• Title/Summary/Keyword: Overhead

Search Result 3,444, Processing Time 0.035 seconds

Suitability Evaluation on Joint Operation of Neutral Wire and Overhead Grounding Wire through Lightning Surge Analysis in Combined Distribution System (혼합배전계통에서 뇌과전압 해석을 통한 중성선과 가공지선 혼용 운전의 타당성 평가)

  • Jeong, Seok-San;Lee, Jong-Beom;Kim, Yong-Kap;Song, Il-Keun;Kim, Byoung-Suk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2135-2142
    • /
    • 2010
  • This paper studies the validity about a joint operation of neutral wire and overhead grounding wire in combined distribution systems. The overhead grounding wire and neutral wire are currently installed separately and grounded by common. However there is no any ineffectiveness or electrical problem in case of the proposed system, such system can be operated at real distribution system. Therefore this paper describes the suitability of a joint operation through lightning surge analysis on combined distribution systems. Lightning surge analysis is carried out by EMTP/ATPDraw to obtain the overvoltage of overhead line and underground cable in various conditions such as locations and current types of lightning stroke. Overvoltage gained by the analysis show that the insulation strength of the joint operation case is not stable compare with the current operation case.

Overhead Rigid Conductor and Transition Structure for High-Speed (Over 250 km/h) I : Structural Design (250 km/h급 고속용 강체전차선 및 이행장치 I : 구조설계)

  • Kim, Bong-Suk;Won, Yong-Hee;Park, Seol-Hee;Bae, Sang-Joon;Jang, Kwang-Dong
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.25 no.1
    • /
    • pp.7-13
    • /
    • 2016
  • With the increasing running speed of trains, new railway lines in metropolitan areas, and the rising demand for green transportations, the number of underground and tunnel sections are constantly becoming larger, and installations of overhead rigid conductor systems are becoming wider. However, domestic commercial products for overhead rigid conductors are limited to 120 km/h train speeds. In this study, to develop a high-speed (250 km/h) overhead rigid conductor, R-Bar (Rigid Bar), the electrical and mechanical stability was enhanced through the improvement of the cross sectional shape of the R-Bar; the transition structure was also designed for flexibility and natural frequency isolation. In addition, the evaluation of contact forces between a pantograph and the overhead rigid conductor system for 250 km/h train speeds was performed using dynamic analysis.

Performance Analysis of Disconnected Operation on Mobile Computing (비연결 수행 이동컴퓨팅 태스크의 성능 분석)

  • 정승식;김재훈
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.3B
    • /
    • pp.202-211
    • /
    • 2002
  • Because wireless links are subject to disturbances and failures, it is important to support disconnected operations in mobile computing. Many schemes have been proposed to support the efficient disconnected operations. In this paper, we analyze and measure the computation time including disconnected operations to evaluate the performance of mobile computing on error prone wireless links. Mobile computation consists of three states: data hoarding, disconnected operation, and block states. We estimate the computation time using various parameters; error rate and recovery rate of wireless link, hoarding overhead, logging overhead, and reintegration overhead, etc. We can choose efficient strategies for disconnected operations and predict the performance using the results of this analysis.

Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach

  • Heo, Jae-Haeng;Kim, Mun-Kyeom;Kim, Dam;Lyu, Jae-Kun;Kang, Yong-Cheol;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1248-1257
    • /
    • 2014
  • Overhead transmission lines are crucial components in power transmission systems. Well-designed maintenance strategy for overhead lines is required for power utilities to minimize operating costs, while improving the reliability of the power system. This paper presents a maintenance priority index (MPI) of overhead lines for a reliability centered approach. Proposed maintenance strategy is composed of a state index and importance indices, taking into account a transmission condition and importance in system reliability, respectively. The state index is used to determine the condition of overhead lines. On the other hand, the proposed importance indices indicate their criticality analysis in transmission system, by using a load effect index (LEI) and failure effect index (FEI). The proposed maintenance method using the MPI has been tested on an IEEE 9-bus system, and a numerical result demonstrates that our strategy is more cost effective than traditional maintenance strategies.

