• 제목/요약/키워드: Outage cost assessment

검색결과 21건 처리시간 0.028초

전력에너지 공급지장비의 충격도지수 함수개발 및 WOROCAIS를 이용한 이의 추정에 관한 연구 (Development of Outage Cost Impact Index Function of Electricity Energy and Outage Cost Assessment using WOROCAIS)

  • 임진택;최재석;전동훈;서철수;이재걸
    • 전기학회논문지
    • /
    • 제62권8호
    • /
    • pp.1066-1073
    • /
    • 2013
  • This paper illustrates newly an outage cost impact index function(OCIIF). The assessment of the OCIIF is described using the Web Based Online Real-time Outage Cost Assessment and Information System(WOROCAIS) for power system outage cost assessment in Korea. The proposed OCIIF is not absolute but relative outage cost impact index function in view point of outage time using web based survey method for outage cost assessment. While conventional methodology does not consider short time outage cost assessment, the proposed OCIIF reflects short time outage. SCOF(Sector Customer Outage Function) in stead of the traditional SCDF(Sector Customer Damage Function) is defined and proposed newly in this paper. Based the SCOF, AVLL(Average Value of Loss Load) is newly proposed. The OCIIF is demonstrated by WOROCAIS in case study around 2,000 sample data surveyed by KEPCO in South Korea in recent.

웹기반 온라인 전기에너지 공급지장비 추정 및 정보 시스템의 개발 (Web based Online Outage Cost Assessment and Information System of Electrical Energy)

  • 임진택;최재석;전동훈;서철수;이재걸
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1249-1259
    • /
    • 2012
  • This paper proposes a Web Based Online Outage Cost Assessment and Information System(WOOCAIS) for power system outage cost assessment. The proposed WOOCAIS is a kind of web based survey method for outage cost assessment. While conventional survey methods have done outage cost assessment based on survey paper lists collected by post mail or visiting customers, the proposed WOOCAIS is a web based online survey operation and assessment system. Therefore, it can curtail expenditure for survey and also is more convenient than conventional method. It will be set up for actual outage cost assessment system of KEPCO in South Korea in the near future. The WOOCAIS will be applied in various research and actual planning and operation areas. First of all, the assessed results may be not only applied as one of objective function for generation system and grid expansion but also operational planning problems in power system.

거시적인 접근방법을 통한 공급지장비 추정에 관한 연구 (A Study on the Outage Cost Assessment by using Macro Approach)

  • 박영신;전동훈;박정제;오태곤;조경희;최재석
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1703-1711
    • /
    • 2010
  • Electric power utilities are facing increasing uncertainties regarding the economic, political, societal, environmental constraints under they operate and plan their future systems. The utilities have to integrate consumers' interruption cost representing reliability worth of electricity into the process of determining the optimum investment level. In order to do so, the estimated outage cost must be included into quantitative index corresponding to system capital and operation investment cost to establish an optimal expansion plan. This paper is a study on the outage cost assessment by using macro approach for calculating IEAR(Interrupted Energy Assessment Rates) and the TRELSS(Transmission Reliability Evaluation for Large-Scale Systems) program was used to calculate EENS(Expected Energy Not Served).

복합전력계통의 유효부하지속곡선을 이용한 신뢰도 평가 및 공급지장비 추정 (The Reliability Evaluation and Outage Cost Assessment of Composite Power System)

  • 문승필;김홍식;장순용;최재석;강진중;조종만
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1033-1035
    • /
    • 1998
  • This paper presents a new analytical method for assessing outage cost of composite power system with considering transmission system uncertainty. Composite power system ELDC(CMELDC) was developed and proposed from reliability evaluation of composite power system in order to analysis the outage cost on HLII. In this study, considering the characteristic of each load point, the CMELDC was used for outage cost assessment and reliability evaluation at each load point. The characteristics and effectiveness of this methodology are illustrated by the case study (IEEE-RTS 24Buses).

  • PDF

계통계획 수위용 공급지장비의 추정방법 및 이의 응용에 관한 연구 (A Study on the Assessment and Application of Outage Cost for Power System Expansion Planning)

  • 최재석;강성록;트룬틴트란;김호용;김슬기
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권5호
    • /
    • pp.285-295
    • /
    • 2004
  • The outage cost assessment has an important position for determination of the optimal level or optimal range of reliability for power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. While the utility cost(reliability cost) will generally increase as consumers are provided with higher reliability, the consumer costs(reliability worth) associated with supply interruptions will decrease as the reliability increases. The total costs to society are the sum of these two individual costs and the optimum or target level of reliability is achieved at minimum point of the total cost curve. This paper addresses the role, need and assessment algorithms and methodologies of the outage cost in power system expansion planning. In a case study, the outage cost has been assessed using macro approach for our country 15years(1986-200l) in the case study. Additionally, determination processing of optimum reliability level is presented in another case study with the five buses MRBTS.

