Development of the Promoter Selection Procedural Model for Private Participation in Infrastructure Projects  

Han Hyun-Jong (SK건설 건축사업1팀)
Choi Eung-Kyoo (인천대 건축공학과)
Lee Chan-Sik (인천대 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.5, no.3, 2004 , pp. 55-62 More about this Journal
Abstract
The purpose of this study is to suggest a systematic procedural model for selecting competent project promoter. The proposed model was made by comparing domestic regulations and procedures with foreign nations', and through interviews with experts and literatures survey. The summaries of this paper are as follows. The current promoter selection procedure was evaluated by reviewing relevant papers, regulations and existing model. Some obstructions which hinder PPI project activation were identified, those are inadequacy of promoter qualification and negotiation process, lack of communication between parties, etc. Some alternatives which remove major obstructions are embodied in the model. The suggested model is comprised of PQ(prequalification), two phased evaluation for the technical proposals which include alternate, communication meeting, etc. To manage the overall procedure well, an involvement of professional "project promoter selection team" would be highly recommended. They will participate in each evaluation stage with full activities, and provide government with some technical materials for selecting promoter as coordinator.
Keywords
PPI(Private Participation in Infrastructure) projects; project promoter selection; procedural model;
Citations & Related Records
연도 인용수 순위
  • Reference
1 옥동석. 이상호. 김현아, 민간투자법 이후의 민자유치 개선과제, 한국건설산업연구원, 2000
2 X. Q. Zhang, M. M. Kumaraswamy, W. Zheng, E. Palaneeswaran, 'Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong', Journal of Construction Engineering and Management, 2002
3 X. Q. Zhang, 'Concessionaire Selection for Build-Operate- Transfer Tunnel Projects in Hong Kong', Journal of Construction Engineering and Management, pp.155-163, 2002
4 Shou Qing Wang. et al, 'Evaluation and Competitive Tendering of BOT Power Plant Project in China', Journal of Construction Engineering and Management, 1998
5 L. Y. Shen, H. Li and Q. M. Li, 'Alternative Concession Model for Build Operate Transfer Contract Projects', Journal of Construction Engineering and Management, 2002
6 Robert L. K. Tiong, 'Evaluation of proposals for BOT Projects', International Journal of Project Management, 1997
7 기획예산처, 2000-2003년도 민간투자사업기본계획
8 송병록, 민자유치제도 개선에 따른 세부추진절차 수립 연구, 국토연구원, 1999
9 이찬식. 한현종, 민간투자 사업시행자 선정방식에 관한 연구 : PQ 및 제안서 평가를 중심으로, 대한건축학회 학술발표대회논문, 2003. 4
10 김흥수, 민간투자 사업자 선정방식의 개선방안, 한국건설 산업연구원 건설산업동향, 2001. 10
11 대한상공회의소 보도자료, SOC 민간투자사업 참여업체 만족도 조사, 2003. 6
12 옥동석. 하헌구, SOC 부문에 대한 민간투자제도의 개선과제, 교통개발연구원 교통정책연구 제8권 1호, p.32, 2000
13 M. M. Kumaraswamy and David A. Morris, 'Build-Operate-Transfer-Type Procurement in Asian Megaprojects', Journal of Construction Engineering and Management, 2002
14 이규방. 윤하중. 김도일. 우지원. 이원석. 권용훈, 민간 투자사업의 성능제안형 방식 도입에 관한 연구, 국토연구원, 2002