• Title/Summary/Keyword: P.S.T 공법

Search Result 22, Processing Time 0.034 seconds

An Experimental Study on Flexural Behavior in Framed Structure of P.S.T Method (P.S.T 공법 라멘 구조물의 휨 거동 특성에 관한 실험적 연구)

  • Cui, Jie;Yoon, Jong Nam;Eum, Ki Young;Hong, Sung Nam;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.144-152
    • /
    • 2011
  • The existing underground trenchless methods use reinforcing rod in steel tube to obtain structural stiffness. However, there are some problems such as inconvenience of work and expensive material fee which are resulted from limited working space and reinforcing work. To resolve these problems, a new trenchless method, namely P.S.T method (Prestressed Segment Tunnel Method), is developed which uses joint to connect the steel segment and form erection structure in underground construction. Further, installing strands for prestressing. In order to evaluate the flexural capacity of the P.S.T method structure, experiment was conducted. The parameters considered in the experiment are the span-to-depth ratio, diameter of steel tube at corner, prestressing force and welding of joint. Altogether examining the flexural behavior, the effect of deflection in structure according to different parameters has also been analysised.

A Case Study on the Top-Down Methods Performed in the Excavation Works of Domestic Downtown (국내 도심지 굴착공사에 적용된 Top-Down 공법의 시공사례 연구)

  • Chung, Jeeseung;Park, Sukk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.2
    • /
    • pp.5-19
    • /
    • 2017
  • Underground excavation for building construction in Korea is changing from conventional support method (Strut, Ground anchor) to inside permanent support method by stability, economic, circumstances around excavation and etc. This study was selected the sites of Top-down, New Top-down, S.P.S, S.T.D and B.R.D in general use. This study was compared and analyzed a construction cost and period between aforementioned methods and conventional support method. Also, this study was confirmed the stability of temporary retaining wall by analysis for measurement data under construction. As a result, this study can grasp that most improved permanent support method is excellent in economic and constructability than conventional support method in case of deep excavation and rapid appearance of bedrock.

Numerical study for Application of H-Pile Connection Plastic Sheet Pile Retaining Wall (HCS) (H-Pile과 Plastic Sheet Pile을 결합한 토류벽체에 대한 수치해석적 연구)

  • Lee, Kyou-Nam;Lim, Hee-Dae
    • The Journal of Engineering Geology
    • /
    • v.27 no.3
    • /
    • pp.331-343
    • /
    • 2017
  • In this study to improve stability, workability and economics of the H-Pile+Earth plate or H-Pile+Earth plate+Cutoff grouting currently in use, we had developed HCS method belonging to the retaining wall which is consisting of a combination H-Pile, Plastic Sheet Pile and Steel Square Pipe for gap maintenance and reinforcement of flexible plastic Sheet Pile, and the behavior of each member composing HCS method is investigated by three-dimensional finite element analysis. To numerically analyze the behavior of the HCS method, we have performed extensive three-dimentional finite element analysis for three kinds of plastic Sheet Pile size, two kinds of H-Pile size and three kinds of H-Pile installation interval, one kinds of Steel Square Pipe and three kinds of Steel Square Pipe installation interval. After analyzing the numerical results, we found that the combinations of $P.S.P-460{\times}131.5{\times}7t$ (PS7) and H-Pile $250{\times}250{\times}9{\times}14$ (H250), $P.S.P473{\times}133.5{\times}9t$ (PS9) and H-Pile $300{\times}200{\times}9{\times}14$ (H300) is the most economical because these combinations are considered to have a stress ratio (=applied stress/allowable stress) close to that as the stiffness of H-Pile, plastic Sheet Pile and Steel Square Pipe composite increased, the horizontal displacement of the retaining wall and the vertical displacement of the upper ground decreased. Especially, due to the arching effects caused by the difference in stiffness between H-Pile and plastic Sheet Pile, a large part of the earth pressure acting on plastic Sheet Pile caused a stress transfer to H-Pile, and the stress and displacement of plastic Sheet Pile were small. Through this study, we can confirm the behavior of each member constituting the HCS method, and based on the confirmed results of this study, it can be used to apply HCS method in reasonable, stable and economical way in the future.

