• 제목/요약/키워드: Overhead wire

검색결과 177건 처리시간 0.026초

능동 판토그래프 제어기 설계에 관한 연구 (Design of Active Pantograph Controller)

  • 고태환;엄주환;엄기영;신승권
    • 한국철도학회논문집
    • /
    • 제8권4호
    • /
    • pp.361-366
    • /
    • 2005
  • The high investment is necessary for the new high speed lines. So the KRRI has been interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The pantograph in train is indispensable in order to supply the electrification equipments with power in safe. The pantograph and the overhead wire form a dynamic coupled system and they affect each other through the contact force. Unfortunately, as the operational speed of a train increases, the vibration of the pantograph and the overhead wire also increases. This may lead to a zero contact force between the pantograph head and the overhead wire, which can results in the loss of contact, arching and abrasion. If the arching and spark happen between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper describes the dynamic response between the pantograph and catenary system by the numerical simulations and presents the LQ-servo controller to reduce the contact force variation

집전시스템의 동적 수치모의 해석에 관한 연구 (A Study on a dynamic simulation of Current Collection System)

  • 허신;경진호;;송달호;박성훈;김정수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.151-158
    • /
    • 1999
  • In this study, we developed the simulation program of an overhead catenary-pantograph system, The overhead catenary is modeled with point mass and the pantograph is replaced with 3 d. o. f. model which is composed of mass, spring and damper. Using the developed program, we analyzed the static structure of the overhead catenary and the dynamic characteristics of an overhead catenary-pantograph system such as uplift displacement of contact wire and contact force. we compared the analysis results with the results of GASENDO software developed at RTRI in Japan. The behaviors of uplift displacement of contact wire and contact force were similar with the results of GASENDO software.

  • PDF

팬터그래프-전차선로 접촉부 영상처리 기술 개발 (Development of Image Processing Technology for Interaction between Pantograph and Overhead Contact Wire)

  • 김형준;박영;조용현;조철진;김인철
    • 한국전기전자재료학회논문지
    • /
    • 제22권12호
    • /
    • pp.1084-1088
    • /
    • 2009
  • The measurement of dynamic stagger in electric railways is one of the key test parameters to increase speed and maintain safety in electric railways. This paper is introduces a non-contact optical-based measuring instrument of a catenary system in electric railways. The instrument is implemented by utilizing a CCD (Charge Coupled Device) camera installed on the roof of a vehicle for vision acquisition and image processing techniques including the Canny edge detector and the Hough transform to detect contact wires and calculate dynamic stagger. To check the validity of our approach for the intended application, we measured stagger of a overhead wire of a Korea Tilting Train (TTX). The non-contact optical-based measurement system proposed in this paper performs real-time stagger measurement of an activated high-voltage contact wire. By results of this paper, the instrument should be applied to assess performance and reliability of newly developed electric railway vehicles.

국내 배전계통의 가공지선 접지조건에 따른 뇌서지 영향 분석 (Analysis of Effect on Lightning Surge according to the Grounding Condition of Overhead Ground Wire in Distribution System)

  • 한준;김철환;서훈철;최선규;이병성
    • 전기학회논문지
    • /
    • 제63권3호
    • /
    • pp.331-337
    • /
    • 2014
  • The Korean distribution system consists of overhead ground wire (OHGW), phase conductors and neutral wire. Especially, OHGW is installed over the phase conductors to protect distribution system from the lightning surge. The flashover rate and the magnitude of lightning overvoltage on distribution system can be affected by grounding condition of OHGW such as grounding resistance and grounding interval. In this paper, we conduct an analysis of lightning overvoltage and flashover rate according to the grounding condition of OHGW. The distribution system and lightning surge are modeled by using ElectroMagnetic Transient Program (EMTP). Also, the Monte Carlo method is applied to consider random characteristics of lightning, and the flashover rate is calculated based on IEEE std. 1410. The simulations are performed by changing the grounding resistance and interval of OHGW and the simulation results are analyzed.

