• Title/Summary/Keyword: PC 부재 할당 계획

Search Result 1, Processing Time 0.017 seconds

Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning (IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석)

  • Jang, JunYoung;Cho, Kyeong Woon;Koo, Choongwan;Lee, Chansik;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.53-62
    • /
    • 2021
  • PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.