Seismic Performance Evaluation of Dry Precast Concrete Beam-Column Connections With Intermediate Moment Frame Details (중간모멘트골조 상세를 갖는 건식 프리캐스트 콘크리트 보-기둥 접합부의 내진성능평가)

  • Kim, Seon Hoon;Cho, Jong;Oh, Hyo Keun;Choi, Seok Dong;Yeo, Un Yong;Lee, Deuck Hang
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.3
    • /
    • pp.129-137
    • /
    • 2023
  • This study presents a dry precast concrete (PC) beam-column connection, and its target seismic performance level is set to be emulative to the reinforced concrete (RC) intermediate moment resisting frame system specified in ACI 318 and ASCE 7. The key features include self-sustaining ability during construction with the dry mechanical splicing method, enabling emulative connection performances and better constructability. Test specimens with code-compliant seismic details were fabricated and tested under reversed cyclic loading, which included a PC beam-column connection specimen with dry connections and an RC control specimen. The test results showed that all the specimens failed in a similar failure mode due to plastic deformations in beam members, while the hysteretic response curve of the PC specimen showed comparable and emulative performances compared to the RC specimen. Seismic performance evaluation was quantitatively addressed, and on this basis, it confirmed that the presented system can fully satisfy all the required performance for the intermediate RC moment resisting frame.

An Experimental Study on The Bolted Connection Between H-Beam and Precast-Concrete Column (PC 기둥-H형강보의 볼트접합부에 관한 실험적 연구)

  • 조은영;박순규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.181-185
    • /
    • 2003
  • The composite structural system with reinforced concrete column and steel beam has some advantages in the structural efficiency by complementing the shortcomings between the two systems. The system, however, has also a lot of problems in earthquake-proof capacity and construction process because it is wet method of construction. So, this paper proposed PCS(Precast Concrete Column and Steel Beam) structural system with dry method of construction. Purpose of this study is to enhance merit and control failure mechanism by installing Dog-Bone on H-beam.

  • PDF

PC-BEAM 전도방지대책

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.25
    • /
    • pp.102-106
    • /
    • 1997
  • 건교부는 P.C 빔 전도사고 근절대책을 마련, 각 발주기관에 통보하여 건설현장에서 이를 철저히 준수토록 했다. 또한 앞으로는 정기점검 및 각종 점검시에 PC 빔 전도사고 근절대책의 이행여부를 함께 점검할 예정이라고 덧붙였다.

  • PDF

Development of PC-based FEA system (Microcomputer용 유한요소 해석시스템의 개발)

  • 심정수;김창헌;이종원
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1987.10b
    • /
    • pp.260-263
    • /
    • 1987
  • In this study, PC-based FEA system (Micro-STANS) running on the 16 bit microcomputer is developed. This system has powerful pre & post processing function using computer graphics, and is interfaced to AutoCAD system which is most popular PC-CAD system, making it possible to accomplish the concept of real integration between design and analysis. This system which has truss , beam plate & shell elements in the element library, can perform linear static analysis.

  • PDF

Full Scale Model Test on Channel Type PC Bridge (찬넬형 PC교의 실물실험 연구)

  • 구민세;황윤국;조현준;유영찬;김정호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1990.10a
    • /
    • pp.89-94
    • /
    • 1990
  • This study was performed to verify the behavior of channel type PC bridge through the full scale model test. It is well known that the behavior of connection is especially important in case of precast multi-beam bridges. In this study, the lateral load distribution capacity was found satisfactory and influenced little either by the type or strength of connections. Analysis results agreed well with test results. Parameter studies were performed based on the test and analysis results.

  • PDF

Development of a Stereotactic Radiosurgery Planning System (뇌정위 방사선수술을 위한 컴퓨터 치료계획시스템의 개발)

  • 조병철;오도훈;배훈식
    • Progress in Medical Physics
    • /
    • v.8 no.1
    • /
    • pp.17-24
    • /
    • 1997
  • We developed PC-based planning system for linear accelerator based stereotactic radiosurgery. The system was developed under Windows 95 on Pentium Pro$\^$(R) 200 ㎒ IBM PC with 128 MB RAM. It was programed using IDL$\^$(R)/ of Research Systems, Inc. as a programing tool. CT image data obtained with BRW stereotactic frame is transferred to PC through magnetoptical disk. As loading the image, the system automatically recognizes the location of rods and establishes stereotactic coordinates. It accurately calculates and corrects the coordinates, degree of tilting, and magnification rate of axial images. After the coordinates is defined we can delineate and edit the contours of target and organs of interest on axial images. Upon delineating contours of target, isocenter is determined automatically and we can set up the beam configuration for radiosurgery. The system provides beam's eye view and room's eye view for efficient confuguring of beams. The system calculates dose distribution 3-dimensionally. It takes 1 to 2 minutes to calculate dose distribution for 5 arcs. We can verify the dose distribution on serial axial images. We can analyze the dose distribution quantitatively by evaluation of dose-volume histogram of target and organ of interest. This system, PC-based radiosurgery planning system, includes the basic features for radiosurgery planning and calculates dose distribution within reasonable time for clinical application.

