• 제목/요약/키워드: Owner's Requirements

검색결과 54건 처리시간 0.025초

기획단계 발주자 요구사항 기반 Requiremental Function Method VE 적용 (Requiremental Function Method based Owner's Requirement in VE Process Application at Planning Stage)

  • 박인지;손명진;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.123-125
    • /
    • 2012
  • It is the important accurately to identify the needs of our customers in order to success the project. Requirements in the early stages of business is very abstract or not quantitative, and that will cause problems such as cost or schedule changes. Particularly many people are likely to prefer the early stages of the project, because the time of applying VE related cost savings is important. Owner's requirement analysis for project success in the VE process does not easy, and specific ongoing management of the requirement is difficult. Therefore, the analysis and the application of owner's requirements is limited in project process. The purpose of this study is proposed to the RFM technique to supplement the functional analysis on the basis owner's requirements analysis in planning a building project.

  • PDF

설계단계에서 건축주 만족도 증진을 위해 가치평가방법을 활용한 설계자 접근절차에 대한 연구 (The Study of Designer's Approaching Procedure by Applying Value Evaluation Method to improve Degree of Owner's Satisfactions in Design Phase)

  • 이도형;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.117-122
    • /
    • 2006
  • 기본설계단계에서 설계자가 건축주 요구사항 만족을 위해 접근하는 방법이 다양하나, 설계과정에서 건축주 및 관련자가 참여하여 정량적으로 설계의 중간과정을 평가하는 것이 부족하다. 이로 인해 설계가 완료된 후에 수많은 변경을 하여 설계자로 하여금 많은 손해를 입게 한다. 이러한 것을 방지하지 위해 기본설계 초기단계에서부터 건축주의 요구사항을 체계적으로 정리하고, 설계자는 그 것을 만족시키는 설계 초안에 대해 건축주 및 관련자들에게 가치평가를 하게한다. 이 후로 일정가치가 이상이 되면 다음 설계단계로 진행되게 하여, 설계가 완료된 후에 건축주의 의도가 제대로 반영되지 않거나 건축주가 의사를 변경하여 발생되는 재설계를 방지하게 함으로써 설계자의 추가 비용을 현저히 줄일 수 있다. 또한 건축주도 설계결과 및 시공결과에 대해 평가하게 하고 건축주의 의도가 제대로 반영되었는지를 알 수 있게 한다. 또한 건축주의 만족도를 평가하게 하고, 건축주나 설계자가 상호 설계 및 시공결과를 정량적으로 확인시켜 시공 후에 발생되는 논란을 최소화 시킨 수 있는 장점이 있다. 본 논문은 설계과정에서 각 결과물에 대해 가치를 평가한 후 일정 전수가 이상 되면 다음단계로 넘어가게 하여 설계자의 손해를 최소화 시킬 수 있다는 것을 나타낸 것이다.

  • PDF

발주자 참여 확대를 위한 BIM 적용요소에 관한 연구 (Application of BIM Elements for Owner's Decision - Making Support)

  • 이경하;박재현;조성;조용;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

Multi-Criteria Decision-Making Model Using Quality Function Deployment (QFD) Method for the Most Suitable Temporary Earth Retaining System

  • Jung, Bae Yu;Byung, Cho Han;Jin, Han Sang;Won, Kwon;Ho, Jo Jae;Youl, Chun Jae
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.620-621
    • /
    • 2015
  • In this study, the multi-criteria decision-making model based on Quality Function Deployment Method is proposed. Multicriteria decision-making is an attempt to link QFD method with the TOPSIS. By this effort, a model that makes client's decision-making more rational and objective in design phase is suggested. The multi-criteria decisionmaking model confirming to the Owner's requirements will improve the productivity of the construction industry and the satisfaction of the customer. Further study extending the range of the requirements, not only the Owner's requirement will be necessary to cover the various factors as much as possible. And then, finally as a flexible platform to achieve a sustainable quality management, web-based multi-criteria decision-making model can be utilized by the relevant stakeholders simultaneously with the feed-back and sharing the necessary informations.

  • PDF

A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT

  • Choong-Wan Koo;Sang H. Park;Joon-oh Seo;TaeHoon Hong;ChangTaek Hyun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.676-684
    • /
    • 2009
  • Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, in this study, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case-based reasoning (CBR) methodology. The model suggests cost estimation with the most similar historical case as a basis for the estimation. In this study, the optimization process was also conducted, using genetic algorithms that reflect the changes in the number of project characteristics and in the database in the model according to the owner's decision making. Two optimization parameters were established: (1) the minimum criteria for scoring attribute similarity (MCAS); and (2) the range of attribute weights (RAW). The cost model proposed in this study can help building owners and managers estimate the project budget at the business planning stage.

