• 제목/요약/키워드: PERT/CPM

검색결과 55건 처리시간 0.034초

프로세스 분석을 위한 IDEF3 모델을 CPM Network 모델로 변환하기 위한 절차 (Procedures of Transform IDEF3 Model into CPM Precedence Network Model for Process Analysis)

  • 강동진;김경표;이상용;정용식
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1999년도 춘계학술대회 발표논문집
    • /
    • pp.135-144
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload in a period of process. As a general rule, leveling the peak of workload in a certain period is difficult because concurrent processing is comprised of various processes, including overlapping, paralleling and looping. Therefore, workload management with resource constraints is so beneficial that effective methods to analyze design process This study presents a procedure to transform the IDEF3 process model into the precedence logic network model for more useful assessment of the process. This approach is expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF

위험도기반 해양사고 초기대응 지원 시스템 개발 기초연구: 유조선 좌초사고를 중심으로 (Fundamental Research on the Development of a Risk Based Decision Support System for Maritime Accident Response: Focused on Oil Tanker Grounding)

  • 나성;이승현;최혁진
    • 한국항해항만학회지
    • /
    • 제40권6호
    • /
    • pp.391-400
    • /
    • 2016
  • 최근 우리나라 연근해에서 발생한 몇 건의 대형 해양사고에서, 신속하고 체계적인 초기대응이 사고 전개양상과 사고결과에 얼마나 큰 영향을 미치는지를 확인하였다. 또한, 이를 통해 다양한 해양사고 상황에 대한 정확한 정보와 전개될 수 있는 시나리오, 적용 가능한 사고대응 방법들에 대한 정보를 신속하게 확보하는 것이 해양사고 초기대응을 위하여 무엇보다 중요함을 알 수 있었다. 이러한 현실적인 문제를 해결하기 위한 일환으로, 본 연구에서는, '위험도기반 초기대응 지원 시스템'의 개념을 제시하고, 해양사고 이후 전개 가능한 모든 시나리오와 적용 가능한 사고대응 방법들을 식별하기 위하여 사건전개 시나리오 식별 브레인스토밍 기법을 제안하였으며, 식별된 사고대응 방법들의 적용으로 인한 피해저감 효과 등을 정량화하기 위하여 사건수목분석 (Event Tree Analysis: ETA) 기법을 활용한 사건전개수목을 제안하였다. 그리고 각각의 사고대응 방법에 대한 상세분석을 위해서는 PERT/CPM의 사용을 제안하였다. 또한, 상기 제시한 위험도기반 초기대응 지원시스템의 구성 체계를 설명하기 위하여, 유조선 좌초사고에 대한 사고대응 작업을 예로 간략한 위험도분석 작업을 수행하였다.

NEW INTELLIGENT APPROACH FOR PROJECT MANAGEMENT IN CONSTRUCTION INDUSTRY

  • D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.366-370
    • /
    • 2005
  • The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.

  • PDF

TOC(Theory of Constraints)를 기반으로 한 최적생산시스템 연구 (A Study on the Development TOC(Theory of Constraints) based Manufacturing system)

  • 류인화;윤희성;김창은
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.538-541
    • /
    • 2000
  • Goldratt박사에 의해 제창된 TOC(Theory of Constraints)는 제약조건을 찾아 개선시켜 없애고 시스템 심과를 높일 수 있는 방안을 찾는 제약이론이다. 생산공정을 포함한 모든 분야에서 제약이란 없을 수가 없다. 따라서 기존의 MRP나 PERT/CPM과 같은 무한 자원 스케줄링으로는 예상하지 못한 문제가 도출될 수 밖에 없는 한계를 제약공정의 자원능력이 유한하다는 가정에서 출발하는 제약이론으로 자원활용의 최적화를 도모할 수 있다. 본 논문에서는 TOC와 많은 유사점을 가지고 있는 생산시스템인 JIT와 비교하여 아직 국내에는 활발한 연구가 이루어지고 있지 않은 TOC를 기반으로 최적 생산시스템을 연구하고자 한다.

  • PDF

FMS운용을 위한 일정계획용 소프트웨어 (Development of Scheduling Software for Flexible Manufacturing System)

  • 윤덕균;황의철
    • 산업경영시스템학회지
    • /
    • 제14권24호
    • /
    • pp.53-69
    • /
    • 1991
  • This paper is concerned with software developments for scheduling and sequencing of FMS. The scheduling algorithms are developed for 3 types of FMS:single machine type FMS, flowshop type FMS. assembly line type FMS. For the single machine type FMS. full enumeration algorithm is used. For the flowshop type FMS heuristic algorithms are developed. For the assembly type FMS the exsisting PERT/CPM algorithm is applied. Numerical examples are presented for illustration of each algorithm. Each soft ware program list are attached as appendices.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

베이지안넷 기반의 프로젝트 일정리스크 평가 (Project Schedule Risk Assessment Based on Bayesian Nets)

  • 성홍석;박철순
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

경수로계통설계 표준 Logic Network의 개발 (Development of standard logic network for PWR NSSS System design)

  • 박준원;이병령;이판권;이해준;송태길;김동희;최현호
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1993년도 추계학술대회발표논문집; 서강대학교, 서울; 25 Sep. 1993
    • /
    • pp.212-226
    • /
    • 1993
  • The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3&4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project.

  • PDF

프로젝트 스케쥴링을 위한 데이터베이스시스템의 설계 및 구현

  • 한재민;황인수
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1995년도 춘계공동학술대회논문집; 전남대학교; 28-29 Apr. 1995
    • /
    • pp.760-771
    • /
    • 1995
  • 생산시스템에서의 스케쥴링에 관한 연구는 단일기계작업 스케쥴링으로부터 유연생산시스템(FMS)에 이르기까지 매우 광범위하게 이루어져 왔으며, 정수계획법, 동적계획법, Branch and Bound, PERT/CPM, 그리고 기타의 휴리스틱 기법등 많은 연구결과를 찾아볼수 있다. 그러나, 대부분의 연구는 소규모의 문제를 대상으로 이루어진 것으로 대규모의 현실세계 문제를 풀기에는 부적절한 것으로 판명되었다. 또한, 적용이 가능한 휴리스틱(Heuristic) 기법들도 현실세계와는 맞지 않는 많은 가정하에서 주어진 목적함수를 극대화하도록 개발되었기 때문에 현실적인 문제를 풀기 위해서는 각종 가정을 완화시킴으로써 휴리스틱을 현실에 적용하기 위한 또 다른 연구가 필요하게 되었다. 따라서, 이 연구에서는 새로운 휴리스틱을 개발하기보다는 기존의 휴리스틱 기법을 그대로 이용하면서 현실세계의 문제에서 발생하는 동적(dynamic) 스케쥴링과 재스케쥴링(rescheduling) 문제를 해결하는 시스템을 설계, 구현하는데 초점을 맞추고 있다. 특히, 데이터베이스 접근법을 사용함으로써, 가용자원의 수가 증감하거나 새로운 작업이 추가되는 등 기존의 가정을 상당부분 완화시킨 동적스케듈링 환경하에서도 재스케쥴링이 가능한 동적 재스케쥴링(dynamic rescheduling)시스템을 설계, 구현하였으며, 이의 세부기능을 보완하는 작업이 계속되고 있다.

  • PDF