  • PDF

A basic study of steel-joint connection method of composite precast concrete members (합성 PC부재의 Steel-joint Connection Method 개발 기초연구)

  • Kim, Geun-Ho;Lee, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.10-11
    • /
    • 2013
  • Green Frame is a column-beam system formed by composite precast concrete column and beam connected with steel buried in both members. During the installation of Green columns, the columns of Green Frame, covering 3 floors per each piece and beams, the eccentricity can be observed due to the construction error and the weight of beam itself. Such eccentricity may have a little influence on a single frame, yet, it can develop critical issues to the installation of subsequent beams or beams on the upper floors in the context of a building as a whole that has multiple frames. These issues lead to delay in frame installation, decrease of productivity and increase of cost, etc. Therefore, this study presents a steel-joint connection method in order to solve the issues. The steel-joint connection method exists on slope plane and reinforcing plate in steel frame buried in composite PC members. Through this method, the issues can be resolved without requiring additional equipment or manpower.

  • PDF

Basic study for time analysis of insitu production of composite precast concrete members using linear scheduling method (LSM을 사용한 합성 PC 부재의 현장생산 공기 산정 기초연구)

  • Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.92-93
    • /
    • 2014
  • Green Frame is a method for Rahmen structure construction composed of composite PC members. The composite PC members of Green Frame which are based on in-situ production can reduce the construction cost and are more likely to secure quality when compared to production in factories. Previous studies developed forms for in-situ production of Green Frame composite PC members and proposed algorithms to arrange them on site. However, it requires not only their arrangement, but also calculation of an accurate production period to produce the required PC members in a limited space and supply them in a timely manner. In particular, it is necessary to clearly define the properties of detailed processes for in-situ production of PC members and to calculate the time required for respective process. To do so, this study is a basic research on calculating the time for in-situ production using a linear scheduling method.

  • PDF

An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members (합성 PC 부재의 현장생산 및 설치 공정계획의 영향요소 분석)

  • Lim, Chaeyeon;Kim, Sun Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.176-177
    • /
    • 2013
  • The composite PC rahmen structure, called Green Frame, allows the main structural members such as PC column and beam to be produced on the site, resulting in a reduction of PC member transportation cost and the margin of PC plant (operation cost and profit), making it more economic than the bearing wall structure. To apply the Green Frame to practice, not only installation but also insitu-production process should be considered. Therefore, this study analyse the influence factors on insitu-production and installation schedule of composite precast concrete members. The results shall be used as basic criteria on the planning of insitu-production and installation of Green Frame.

  • PDF

Analysis on the Flexural Behavior of Existing Reinforced Concrete Frame Structures Infilled with L-Type Precast Wall Panel (L형 프리캐스트 콘크리트 벽패널로 채운 기존 철근 콘크리트 골조 구조물의 휨 거동 분석)

  • Yu, Sung-Yong;Ju, Ho-Seong;Son, Guk-Won
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.2
    • /
    • pp.52-62
    • /
    • 2015
  • This study aims at developing a new seismic resistant method by using precast concrete wall panels for existing low-rise, reinforced concrete beam-column buildings such as school buildings. Three quasi-static hysteresis loading tests were performed on one unreinforced beam-column specimen and two reinforced specimens with U-type precast wall panels. Top shear connection of the PC panel was required to show the composite strength of RC column and PC wall panel. However, the strength of the connection did not influence directly on the ultimate loading capacities of the specimens in the positive loading because the loaded RC column push the side of PC wall panel and it moved horizontally before the shear connector receive the concentrated shear force in the positive loading process. Under the positive loading sequence(push loading), the reinforced concrete column and PC panel showed flexural strength which is larger than 97% of the composite section because of the rigid binding at the top of precast panel. Similar load-deformation relationship and ultimated horizontal load capacities were shown in the test of PR1-LA and PR1-LP specimens because they have same section dimension and detail at the flexural critical section. An average of 4.7 times increase in the positive maximum loading(average 967kN) and 2.7 times increase in the negative maximum loading(average 592.5kN) had resulted from the test of seismic resistant specimens with anchored and welded steel plate connections than that of unreinforced beam-column specimen. The maximum drift ratios were also shown between 1.0% and 1.4%.