• 제목/요약/키워드: Overflow Area

검색결과 134건 처리시간 0.026초

제주도내 유수하천에 대한 수질특성 및 오염부하량 산정 (The Characteristics of Water Quality and the Estimation of Pollutant Loadings from the Flowing Streams in Cheju Island)

  • 조은일;오윤근
    • 한국환경과학회지
    • /
    • 제7권6호
    • /
    • pp.845-851
    • /
    • 1998
  • In order to manage the water quality from the flowing streams in Cheju Island, the characteristics of water quality was investigated from August, 1996 to May, 1997 and the pollutant loadings for future were estimated from the watershed at each stream. Comparing the mean concentrations of each water quality with the criterion of water quality in river, it was under I class except for Changgo Stream, for DO, under I class at the whole station for SS and under II class for BOD. As the pollutant loadings at each stream in 2020 is compared with those in 1996, the estimated results are as follows : 1) for BOD, 59% at Donghong Stream, 24% at Yeonoe Stream, 44% at Ohngpo Stream and 57% at Changgo Stream. 2) for T-N, 91% at Donghong Stream, 76% at Yeonoe Stream, 63% at Ohngpo Stream and 89% at Changgo Stream. 3) for T-P, 69% at Donghong Stream, 42% at Yeonoe Stream, 45% at Ohngpo Stream and 73% at Changgo Stream. The point source loadings discharged through combined sewer could be treated at sewage treatment plant. However, the expected slow decreasing rate of BOD, T-N, and T-P loadings is due to the part of untreated nonpoint source loadings. Nonpoint source loading overflow typically occurs when the flow of stormwater combined with sewage exceeds the capacity of the interceptor sewers. Since most of the sewers used in Cheju Island are the combined sewers, the combined overflow sewage is bypassed into the receiving water area after a rainstorm. Therefore, a means to control nonpoint source loadings should be considered for the river and marine water quality management.

  • PDF

댐 붕괴 홍수모의에 대한 불확실도 해석 (Uncertainty Analysis for Dam-Break Floodwave Simulation)

  • 이홍래;한건연;조원철
    • 한국수자원학회논문집
    • /
    • 제31권3호
    • /
    • pp.337-345
    • /
    • 1998
  • 댐 붕괴에 따른 홍수류의 해석시의 불확실도를 규명하기 위해서 범용 프로그램인 DAMBRK 모형을 Monte-Carlo 기법을 이용하여 수정, 보완함으로써 댐 및 하천제방에 대한 붕괴 위험도를 산정할 수 있는 DAMBRK-U 모형을 개발하였다. 본 모형은 하천의 홍수추적에 있어서 불확실도에 기인한 홍수위 해석결과를 살펴보기 위해 확대하도, 균일하도 및 축소하도 구간에 적용하여 모형에 대한 비교검토를 실시하였는데, 축소하도 구간에서 유량과 수심에 있어 큰 변동치를 가지는 것으로 나타났다. 또한 본 모형은 1996년 7월 연천댐 붕괴에 따른 한탄강에서의 홍수범람 해석을 모의함으로써 모형의 실제 적용성을 입증하였다. 연천댐 유역에서 여러 가지 방류유량 조건에 따른 댐의 위험도를 계산하였다. 한탄강 유원지 지점에서의 제방고와 홍수위를 비교하여 월류 위험도를 산정한 결과 홍수위에 있어 제방고를 1,266~0.782m로 상회하는 월류가 발생하였고, 이 구간에서의 월류위험도는 100%로 나타났다.

  • PDF

잔류유량 기반 복원력 지수를 통한 빗물펌프장 자동운영 성능 검토 (A Study of the Automatic Operation Performance of a Pump Station using Resilience Considering Residual Flows)

  • 김영남;이의훈
    • 대한토목학회논문집
    • /
    • 제42권6호
    • /
    • pp.793-802
    • /
    • 2022
  • 증가하는 도시 침수 피해에 대응하기 위해서는 내배수시스템의 비구조적인 개선이 필요하다. 본 연구에서는 유수지 유입량과 외수위를 고려한 빗물펌프장 펌프/수문 자동운영 기술을 제안하고, 성능을 평가하기 위해 잔류유량 기반 복원력를 사용하여 기존 운영과의 성능차이를 비교하였다. 제안된 자동운영은 3가지 펌프운영과 2가지 수문운영으로 구성되었다. 펌프운영을 위해 모니터링 지점의 수심을 사용하였으며, 모니터링 지점은 최초월류발생지점과 최대월류발생지점을 고려하여 선택하였다. 대상유역은 대구 비산빗물펌프장이며, 강우자료는 재현기간 30년, 50년 및 70년으로, 지속시간 30분, 60분, 90분 그리고 120분으로 설정한 확률강우를 사용하였다. 적용결과 자동운영과 기존 운영의 복원력 차이는 최소 5.20E-05에서 최대 8.07E-04로 나타났다. 지속시간이 길어질수록 복원력 차이는 크게 나타났다.

상세지형스케일에 따른 도시유출모형의 관거월류 모의성능평가 (Sewer overflow simulation evaluation of urban runoff model according to detailed terrain scale)

  • 탁용훈;김영도;강부식;박문현
    • 한국수자원학회논문집
    • /
    • 제49권6호
    • /
    • pp.519-528
    • /
    • 2016
  • 최근 도시화 및 기후변화로 인한 집중호우가 빈번히 발생하고 있으며, 이로 인해 도시지역의 침수발생 위험도가 커지고 있다. 도시지역은 도로, 주택가, 지하시설 등 다양한 지형지물로 구성되어 있으며, 상세한 지형을 고려하지 못한 침수해석은 침수예상범위와 침수심을 제대로 표현하지 못한 결과를 도출할 수 있다. 특히, 인구와 자산이 밀집한 도심지에 대한 침수해석의 오류는 침수대책의 수립 및 재난대응에 큰 문제를 야기하여 인명과 재산피해로 이어질 수 있다. 도시지역 침수해석은 크게 관망흐름에 대한 해석과 지표면 범람해석 과정으로 구분되며, 각각의 해석과정상 정확도가 침수해석의 정확도에 영향을 미치게 된다. 이에 본 연구에서는 도시지역 침수해석 과정 중 지표면 표고자료의 정확도가 침수해석에 미치는 영향에 대한 평가를 위해 10m급 DEM, LiDAR 자료, 1:1,000 수치지도를 바탕으로 표고자료별 정량적인 침수예측결과를 검토하였다. 검토대상지역은 도림천 유역내 대림, 신림3, 신림4 배수분구로, 2010년 호우에 따른 침수모의를 XP-SWMM 모형으로 수행하였다. 모의결과, 10m DEM의 경우 표고자료의 오차로 인해 1m 이상 침수심이 발생되는 고위험지역에 대한 표현이 적절히 이뤄지지 못했으며, 특히 일부 월류가 발생하는 맨홀에 대해서는 지표면 침수가 발생하지 않는 것으로 나타났다. 따라서, 도시지역의 범람해석시 지형자료의 정확도는 중요한 요소가 되며, 10m DEM을 이용하는 경우는 신중을 기하여야 함을 알 수 있었다.

도시지역 침수피해액 산정을 위한 다차원법 적용 (Application of multi-dimensional flood damage analysis in urban area)

