• Title/Summary/Keyword: PROMETHEE-AHP기법

Search Result 9, Processing Time 0.029 seconds

A Comparison of MAUT, AHP and PROMETHEE for Multicriteria Decisions (다기준 의사결정기법의 비교 -PROMETHEE의 적용을 중심으로-)

  • 민재형;송영민
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.229-232
    • /
    • 2003
  • This study discusses the strengths and weaknesses of MAUT, AHP, and PROMETHEE as multicriteria decision making aids with respect to their underlying assumptions and axioms, and suggest the usefulness and limitations of PROMETHEE as a outranking method. For the demonstration purpose, we provide a numerical example to evaluate 3 domestic life insurers using PROMETHEE.

  • PDF

Analysis of Schedule Risk using PROMETHEE (PROMETHEE 기법을 활용한 공정리스크 중요도 분석)

  • Lee, Jang-Young;Yoon, Yoo-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.353-357
    • /
    • 2008
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management processes identification, analysis and response. Especially, the analysis process is important to objectively identify importance and priority among risk factors. The purpose of this study is to develop the effective analysis process by studying and supplement the problem of the AHP analysis method. The study provides a analysis process to use the PROMETHEE analysis method proposed.

  • PDF

Analysis of the Schedule Risk using PROMETHEE in Building Construction Management (건설관리에서의 PROMETHEE기반 공정 리스크 분석)

  • Lee, Jang-Young;Yoon, You-Sang;Jang, Myung-Houn;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopts the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to provide process of risk analysis to use the PROMETHEE.

A Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using PROMETHEE-AHP (PROMETHEE-AHP 기법을 이용한 노후 공동주택의 재건축과 리모델링 사업선택요소 선정에 관한 연구)

  • Yoo, Seung-Min;Kwon, Oh-kyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.77-85
    • /
    • 2019
  • Reconstruction and remodeling have been introduced as a part of renewal (redevelopment) projects for old apartments built after the mid-1970's and government policies for revitalizing each project has been changed continually. However, the frequent changes of the policies have caused conflicts among business entities in selecting business methods. The conflicts from their early stages have made serious problems in the entire business process. Therefore, this study deduced factors of business selection by applying comparison analysis between the two business projects on how certain factors have an influence on selecting reconstruction and remodeling business projects. Based on the analysis, four categories and 26 factors were finally selected. After then, the priority of each selection factor was deduced through the AHP method and PROMETHEE method used for analysis of relative importance and impact values regarding to the business selection.

Application of AHP-PROMETHEE to determine areal and linear priorities for sewer rehabilitation projects (하수관로의 면단위 및 선단위 정비 우선순위 결정을 위한 AHP-PROMETHEE기법의 적용)

  • Ahn, Hosung;Yoo, Soonyu;Lee, Taehoon;Park, Kyoohong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.4
    • /
    • pp.289-301
    • /
    • 2020
  • Since sewer rehabilitation program requires long construction period and enormous capital investment, determination of rehabilitation priorities is important with systematic planning considering appropriate evaluation parameters. In this research, we applied PROMETHEE(Preference Ranking Organization METHod for Evaluations) known as very objective and scientific multi-criteria decision-making analysis, using the weights determined by AHP(Analytic Hierarchy Process) for the selected sewer evaluation items to calculate the rehabilitation priorities for each sewer sub-catchment in basin Gusan 1 of Seoul. Preference functions and preference thresholds were estimated for each criterion of ratio of lack of hydraulic capacity of sewers, defect ratio, ratio of sewers with velocity less than its minimum criteria, and density of sewers in the sub-catchment. As a result, it was found that region d had the first priority among four sub-catchments. For each and every sewer located in region d, we could also rank sewers to be rehabilitated urgently.

The Risk Evaluation on Water Supply Networks using PROMETHEE (PROMETHEE를 이용한 상수도관망시스템의 위험도 평가)

  • Hong Sungjun;Kim Sheung-Kown;Kim Jooghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1307-1311
    • /
    • 2005
  • 최근들어 Water Security에 대한 관심이 고조되고 있지만 국내의 경우 이에 대한 체계적인 연구가 아직 진행되지 않았고 상수도관망시스템의 오염예방 및 위험관리에 대한 연구는 매우 미비한 실정이며 특히 상수도관망시스템의 위험성 및 취약성에 대한 연구는 전무한 상태이다. 이러한 상수도관망시스템의 위험도와 관련된 여러 위험요소들은 인명의 피해, 재산상의 피해, 환경적 피해, 시스템의 피해 그리고 사회적 불안등 여러 기준을 고려하여 평가되어야 한다. 이 문제는 다기준의사결정(multi-criteria decision making)문제로서 평가기준들(criteria) 간의 상충관계(trade-off)로 인하여 판단이 모호한 대안들을 PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) 기법을 이용하여 평가하였다. PROMETHEE는 선호의 유출량(leaving flow)과 유입량(entering flow)의 개념을 이용하여 여러 대안들의 순위선호(outranking)를 산정하는 기법으로, 의사결정자(decision matter)가 비교적 쉽게 이해할 수 있으며 기존의 AHP$\cdot$ANP와는 달리 명확한 판단이 어려운 대안들에 대해서는 비교불가능한(incomparable) 대안으로 분류한다. 이와 같은 위험도 평가결과는 위기상황에 대한 대처방안을 제시할 의사결정시스템 구축의 기초 자료가 될 수 있을 것이다.

