A Study on Diversification of Financing Method for BTL Private Participation in Infrastructure by Introduction of ABS (자산유동화증권 도입을 통한 BTL 민간투자사업에서의 재원 조달 다양화 방안 연구)

  • Park, Young-Min;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.378-383
    • /
    • 2006
  • This study presents the results from an investigation into ABS to revitalize small and medium construction enterprises, and to analyze merits and demerits of ABS introduction using sensitivity analysis some realistic cases. According to some available procedures, this study suggests ABS introduction structure of new education facilities construction in BTL projects of two different types. In order to analyze the effectiveness of introduction, a model was built as new education facilities construction in this paper. In addition, this study tried to put a figure on finance interest changes by analyzing changes for earning rates and money that payed by the government. Moreover, this study also presents merits and demerits of ABS introduction.

  • PDF

Development of the Promoter Selection Procedural Model for Private Participation in Infrastructure Projects (민간투자 사업시행자 선정 절차 모델 개발)

  • Han Hyun-Jong;Choi Eung-Kyoo;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.55-62
    • /
    • 2004
  • The purpose of this study is to suggest a systematic procedural model for selecting competent project promoter. The proposed model was made by comparing domestic regulations and procedures with foreign nations', and through interviews with experts and literatures survey. The summaries of this paper are as follows. The current promoter selection procedure was evaluated by reviewing relevant papers, regulations and existing model. Some obstructions which hinder PPI project activation were identified, those are inadequacy of promoter qualification and negotiation process, lack of communication between parties, etc. Some alternatives which remove major obstructions are embodied in the model. The suggested model is comprised of PQ(prequalification), two phased evaluation for the technical proposals which include alternate, communication meeting, etc. To manage the overall procedure well, an involvement of professional "project promoter selection team" would be highly recommended. They will participate in each evaluation stage with full activities, and provide government with some technical materials for selecting promoter as coordinator.

Identification and Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL민간투자사업의 리스크 식별 및 영향도 분석에 관한 연구)

  • Jung, Jung-Man;Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.47-56
    • /
    • 2007
  • The Build-Transfer-Lease(BTL) system is a new way of attracting private capital to social infrastructure construction projects. Private companies will get back their investment by leasing facilities to the government. In January 2005, government introduces a 'Korean New Deal Policy' to initiate BTL system in the field of social infrastructure development such as education, public welfare, housing, culture etc. As BTL being still in premature phase, thus it is lack of knowledge in BTL and there is no such studies about problems and impacts of BTL projects. However, there could be so many problems underlying within BTL projects. Therefore, the purpose of this paper is to identify various risk factors during implementation of BTL projects. For this purpose, five BTL undertaking projects were studied. Field survey was conducted based-on interview instruments. Prevailing risk factors in operating the BTL Project were collected from the both officials of project promoters and concessionaires. In addition, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. Moreover, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. From analyzing the data, the study addresses that both major BTL project participants 'the competent authority' and 'Special purpose company(SPC)' have many problems and difficulties to operate the projects.