Aerodynamic interference and the response characteristics of wake galloping of full-scale parallel cables are potentially different due to three-dimensional flows around cables. This study presents a comprehensive wind tunnel investigation of wake galloping of parallel stay cables using three-dimensional aeroelastic cable models. The wind tunnel study focuses on the large spacing instability range, addressing the effects of cable separation, wind yaw angle, and wind angle of attack on wake galloping response. To investigate the effectiveness of vibration suppression measures, wind tunnel studies on the transversely connected cable systems for two types of connections (flexibility and rigidity) at two positions (mid-span and quarter-span) were also conducted. This experimental study provides useful insights for better understanding the characteristics of wake galloping that will help in establishing a guideline for the wind-resistant design of the cable system on cable-stayed bridges.

2-Arch 터널과 병렬 터널 접속부에서의 텐션볼트를 사용한 필라 보강 방법에 대한 수치해석 (A Numerical Study on the Reinforcement Method of a Pillar Using Tension Bolts at the Connecting Part between 2-Arch Tunnels and Parallel Tunnels)

  • 박연준;최재진
    • 터널과지하공간
    • /
    • 제25권5호
    • /
    • pp.470-486
    • /
    • 2015
  • 2-아치 터널은 터널의 간격이 매우 좁아서 병렬 터널에 비해 점유 면적이 작으나 경제적이지 못하다. 병렬 터널은 경제적이긴 하지만 2-아치 터널보다 점유 면적이 커서 용지의 매입이 어려운 경우에는 문제가 될 수 있다. 새로운 설계는 이 두 터널을 터널의 간격이 점차 증가하는 제3의 병렬터널로 연결시키는 것이다. 접속터널의 필라는 폭이 매우 좁을 수 있기 때문에 이 새로운 설계를 불량한 암반에 적용하려면 검증이 필요하다. 이에 4등급 및 5등급 암반에 대해 2차원 및 3차원 수치해석을 이용하여 2가지 방법으로 안정성 검토를 수행하였다. 검토 결과, 중앙 필라가 텐션 볼트로 적절히 보강된다면 터널 심도가 직경의 5배 이하인 경우에는 적용이 가능하였다.

수치해석과 현장계측을 통한 병렬터널의 최소 필라폭과 보강에 대한 평가 (Assessment of minimum pillar width and reinforcement of parallel tunnel using numerical analysis and field monitoring)

  • 안용관;공석민;이용주
    • 한국터널지하공간학회 논문집
    • /
    • 제16권3호
    • /
    • pp.299-310
    • /
    • 2014
  • 국가적으로 국토의 효율적 활용과 친환경성 등으로 인해 터널과 같은 지하공간 건설이 필요하다. 친환경적 요소의 중요성을 감안할 때, 산악지에 형성되는 도로건설에 대해 2-아치 및 대단면 터널로 계획되나 경제성, 시공성, 공사기간, 유지관리 등의 문제점을 가지고 있다. 따라서 본 연구에서는 2차로의 국도터널을 기준으로 현장조건과 지반조건을 고려하여 터널별 이격거리와 토피고를 변화시켜 경험식과 수치해석적으로 필라부의 안전성을 평가하였으며, 해석 프로그램으로 유한요소법을 적용한 Plaxis 2D를 활용하여 터널의 최소 필라폭 선정과 전체적인 터널의 거동특성을 분석하였다. 분석결과, Tie-Bolt에 의한 필라보강은 연직하중을 분산시켜 안전적인 근접병렬터널 계획이 가능하며, 터널 필라의 거동은 현장계측 결과와 잘 일치하는 것으로 나타났으며, 지반조건에 따라 터널 필라폭을 축소시킨다면 이전의 터널에 비해 효율적인 터널 활용이 가능하다.

쌍굴터널 굴진에 따른 주변지반의 거동과 간섭효과 (Effect of interference and Ground Movement by Twin Tunnelling)

  • 김학문
    • 터널과지하공간
    • /
    • 제7권2호
    • /
    • pp.136-142
    • /
    • 1997
  • The behaviour of ground movement during the construction of two parallel tunnels in weathered zone and soft rock has been investigated. All the influencing factors for the behaviour of twin tunnel such as tunnel size, ground conditions, tunnel depth, pillar width and initial state of ground stresses were examined The results of FEM nonlinear analysis were compared with some of model test results in weathered zone to verify the numerical method. It was found that minimum interference was obtained in the parallel construction case when the twin tunnel distance (pillar width) is just over the twice of tunnel diameter. Guide line for the interference of twin tunnelling has been introduced for the ground of weathered zone and soft rock.

  • PDF

근접 병설터널에서 필라 압축방법에 따른 필라부 강도특성 변화에 관한 연구 (A Study on the Estimation of the Behaviors by Compression Method of Rock Pillar between Close Parallel Tunnels)

  • 김제경;이송
    • 한국지반공학회논문집
    • /
    • 제29권12호
    • /
    • pp.87-94
    • /
    • 2013
  • 근래 들어 도심지 주변의 교통난 해소를 위한 터널 건설이 증가하고 있으나 기존 노선과의 선형, 주변 구조물과의 간섭, 용지 매입의 제한 및 매입비 증가 등과 같은 제한적인 요인과 터널예정 부지 주변의 민원 및 환경훼손 최소화 등과 같은 환경적인 요인으로 인해 터널 계획시 많은 어려움을 겪고 있다. 이를 해소하고자 터널간의 거리를 좁게하는 근접병설터널의 사례가 증가하고 있으나 이러한 근접병설터널의 경우 터널간 거리를 충분히 확보하고 있는 일반적인 터널에 비해 안정성 측면에서 불리한 점이 많은데, 특히 좁은 필라부의 강도를 증가시키기 위한 다양한 방법을 적용하고 있으나 필라부의 적정한 거동특성을 반영한 필라부 보강공법은 많지 않은 실정이다. 본 논문에서는 필라부의 적정한 거동특성을 반영한 보강공법을 비교, 분석하고 이를 수치해석을 통해 검증하였다.

Evaluation of blasting vibration with center-cut methods for tunnel excavation

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Kim, Nam-Soo
    • Geomechanics and Engineering
    • /
    • 제30권5호
    • /
    • pp.423-435
    • /
    • 2022
  • Ground vibration generated repeatedly in blasting tunnel excavation sites is known to be one of the major hazards induced by blasting operations. Various studies have been conducted to minimize these hazards, both theoretical and empirical methods using electronic detonator, the deck charge method, the center-cut method among others Among these various existing methods for controlling the ground vibration, in this study, we investigated the cut method. In particular, we analyzed and compared the V-cut method, which is commonly used in tunnel blasting, to the double-drilled parallel method, which has recently been introduced in tunnel excavation site. To understand the rock fragmentation efficiency as well as the ground vibration controllability of the two methods, we performed in-situ field blasting tests with both cut methods at a tunnel excavation site. Additionally, numerical analysis by FLAC3D has been executed for a better understanding of fracture propagation pattern and ground vibration generation by each cut method. Ground vibration levels, by PPVs measured in field blasting tests and PPVs estimated in numerical simulations, showed a lower value in the double-drilled parallel compared with the V-cut method, although the exact values are quite different in field measurement and numerical estimation.