  • PDF

Adjusting Planning Management and Control to the Owner Environment Case Study: Consultant Adjustment to the Owner Environment in Thailand

  • Sruntummakul, Apai;Leungbootnak, Narong;MIN, Vuthea
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권3호
    • /
    • pp.10-17
    • /
    • 2015
  • Consultant and owner play a very important role in the construction sector which is one of the main sectors in economic development. There are many stakeholders in a construction project including but not limited to: owner, consultant, contractor, subcontractor, and supplier. The consultant is the party who is to stay in close touch with the project owner, which both consultant and owner are considered as the main key stakeholders to make the project happen. It's not a simple task for a consultant to just implement the same style of management and control within various projects that are of a different background and character of owners. Thus, the adjusting plan management and control to the owner environment has been an essential technique to drive the project to success. The objective of this paper is to identify the significant management techniques for adjusting a plan of management and control to the owner environment in Thailand. The methodology is the identification throughout the analogous to abduction from literature review and our empirical observations of Future Engineering Consultants Co, Ltd. We have been in consultation for twenty-five years (25) in Thailand with 209 projects from both public and private owners. As a result, there are (1) Project management styles, (2) Personal style, (3) Owner expectation management, (4) Scope Management, (5) Time Management, (6) Cost Management, (7) Quality Management, and (8) Environmental Management. The input are: a clear defined goal, showing respect by giving good service, maintaining high quality, keeping in touch with owners, and resources. This would give the output of the project's success by meeting the owner's expectation and requirements.

표준$\cdot$전문$\cdot$공사시방서의 작성방법 개선방안에 관한 연구 (A Study for the Development of Writing National Standard Specifications, Owner′s Standard Specifications and Project Specifications)

  • 구재동;김태송
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.81-88
    • /
    • 2000
  • 정부에서는 건설기술관리법 개정을 통해 국내 시방서의 위계를 표준시방서, 전문시방서, 공사시방서로 정하였고, 설계도서 작성시 기존의 '특별(특기)시방서'에 여러 표준시방서 등을 첨부하여 사용하던 것에서 탈피하여, 표준시방서, 전문시방서 등의 해당 내용을 발췌, 수정, 보완하여 '공사시방서'를 작성하도록 하였다. 그러나 아직도 공사시방서의 수준은 이전의 특별(특기)시방서의 수준을 벗어나지 못하고 있다. 본 연구에서는 이러한 상황에서 공사시방서 수준을 향상시키기 위하여 시방서(표준 전문공사)운영체계 개선방안 및 시방서(표준$\cdot$전문$\cdot$공사)의 일반적인 작성방법 개선방안 ,총칙 작성방법 개선방안 등을 제시하였다.

  • PDF

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

건축설계 품질 평가지표 개발을 위한 기초연구 (A Fundamental Study on the Development of Indicators for the Assessment of Design Quality)

  • 최연주;이준성
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.584-587
    • /
    • 2006
  • 건축물은 발주자의 분명한 수요에 의한 계약을 시작으로 설계 및 시공 프로세스가 진행된다. 따라서 건축물의 품질평가에 있어 발주자 요구사항의 충족여부가 관건이라 할 수 있다. 이에, 본 연구에서는 국내 현황에 적합한 설계품질 평가지표를 개발하고자, 설계업무 현황파악을 위한 설문조사 및 영국의 Design Quality Indicator(DQI) 분석을 수행하였다. 설문결과, 발주자 요구사항은 가변성이 크기 때문에 설계변경을 야기하는 주요인으로 분석되었다. 영국의 설계품질 평가지표인 DQI는 발주자 요구사항 도출, 건축물의 최종 품질평가 등, 프로젝트 전과정에서 적용가능한 평가지표라 정의할 수 있다. 현재 영국에서는, DQI의 사용자 및 적용 범위가 점차 확대되어가는 추세이다. 향후, 국내 현황 및 프로젝트 특성을 반영하여 구체적인 설계품질 평가지표가 제시되어야 할 것이다. 나아가, 평가결과의 가장 효과적인 표현방법(Visualization) 및 설계품질 평가기능을 지원하는 도구 개발을 위한 지속적인 연구가 수행되어야 할 것이다.

  • PDF

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF