가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용 (Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • 제34권6호
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

FMS운용을 위한 일정계획용 소프트웨어 (Development of Scheduling Software for Flexible Manufacturing System)

  • 윤덕균;황의철
    • 산업경영시스템학회지
    • /
    • 제14권24호
    • /
    • pp.53-69
    • /
    • 1991
  • This paper is concerned with software developments for scheduling and sequencing of FMS. The scheduling algorithms are developed for 3 types of FMS:single machine type FMS, flowshop type FMS. assembly line type FMS. For the single machine type FMS. full enumeration algorithm is used. For the flowshop type FMS heuristic algorithms are developed. For the assembly type FMS the exsisting PERT/CPM algorithm is applied. Numerical examples are presented for illustration of each algorithm. Each soft ware program list are attached as appendices.

  • PDF

산업용 로봇트 주변장치의 분산제어에 관한 연구 (Study on a Distrbuted control system for industrial robot peripherals)

  • 김대훈;변증남
    • 대한전자공학회논문지
    • /
    • 제17권6호
    • /
    • pp.1-8
    • /
    • 1980
  • 교시형 산업용 로붓트의 주변장치들을 산업용 로봇트의 작업동작에 맞춰 제어하기 위한 분산제어 시스템의 설계에 대하여 연구하였다. 설계 제작된 분산제어 시스템은 16 bit machine의 미니콤퓨터와 수대의 8bit machine 인 마이크로콤퓨터를 결합시켜 구성하였다. 본 논문에서는 분산제어 시스템의 구조, 시스템운전에 필요한 소프트웨어의 구설 및 분산된 제어모듈간의 통신망에 대하여 약술하였으며 결합회로(Interface)등을 포함한 실제적인 문제점을 토의하였다.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

인공지반을 적용한 사교하는 사면에서의 터널 갱구부 설계 (The design of outlet in inter-cross slope with tunnel which it applied forming artificial ground)

  • 박철숙;곽한;이규탁;김봉재;윤용진;김희광
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1532-1548
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.

  • PDF

비정질-결정질 가역적 상변환 소자용 Ge8Sb2Te11 박막의 W 도핑에 따른 상변환 특성 평가 (Evaluation on the Phase-Change Properties in W-doped Ge8Sb2Te11 Thin Films for Amorphous-to-Crystalline Reversible Phase-Change Device)

  • 박철진;여종빈;공헌;이현용
    • 한국전기전자재료학회논문지
    • /
    • 제30권3호
    • /
    • pp.133-138
    • /
    • 2017
  • We evaluated the structural, electrical and optical properties of tungsten (W)-doped $Ge_8Sb_2Te_{11}$ thin films. In a previous work, GeSbTe alloys were doped with different materials in an attempt to improve thermal stability. 200 mm thick $Ge_8Sb_2Te_{11}$ and W-doped $Ge_8Sb_2Te_{11}$ films were deposited on p-type Si (100) and glass substrates using a magnetron co-sputtering system at room temperature. The fabricated films were annealed in a furnace in the $0{\sim}400^{\circ}C$ temperature range. The structural properties were analyzed using X-ray diffraction (X'pert PRO, Phillips). The results showed increased crystallization temperature ($T_c$) leading to thermal stability in the amorphous state. The optical properties were analyzed using an UV-Vis-IR spectrophotometer (Shimadzu, U-3501, range : 300~3,000 nm). The results showed an increase in the crystalline material optical energy band gap ($E_{op}$) and an increase in the $E_{op}$ difference (${\Delta}E_{op}$). This is a good effect to reduce memory device noise. The electrical properties were analyzed using a 4-point probe (CNT-series). This showed increased sheet resistance ($R_s$), which reduces programming current in the memory device.