Removal of Contaminants Using Natural Purification Method by Sheet Flow (박층류 자연정화공법을 이용한 오염물질의 제거)

  • Kim, Myounghwan;Lee, Du Han;Kim, Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.451-451
    • /
    • 2018
  • 박층류 자연정화공법은 수로의 폭을 넓히고 수심을 낮추어 박층류를 조성하고, 이를 이용하여 하천을 정화하는 공법이다. 박층류가 조성되면 낮은 수심에서 상대적으로 느린 유속 조건이 형성되며 이 때 박층부에 침전된 오염물질은 자갈층 표면에 형성된 생물막에 의해 산화 분해되어 제거된다. 박층류에 의한 오염물질 제거는 생물막의 형성, 생물 산화를 위한 용존산소량 등이 중요한 인자로 작용하며, 박층부를 조성하기 위해서는 수심 10 cm, 유속 30~50 cm/s 의 조건이 적절하다. 본 연구에서는 박층류에 의한 자연정화 성능을 평가하기 위하여 용인시 오산천 일부 구간 고수부지에 사석자갈을 이용한 박층류 자연정화공법이 적용된 차집수로를 설치하고, 오산천으로 유입되는 농수로의 물을 공급하여 오염물질의 농도 변화를 측정하였다. 측정된 항목은 T-N, T-P, COD, DO 등이며, 측정 결과 박층류 자연정화 수로를 유출부에서의 오염물질의 농도가 유입부에서보다 저감되는 것을 확인 할 수 있었다.

  • PDF

The Application of the Sewage, Sanitary Sewage and Wastewater Processing by Soil Purification Theory (토양정화법을 이용한 하.오수 및 폐수 처리의 현장적용성에 관한 연구)

  • Chun, Byungsik;Yoo, Junhee;Kim, Jungyong;Kumar, S;Shin, Sanguok;Shin, Bangwoong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.4
    • /
    • pp.77-84
    • /
    • 2008
  • Soil purification theory is the method using the soil micro-organism like aerobic and anaerobic for treatment of wastewater. The soil has many kinds of micro-organism and it multiply as change of the environment. Unlikely other methods, the soil purification theory is adaptable to inflow water change; moreover, it can process the T-N, T-P without any special method and management. The top is covered with the improved soil which can remove the bad smell and is used for resting place according to planting the lawn. This study is focused on analysis of the treatment processing of wastewater comparing inflow with outflow water. As a results, removal rate of the processing the BOD, COD and SS is almost 90~100% and it is 60~80% in T-N, T-P.

  • PDF

A Study on the Construction Process Management of the Top-Down Construction Method (Top-Down 공사의 공정관리 방법 연구)

  • Kang Hyun-Jung;Rhim Hong-Chul;Lee Ghang;Yun Dae-Jung;Kim Sang-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF

On the Counter Plan of Foundation Method being based on N-Value in the Soft-Ground (연약지반에 있어 N치에 의한 기초공법 대책연구)

  • Lee, Y.H.;Lee, D.M.
    • Journal of Korean Port Research
    • /
    • v.10 no.2
    • /
    • pp.69-90
    • /
    • 1996
  • This study is related to save the bearing capacity from using Meyerhof formula namely, static mechanics formula with the S.P.T(N value) of the soft ground and is to choose the soft ground improvement method by the using of total load for the proper method of the pile foundation and then to design the most suitable pile foundation to fit the actual circumstance. The purpose of this study is calculating the diameter of the pile foundation by static mechanics formula and introducing the optimum design condition from the result of the bearing capacity for using N value of the S.P.T obtained from the deep soft ground about the piles such as P.H.C pile, pipe and cast-in-place pile of big diameter, etc. As above-mentioned, it is considered that the use of P.H.C pile or pipe pile is advisable on the synthetical investigation and that the selection of cast-in-place pile method is desirable in terms of the constructive safety and durability.