  • 탁용훈;김영도;강부식;박문현
    • 한국수자원학회논문집
    • /
    • 제50권6호
    • /
    • pp.397-405
    • /
    • 2017
  • 인구와 자산이 밀집된 도시에서 침수가 발생할 경우 농촌과 달리 관거월류에 의한 건축물 피해가 지배적이기 때문에 이를 고려한 피해액산정기법의 적용이 필요하다. 본 연구는 도림천 유역의 도림1 배수분구를 대상으로 침수예측을 다차원 홍수피해산정방법을 통한 침수피해액 분석을 실시하였다. 과거 침수가 발생한 강우사상을 활용하여 XP-SWMM 모형을 통한 도시유출해석 및 침수해석을 실시하였고, 침수구역의 행정구역별 기초자료와 유출해석 결과를 활용하여 건물 피해액을 산정하였다. 침수범위를 예측하기 위한 XP-SWMM모형 구동 결과, 관거 월류에 의한 침수 발생 4시간 후인 16시 30분에 침수면적이 가장 넓게 나타났고, 계산된 침수심 별 침수면적을 다차원법과 연계하여 건물 피해액을 산정하였다. 연구결과, 최대 침수면적은 $305,955m^2$으로 나타났으며, 0~0.5 m의 경우 $305,190m^2$, 0.5 m 이상은 $765m^2$으로 나타났으며, 침수해석 결과를 활용한 도림1 배수분구의 건물피해액은 약 155억 원, 건물 내용물 피해액은 약 70억 원으로 산정되었고, 0~0.5 m 이하의 건물 및 건물 내용물 피해액은 약 224억 원, 0.5 m 이상 약 1억 원으로 산정되었다. 본 연구결과를 토대로 할 때, 도시지역의 침수피해액 산정을 위해 침수심 및 침수시간과 같은 다양한 피해양상에 따라 세분화된 피해액 산정기법이 필요할 것으로 판단된다.

취입모의 경제적 계획취입수심 산정방법에 대한 연구 (A Study on a Calculation Method of Economical Intake Water Depth in the Design of Head Works)

  • 김철기
    • 한국농공학회지
    • /
    • 제20권1호
    • /
    • pp.4592-4598
    • /
    • 1978
  • The purpose of this research is to find out mathemetically an economical intake water depth in the design of head works through the derivation of some formulas. For the performance of the purpose the following formulas were found out for the design intake water depth in each flow type of intake sluice, such as overflow type and orifice type. (1) The conditional equations of !he economical intake water depth in .case that weir body is placed on permeable soil layer ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } { Cp}_{3 }L(0.67 SQRT { q} -0.61) { ( { d}_{0 }+ { h}_{1 }+ { h}_{0 } )}^{- { 1} over {2 } }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { dcp}_{3 }L+ { nkp}_{5 }+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ] =0}}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } C { p}_{3 }L(0.67 SQRT { q} -0.61)}}}} {{{{ { ({d }_{0 }+ { h}_{1 }+ { h}_{0 } )}^{ - { 1} over {2 } }- { { 3Q}_{1 } { p}_{ 6} { { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{ 2}m' SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L }}}} {{{{+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 } L+dC { p}_{4 }L+(2 { z}_{0 }+m )(1-s) { L}_{d } { p}_{7 }]=0 }}}} where, z=outer slope of weir body (value of cotangent), h1=intake water depth (m), L=total length of weir (m), C=Bligh's creep ratio, q=flood discharge overflowing weir crest per unit length of weir (m3/sec/m), d0=average height to intake sill elevation in weir (m), h0=freeboard of weir (m), Q1=design irrigation requirements (m3/sec), m1=coefficient of head loss (0.9∼0.95) s=(h1-h2)/h1, h2=flow water depth outside intake sluice gate (m), b=width of weir crest (m), r=specific weight of weir materials, d=depth of cutting along seepage length under the weir (m), n=number of side contraction, k=coefficient of side contraction loss (0.02∼0.04), m2=coefficient of discharge (0.7∼0.9) m'=h0/h1, h0=open height of gate (m), p1 and p4=unit price of weir body and of excavation of weir site, respectively (won/㎥), p2 and p3=unit price of construction form and of revetment for protection of downstream riverbed, respectively (won/㎡), p5 and p6=average cost per unit width of intake sluice including cost of intake canal having the same one as width of the sluice in case of overflow type and orifice type respectively (won/m), zo : inner slope of section area in intake canal from its beginning point to its changing point to ordinary flow section, m: coefficient concerning the mean width of intak canal site,a : freeboard of intake canal. (2) The conditional equations of the economical intake water depth in case that weir body is built on the foundation of rock bed ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { nkp}_{5 }}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0 }}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{6 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{2 }m' SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0}}}} The construction cost of weir cut-off and revetment on outside slope of leeve, and the damages suffered from inundation in upstream area were not included in the process of deriving the above conditional equations, but it is true that magnitude of intake water depth influences somewhat on the cost and damages. Therefore, in applying the above equations the fact that should not be over looked is that the design value of intake water depth to be adopted should not be more largely determined than the value of h1 satisfying the above formulas.