Human Detection in Overhead View and Near-Field View Scene

  • Jung, Sung-Hoon;Jung, Byung-Hee;Kim, Min-Hwan
    • Journal of Korea Multimedia Society
    • /
    • v.11 no.6
    • /
    • pp.860-868
    • /
    • 2008
  • Human detection techniques in outdoor scenes have been studied for a long time to watch suspicious movements or to keep someone from danger. However there are few methods of human detection in overhead or near-field view scenes, while lots of human detection methods in far-field view scenes have been developed. In this paper, a set of five features useful for human detection in overhead view scenes and another set of four useful features in near-field view scenes are suggested. Eight feature-candidates are first extracted by analyzing geometrically varying characteristics of moving objects in samples of video sequences. Then highly contributed features for each view scene to classifying human from other moving objects are selected among them by using a neural network learning technique. Through experiments with hundreds of moving objects, we found that each set of features is very useful for human detection and classification accuracy for overhead view and near-field view scenes was over 90%. The suggested sets of features can be used effectively in a PTZ camera based surveillance system where both the overhead and near-field view scenes appear.

  • PDF

Overhead Compensation Technique to Enhance the Accuracy of a Software Timer for Light-weight Embedded Device (경량 임베디드 디바이스 환경에서 소프트웨어 타이머의 정확성 향상을 위한 오버헤드 보정기법)

  • Kim, Hiecheol
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.4
    • /
    • pp.9-19
    • /
    • 2019
  • As light-weight embedded devices become widely used in the area of low-power networking and high-precision sensor data acquisition, support for time-critical applications becomes essential for the light-weight embedded devices. This paper addresses the accuracy issue of a software timer for small or tiny embedded devices equiped with light-weight MCUs(Micro controller units). We first explore the characteristics of overhead in a typical implementation of a software timer, and then measure the overhead through a realistic implementation. Using the measurement result, we propose an overhead compensation technique which reduces the overhead from the hardware timer-tick.

Dynamic response of an overhead transmission tower-line system to high-speed train-induced wind

  • Zhang, Meng;Liu, Ying;Liu, Hao;Zhao, Guifeng
    • Wind and Structures
    • /
    • v.34 no.4
    • /
    • pp.335-353
    • /
    • 2022
  • The current work numerically investigates the transient force and dynamic response of an overhead transmission tower-line structure caused by the passage of a high-speed train (HST). Taking the CRH2C HST and an overhead transmission tower-line structure as the research objects, both an HST-transmission line fluid numerical model and a transmission tower-line structure finite element model are established and validated through comparison with experimental and theoretical data. The transient force and typical dynamic response of the overhead transmission tower-line structure due to HST-induced wind are analyzed. The results show that when the train passes through the overhead transmission tower-line structure, the extreme force on the transmission line is related to the train speed with a significant quadratic function relationship. Once the relative distance from the track is more than 15 m, the train-induced force is small enough to be ignored. The extreme value of the mid-span dynamic response of the transmission line is related to the train speed and span length with a significant linear functional relationship.

Study on the Rice Yield Reduction and Over head Flooding Depth for Design of Drainage System (배수 설계를 위한 벼의 관수심 및 관수피해율에 관한 연구)

  • 김천환;김시원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.4
    • /
    • pp.69-79
    • /
    • 1982
  • The objective of this study is to contribute to drainage planning in the most realistic and economical way by establishing the relationship between rice yield reduction and overhead flooding by muddy water of each growth stage of paddy, which is the most important factor in determining optimum drainage facilities. This study was based on the data mainly from the experimental reports of the Office of Rural Development of Korea, Reduction Rate Estimation for Summer Crops, published by Ministry of Agriculture and Forestry of Japan and other related research documenta- tion. The results of this study are summarized as follows 1. Damages by overhead flooding are highest in heading stage and have the tendency of decrease in the order of booting stage, panicle formation stage, tillering stage, and stage just after transplanting. Damages by overhead flooding of each growing stage are as follows: a) It is considered that overhead flooding just after transplanting gives a little influence on plant growth and yield because the paddy has sufficient growth period from floo ding to harvest time. b) Jt is analyzed that according to the equation y=11 12x 0.908 which is derived from this study, damages by overhead flooding during tillering stage for 1, 2, 3 successive days are 11.1 %, 20.9%, and 30.2% respectively. c) Damages by overhead flooding after panicle formation stage are very serious because recovering period is very short after damage and ineffective tillering is much. Acc- ording to the equation y=9. 58x+10. Ol derived from this study, damages by overhead flooding fal 1,2,3,5 successive days are 19.6%, 29.2%, 38.8%, 57.9% respectively. d) Booting stage is the very important period in which young panicle has grown up almost completely and the number of glumous flower is fixed since reduction division takes place in the microspore mother cell and enbryo mother cell. According to the equation y=39. 66x 0.558 derived from this study, damages by overhead floodingfor 0.5, 1, 3, 5 successive days are 26.9%, 39.7%, 72. 2% and 97.4%, respectively. Therefore, damages by overhead flooding is very serious during the hooting stage. e) When ear of paddy emerges, flowering begins on that day or the next day; when paddy flowers, fertilization will be completed 2-3 hours after flowering. Therefore overhead flooding during heading stage impedes flowering and increases sterilizing percentage. From this reason damages of heading stage are larger than that of booting stage. According to the equation y-41 94x 0.589 derived from this study, damages by overhead flooding for 0.5, 1, 3, 5, successive days are 27.9%, 63.1 %, 80.1%, and 100% 2. Considering that temperature of booting stage is higher than that of beading stage and plant height of booting stage is ten centimeters shorter than that of heading stage, booting stage should be taken as a critical period for drainage planning because possi- bility of damage occurrence in booting stage is larger than that of heading stage. There-fore, it is considered that booting stage should be taken as critical period of paddy growth for drainage planning. 3. Overhead flooding depth is different depending on the stage of growth. In case, booting stage is adopted as design stage of growth for drainage planning, it is conside red that the allowable flooding depth for new varieties and general varieties are 70cm and 80cm respectively. 4. Reduction Rate Estimation by Wind and Flood for Rice Planting of the present design criteria for drainage planning shows damage by overhead flooding for 1 to 2, 3 to 4, 5 to 7 consecutive days; damages by overhead flooding varies considerably over several hours and experimental condition of soil, variety of paddy, and climate differs with real situation. From these reasons, damage by flooding could not be estimated properly in the past. This study has derived the equation which shows damages by flooding of each growth stage on an hourly basis. Therefore, it has become possible to compute the exact damages in case duration of overhead flooding is known.

