PPI (PRIVATE PARTICIPATION IN INFRASTRUCTURE) STATUS OF SOC (SOCIAL OVERHEAD CAPITALS) AND ITS IMPROVEMENT IN KOREA

  • Sugk-Yong Yoon ;Sung-Won Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.353-359
    • /
    • 2005
  • The infrastructure in korea has been improved drastically since July 7th, 1970 which was the first highway completed date in Korea (Seoul-Pusan). This is one of the major factors for the competitiveness of a country. Now the total length of highway in Korea is more than 2000km. However Korea is 11th in the trade volume in the world, the SOC level of Korea is around 20th at most in the world (IMD 2004). The infrastructure in Korea comparing other developed countries is far below, which gives the impact of cost of goods, even twice expensive in transporting goods through highways, railways and ports etc. Now the government budget is gradually spending more for welfare and health care side. The most of additional expense of welfare is increasing rather than SOC budget is decreasing or staying as it is as 2003. The government may think that the level of SOC is enough in point of view of preference input of budget such as welfare and health care etc. However the SOC level in Korea is far form the competitiveness of the country. The main points of this paper is to show that where Korea is in point of SOC level to go for developed country, and what to do to facilitate BOT, BTO and BTL projects. Korean government has tried to improve the practice of PPI (Private Participation of Infrastructure) with the Act on Private Capital Inducement in 1994 and the Act on Private Investment in 1997.

  • PDF

Development of the Promoter Selection Procedural Model for Private Participation in Infrastructure Projects (민간투자 사업시행자 선정 절차 모델 개발)

  • Han Hyun-Jong;Choi Eung-Kyoo;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.55-62
    • /
    • 2004
  • The purpose of this study is to suggest a systematic procedural model for selecting competent project promoter. The proposed model was made by comparing domestic regulations and procedures with foreign nations', and through interviews with experts and literatures survey. The summaries of this paper are as follows. The current promoter selection procedure was evaluated by reviewing relevant papers, regulations and existing model. Some obstructions which hinder PPI project activation were identified, those are inadequacy of promoter qualification and negotiation process, lack of communication between parties, etc. Some alternatives which remove major obstructions are embodied in the model. The suggested model is comprised of PQ(prequalification), two phased evaluation for the technical proposals which include alternate, communication meeting, etc. To manage the overall procedure well, an involvement of professional "project promoter selection team" would be highly recommended. They will participate in each evaluation stage with full activities, and provide government with some technical materials for selecting promoter as coordinator.

A Study on Diversification of Financing Method for BTL Private Participation in Infrastructure by Introduction of ABS (자산유동화증권 도입을 통한 BTL 민간투자사업에서의 재원 조달 다양화 방안 연구)

  • Park, Young-Min;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.378-383
    • /
    • 2006
  • This study presents the results from an investigation into ABS to revitalize small and medium construction enterprises, and to analyze merits and demerits of ABS introduction using sensitivity analysis some realistic cases. According to some available procedures, this study suggests ABS introduction structure of new education facilities construction in BTL projects of two different types. In order to analyze the effectiveness of introduction, a model was built as new education facilities construction in this paper. In addition, this study tried to put a figure on finance interest changes by analyzing changes for earning rates and money that payed by the government. Moreover, this study also presents merits and demerits of ABS introduction.