  • PDF

Nutrient Removal Hybrid Process to Use Suspended and Attached Growth Microorganisms and Apply the Contact and Stabilization Process (부유 및 부착성장 미생물을 이용한 접촉안정형 영양염류처리 하이브리드 공정)

  • Kim, Man-Soo;Park, Jong-Woon;Lee, Sang-Ill;Park, Chul-Whi
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.4
    • /
    • pp.452-459
    • /
    • 2007
  • Nutrient removal hybrid process to use suspended and attached growth microorganisms and apply the contact and stabilization process was process obtaining good results to HRT within 6 hours to dominate nitrifier and to promote separation and growth of autotrophs and heterotrophs to pack with EPS(Expanded Poly-Styrene) media in nitrification reactor. An average effluent quality of this process was below 5.2 mg/L, 7.3 mg/L, 4.9 mg/L as $BOD_5,\;COD_{Mn}$, SS concentration and 6.8 mg/L, 0.6 mg/L as T-N, T-P concentration. Also, An average removal efficiency of this process was 94.6%, 79.8%, 94.9% as $BOD_5,\;COD_{Mn}$, SS and 70.8%, 76.9% as T-N, T-P. 16S-rRNA analysis result of microorganisms attached to EPS media was researched Nitrosomonas and Nitrosococcus blown to ammonia-oxidizing bacteria cluster to include Gallionella and these microorganisms were researched to involve about 6% of biofilm attached EPS media. Consequently, this process was treated below 10 mg/L and 1.0mg/L as T-N, T-P concentration at short hydraulic retention time(about 6 hr) to dominate nitrifier.

A Study on the Grouting Effect of Ultrafine Cement in Rock Ground (초미립자 시멘트의 암반지반 그라우팅 주입효과에 관한 연구)

  • An, Jun-Hee;Park, Choon-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.279-286
    • /
    • 2018
  • The grouting method is to reinforce the ground by injecting the chemical solution for the strengthening of the ground. Cement grouting material has usually used portland cement for centuries ago, but the cement particle size is large and the injection effect is limited. This study analyzes the effect of ultrafine cement grouting in rock ground using 3S-1 grouting in rock ground and ordinary Portland cement (OPC). The results of tests were compared and analyzed from the Lugeon test, bore loading test (P.M.T.), and injection (P-Q) test. The use of ultrafine cement (3S-1) had a higher effect (K, 10-6cm/sec) than OPC. The reinforcement effect of 3S-1 was also confirmed. Ultrafine cement (3S-1) was 4~9 times more injectable than OPC. Therefore, it is more advantageous to use ultrafine cement (3S-1) than OPC.

Evaluation of Treatment Efficiencies of Pollutants under Different Pollutant Fractions in Activated Sludge-Constructed Wetland System for Treating Piggery Wastewater (활성슬러지-인공습지 공법에 의한 돈사폐수처리시스템에서 오염물질의 분획별 정화효율 평가)

  • Kim, Seong-Heon;Seo, Dong-Cheol;Park, Jong-Hwan;Lee, Choong-Heon;Choi, Jeong-Ho;Kim, Hong-Chul;Ha, Yeong-Rae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.31 no.4
    • /
    • pp.344-350
    • /
    • 2012
  • BACKGROUND: To design and develop a constructed wetland for effective livestock wastewater treatment, it is necessary to understand the removal mechanisms of various types of pollutants in constructed wetlands. The objective of this study was to evaluate the treatment efficiency of pollutants under different types of fraction in constructed wetland system for treating piggery wastewater. METHODS AND RESULTS: The piggery wastewater treatment plant that consisted of activated sludge tank, aerobic and anaerobic beds was constructed. The concentration of COD(Chemical oxygen demand) in effluent by fraction was 71.5 mg/L for soluble COD, 142 mg/L insoluble COD. The concentration of SS(Suspended solid) in effluent by existing form was 102 mg/L for volatile SS, 15.5 mg/L for fixed SS. The concentration of T-N(Total nitrogen) and T-P(Total phosphorus) in effluent by existing form were 12.8 mg/L and 3.05 mg/L for dissolved form, 35.0 mg/L and 1.93 mg/L for suspended form. The removal efficiencies of COD, SS, T-N and T-P in hot season(summer and autumn) were higher than those in cold season(spring and winter). The removal efficiencies of COD, SS, T-N and T-P in effluent were 98.0, 99.0, 98.2 and 99.2% for all seasons, respectively. CONCLUSION(S): The results indicated that removal types of pollutants were insoluble COD(ICOD), volatile SS(VSS), dissolved T-N(DTN) and dissolved T-P(DTP) in constructed wetlands for treating piggery wastewater.