전차선로 검측을 위한 실시간 화상처리 시스템 구현 (Implementation of Real-Time Monitoring System for Overhead Contact Wire in Electric Railway)

  • 박영;조용현;이기원;권삼영;박현준;장동욱
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2006년도 하계학술대회 논문집 Vol.7
    • /
    • pp.543-544
    • /
    • 2006
  • This paper describes a simple real-time monitoring system for use in measurement subsystem of contact wire and geometry of overhead contact wire in electric railway. The system has been consists of a high speed CMOS camera with resolution $1024\;{\times}\;1280$ pixels, line type laser source with a power equal to 300 mW, and PC-based image acquisition system with PCI Express slot. National instrument LabVIEW (8.0) and vision acquisition software have been used in application programming interface for image acquisition, display, and storage with a frequency of sampling of 500 acquisitions per second.

  • PDF

송전선로 점퍼선 횡진방지용 지지애자장치 개발 (Development of Hold on Swing a Jumper Support String for Overhead Transmission Line)

  • 백승도;민병욱;위화복;박기용;금의연;정헌수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.521-523
    • /
    • 2005
  • A Jumper wire is currently used to connect each fixed power line on both sides of dead end tower for overhead transmission line, but in case of a jumper wire swing under circumstances of typhoon, etc. and the air clearance is deficient then a flashover fault may Happen. Now the angle tower has the jumper support string to prevent a swing of jumper wire and to secure the air clearance between jumper wire and tower main body, but the flashover fault by swing of jumper wire was happened yl times across all over the country, because of the typhoon 'Rusa' in year 2002 and 'Maemi' in year 2003. This paper presents the design and development of 'Counter Weight' which enables to keep the swing angle of jumper wire under 40 degree in design condition to prevent a flashover fault by swing of jumper wire by a high wind pressure load in case of typhoon and have completed a mechanical and electrical characteristic test.

  • PDF

스프링식 자동장력 조정장치의 소개 및 경제성 분석 (An Introduction and Economical Efficiency analysis of Spring Tension Balancer)

  • 윤용한;임금광;신승식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.856-861
    • /
    • 2005
  • This paper presents an introduction and economical efficiency analysis of spring tension balancer in trolly wire system. In the overhead trolly wire systems, one of the most things is tension balancer. Because it can be automatically adjusted tension for expansion and contraction of overhead catenary system. In this paper, we introduced spring tension balancer and analyzed economical efficiency of it.

최고운행속도 350km/h급 전차선로 최대경간길이 계산 기법 (Technique of Maximum Span Length Calculation for 350km/h High Speed Catenary System)

  • 창상훈;이기원;유향복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.924-931
    • /
    • 2011
  • This paper deal with maximum span calculation technique for 350km/h high speed catenary system. Considers a geometric interaction, possible maximum span length is between two pole. Wind condition and the train current collector is moving even to being pantograph does not escape while operating. Uses like this justice and possible maximum span length is follow next condition. (i) Operating range of pantograph fan head, (ii) The wind velocity which assumes from system, (iii) Width in pantograph from operation height moving, (iv) Type of processing Catenary system, specially tensile strength of overhead contact wire and messenger wire etc. When accurately calculates the maximum permission span, the dropper between of overhead contact wire and messenger wire and must consider the correlation.

  • PDF

전차선 압상 검측을 위한 시스템 기술 (The Technology of Measurement System for Contact Wire Uplift)

  • 박영;조용현;김형철;권삼영;김인철;최원석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.900-904
    • /
    • 2009
  • The measurement of contact wire uplift in electric railway is one of the most test method to accept the maximum permitted speed of new vehicles or pantographs. The contact wire uplift can be measured for shot periods when pantograph is running in monitoring station. This paper describes the development of two different methods for contact uplift measurement using vision-based system and wireless online monitoring system. Our vision-based system employs a high-speed CMOS (Complementary Metal Oxide Semiconductor) camera with gigabit ethernet LAN. The development of a real-time remote monitoring system that acquires data from any kind of sensor to be transmitted by wireless communication from overhead line and structure at 25 kV to a computer in catenary system. The proposed two kind of different measurement systems to evaluation for dynamic uplift of overhead contact wire shows promising on-field applications for high speed train such as Korea Tilting Train (TTX) and Korea Train eXpress (KTX).

  • PDF