  • PDF

기가비트 이더넷 스위치에서 빠른 MAC 주소 테이블의 검색 방법 (Practical MAC address table lookup scheme for gigabit ethernet switch)

  • 이승왕;박인철
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 1998년도 추계종합학술대회 논문집
    • /
    • pp.799-802
    • /
    • 1998
  • As we know, gigabit ethernet is a new technology to be substituted for current fast ethernet used widely in local area network. The switch used in gigabit ethernet should deal with frames in giga-bps. To do such a fast switching, we need that serveral processes meet the budgets, such as MAC address table lookup, several giga speed path setup, fast scheduling, and etc. Especially MAC address table lookup has to be processed in the same speed with speed of incoming packets, thus the bottleneck in the process can cause packet loss by the overflow in the input buffer. We devise new practical hardware hashing method to perform fast table lookup by minimizing the number of external memory access and accelerating with hardware.

  • PDF

IEEE 부동 소수점 덧셈/뺄셈 연산에서 효율적인 반올림 알고리즘과 구현 (Efficient Rounding Algorithm and Implementation for IEEE Floating Point Addition/Subtraction)

  • 김병화;안현식;김도현
    • 전자공학회논문지B
    • /
    • 제32B권3호
    • /
    • pp.24-30
    • /
    • 1995
  • The process of conventional floating-point additio $n_traction operation consists of alignment, additio $n_traction, normalization, and rounding stage. Because rounding stage needs an incrementor or adder, it occupies much time and chip area. In addition, it needs additional time and hardware for renormalization which occurs in overflow due to rounding In this paper, floating-point adde $r_tractor performing rounding and additio $n_traction in parallel is presented by using the feature of additio $n_traction and carry select adder used in additio $n_tracting stage. Proposed floating point adde $r_tractor doesn't need time and incrementor nor adder for rounding. Also, renormalization doesn't occur since rounding is performed prior to normalization.to normalization.

  • PDF

수도쿠 퍼즐을 통해서 살펴본 SAT에서 전처리 효과 (Effect on Preprocessing in SAT with Sudoku Puzzle)

  • 권기현
    • 한국IT서비스학회지
    • /
    • 제7권2호
    • /
    • pp.127-135
    • /
    • 2008
  • The concept of preprocessing is widely used in various computer science area such as compiler and software engineering for the purpose of macro processing and optimization. In addition, preprocessing is also used in SAT solvers in order to eliminate redundant literals and clauses to speed up its solving time before searching the state space. However, there is an unexpected run-time error such as stack-overflow during this step, in case the size of a given set of clauses is huge which impedes SAT solvers. In this case, the preprocessing should be applied at the encoding time to optimize its size. In this paper this idea is applied to several Sudoku problems. As a result, significant improvements are obtained with respect to the number of variables and clauses as well as the solving time compared to the previous works.

용담호소 내 Chlorophyl-a와 유기물 저감을 위한 부상기법 적용 연구 (A Study for Application of DAF Technology to Remove Chrolophyl-a and Dissolved Organic Compound in Yongdam Reservoir)

  • 독고석;이형집
    • 상하수도학회지
    • /
    • 제20권2호
    • /
    • pp.303-309
    • /
    • 2006
  • Yongdam reservoir located in Jeoliabuk-do has had a lot of concerns for its algal blooming since it has started to fill water. Many water utilities near Yongdam area use reservoirs even though they have some problems with certain algae that cause tastes and odors and clog filters. In this research, dissolved air flotation (DAF) technology was examined for feasibility for removal of algae. OAF can save the capital cost for its compactness, because its hydraulic loadings (overflow rates) are 10 times higher than sedimentation, and hydraulic detention times are much shorter, typically 5 to 15 minutes. As a result of this research, PAC is effective rather than Alum to DAF for pretreatment. Higher DOC plays an important role to change zetapotential negatively to inhibit destabilization of particle to coagulation. The length of pipeline to carry pressurized water into reactor does not affect reaction.