  • PDF

An Elliptic Curve Cryptosystem based on Trust and RBAC to Reduce Security Overhead in Sensor Networks (센서네트워크의 보안 오버헤드를 줄이기 위한 신뢰와 RBAC 기반의 타원곡선암호)

  • Kim, Hyojin;Park, Ho-Hyun
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.11
    • /
    • pp.747-756
    • /
    • 2013
  • It is important to reduce unnecessary overhead in sensor network using battery. In addition encryption is important because of necessity of security. Since unavoidable overhead occurs in case of encryption, security and overhead are in trade-off condition. In this paper, we use a concept called trust to reduce the encryption overhead. We reduce overhead by controlling encryption key sizes while maintaining the security level where high and low trust nodes are mixed. We simulated and compared normal encryption and trust value based encryption. As a result, the latter has lower execution time and overhead. If we define a standard of trust levels considering purpose and circumstances of real network, we can use constrained resources efficiently in sensor network.

Return to Play of Elite Overhead Athletes with Superior Labral Anterior Posterior Tears only after Rehabilitation

  • Park, Jin Young;Hong, Kyung Ho;Lee, Jae Hyung;Oh, Kyung Soo;Chung, Seok Won;Jeon, Seung Hyub;Cha, Myung Joo
    • Clinics in Shoulder and Elbow
    • /
    • v.20 no.2
    • /
    • pp.77-83
    • /
    • 2017
  • Background: Although there have been multiple reports on surgical outcomes of superior labral anterior to posterior (SLAP) lesions in overhead athletes, only a few reports exist in the literature about the results of nonoperative treatment in elite (collegiate or professional) overhead athletes. To determine the clinical outcomes of nonoperative treatment of SLAP lesions in elite overhead athletes. Methods: Between January 2006 and December 2011, 69 patients were selected. Initial arthroscopic SLAP repair was performed in 19 patients and of the 50 patients who underwent nonsurgical treatment, such as range of motion gain and periscapular muscle strengthening, 14 patients were converted to surgical treatment; 5 patients were lost to follow-up. Medical records of 31 elite overhead athletes who underwent nonsurgical treatment were retrospectively reviewed. Four clinical outcome measures were used: visual analogue scale (VAS) for pain, VAS for satisfaction, American Shoulder and Elbow Surgeons (ASES) score, and subjective feeling of recovery. Results: The average follow-up period was 35.9 months (range, 24-62 months). The VAS for pain decreased from 6.5 to 2.2 (p<0.01) and VAS for satisfaction was 7.6. The ASES score increased from 54.1 to 85.9 (p<0.01). The overall average value of subjective feeling of recovery was 72%. Twenty-three out of 31 elite athletes (74.2%) returned to play after rehabilitation; these 23 athletes performed at the same or higher levels after rehabilitation. Conclusions: Nonsurgical treatment in elite overhead athletes with SLAP lesion should be considered as a treatment option.