  • PDF

(A Study on the Evaluation Method of Source Selection in Case of Weapon System Purchase Project) (무기체계 구매사업시 기종결정 평가방법에 관한 연구)

  • Choi, Jin-Seok;Lyu, Kyu-Yeol
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.1
    • /
    • pp.63-82
    • /
    • 2009
  • The purpose of this study is to analyze the problems of current rules and regulations on the source selection for weapon system in defense acquisition project and suggest several techniques to ensure objectivity and fairness. As an application example, Helicopter source selection was presented. It was analyzed and compared through technique application and strength and weakness analysis of AHP, PROMETHEE and Attribute Transformation. The decision making techniques which make all conditions satisfactory in all situations are nonexistent. Thus, it is estimated that we can maintain the objectivity in the source selection of weapon systems by applying suitable decision making techniques in accordance with the patterns of evaluation item.

Determination of Investment Priority for River Improvement Project at Downstream of Dams Using PROMETHEE (PROMETHEE 기법을 이용한 댐 직하류 하천정비사업 투자우선순위 결정)

  • Kim, Gil Ho;Sun, Seung Pyo;Yeo, Kyu Dong;Kim, Hung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1B
    • /
    • pp.41-51
    • /
    • 2012
  • Sometimes, there exist many alternatives for doing a SOC project. However, the limitation of the fund requires the determination of investment priority for the alternatives. This may be performed according to the degree of importance of individual alternatives. Especially, the river improvement project at the downstream of dams has complex and various values and this characteristics make it difficult decision-maker to do reasonable determination. This study aims to determine an investment priority of 33 alternatives in the river improvement project at the downstream of dams using PROMETHEE method which has advantages in determining the priority. In this study, we determined evaluation criteria and attributes by considering the functions and objectives of the river improvement project at the downstream of dams. The eigenvector method in AHP was used to estimate the relative importance of evaluation criterion. Based on the estimation, we determined investment priority of 33 alternatives by PROMETHEE method and the priority of alternatives was derived in the order of Juam regulation dam, Unmun dam, Yongdam dam and so on. The results of this study could provide a reasonable standard to the decision-maker for the determination of investment priority of alternatives.

Priority analysis of dam candidate sites with the strategic environmental assessment including the missing information (결측정보가 있는 전략환경평가를 이용한 댐 후보지 우선순위 분석)

  • Park, Dae-Ryong;Eom, Myeong-Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.437-437
    • /
    • 2018
  • 본 연구는 댐 후보지에 대한 우선순위 분석이 결측 정보에 따라 다기준 의사결정 방법 및 결측정보 접근방법에 따라 어떻게 달라지는지를 조사하였다. 전략환경평가(Strategic Environmental Assessment, SEA)는 한국의 댐 건설 장기 계획에서 환경 및 생태학적 영향을 기반으로 한 지속가능한 댐 후보지 선정에 적용되고 있다. 그러나 특정 정보가 결측된 경우 SEA는 댐 후보지를 선정하는 데 어려움이 있다. 본 연구에서는 다기준 의사결정 방법으로 AHP, ELECTRE III, PROMETHEE II, Compromise Programming을 적용하였고, 결측 정보 보완을 위해 이항분포와 균등분포형을 사용하였다. 본 연구에서는 전국의 댐 선정 후보지에 적용하여 다중 기준 의사 결정기법과 정보 생성 방법에 의존하여 결과를 비교하였다. 그 결과, 이항분포형을 적용한 결과가 균등분포형을 적용한 결과보다 보다 명백한 우선순위를 보여 주었다. 또한, 다기준 의사결정방법에 따라서는 댐선정 후보지 결과가 달라지지 않는 것으로 나타났다. 따라서, 다기준 의사결정방법 적용시, 결측 정보를 생성하기 위해 이항분포를 사용하면 균등분포 적용시보다 우선순위를 제공하는데 더 효과적이라고 판단된다.

  • PDF