송전계통계획 수립용 공급지장비의 추정에 관한 연구 (A Study on the Outage Cost Assessment for Transmission System Expansion Planning)

  • 이영진;강성록;최재석;김호용;김슬기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.479-483
    • /
    • 2003
  • The outage cost has very important position for determination of the optimal level or optimal range of reliability in power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. This paper suggests strategies for the role, need and assessment algorithm and methodology of the outage cost in power system expansion planning. Organization, data collections and method about D/B for outage cost assessment is proposed in the this study.

  • PDF

부하지점별 공급지장비추정을 위한 수치해석적 방법의 개발 (Development of a Numerical Analysis Method for the Outage Cost Assessment at Load Points)

  • 최재석;김홍식;문승필;강진중;김호용;박동욱
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권11호
    • /
    • pp.549-557
    • /
    • 2000
  • This study proposes a new numerical analysis method for assessing the outage cost of the composite power system with considering transmission system at load points. The proposed method comes from combination of the expected energy not served curve(EENSC) with the marginal outage cost function obtained at load points. Uncertainty of the outages of the generation and transmission systems was also included in this study. This study can be categorized into three processing parts as like as follows. Firstly, EENSC at load points was developed newly from the composite power system effective load duration curve which has been proposed by the authors. Secondly, this study proposes a new technical method for determining the coefficients of the marginal outage cost functions at load points in the composite power system(Generation and Transmission systems). It is a main key point that the mathematical expression for the marginal outage cost function at a load point is formulated and evaluated using relations between the GNP (or GDP) and the electrical energy demand at the load pint. Finally, the outage cost was calculated in this paper by combining the proposed EENSC with the marginal outage cost function evaluated at each load point. It is another important feature that the average costs for future at load points can be forescasted using the proposed approach. The effectiveness of the proposed new approach is demonstrated by the case studies with the IEEE-RTS.

  • PDF

각 부하지점별 유효부하지속곡선 작성법에 관한 연구 (A Study on Construction of the CMELDC at Load Points)

  • 김홍식;문승필;최재석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권4호
    • /
    • pp.195-198
    • /
    • 2000
  • This paper illustrates a new method for constructing composite power system effective load duration curve(CMELDC) at load points. The main concept of proposed method is that the CMELDC can be obtain from convolution integral processing of the outage probabilistic distribution function of not supplied power and the load duration curve given at each load point. The effective load duration curve (ELDC) at HLI plays an important part in probabilistic production simulation, reliability evaluation, outage cost assessment and power supply margins assesment for power system planning and operation. And also, the CMELDC at HLII will extend the application areas of outage cost assessment and reliability evaluation at each load point. The CMELDC at load points using the Monte Carlo method and a DC load flow constrained LP have already been developed by authors. The effective load concept at HLII, however, has not been introduced sufficiently in last paper although the concept is important. In this paper, the main concept of the effective load at HLII which is proposed in this study is defined in details as the summation of the original load and the probabilistic loads caused by the forced outage of generators and transmission lines at this load point. The outage capacity probabilistic distribution function at HLII can be obtained by combining the not supplied powers and the probabilities of the not supplied powers at this load point. It si also expected that the proposed CMELDC can be applied usefully to research areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. at HLII in future. The characteristics and effectiveness of this methodology are illustrated by case study of IEEE-RTS.

  • PDF

TRELSS를 이용한 KEPCO 계통의 공급지장비 추정연구 (Area Annual Outage Cost Assessment of KEPCO System by TRELSS)

  • 사박;정상헌;박정제;최재석;전동훈;윤용범;장병훈;문승필;한경남
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.578-579
    • /
    • 2007
  • The importance and necessity of conducting studies on area outage cost assessment have been increasingly important in recent years due to the competitive electricity market environment. The objective of operational issues would be to minimize the total area cost while satisfying all associated system constrains of each area[2]. This paper presents a methodology of the Area annual outage cost assessment by probabilistic reliability evaluation using TRELSS program for KEPCO system. The interrupted energy assessment rate (IEAR) is evaluated by macro approach that is using relations between GRDP and the electrical energy demand. The Expected Energy Not Supplied (EENS) of each area was evaluated using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper.

  • PDF

거시적 접근법에 의한 계통계획 수립용 공급지장비의 추정 (Assement of Outage Cost Using Macro Approach for Power System Expansion Planning)

  • 이지훈;강성록;최재석;김호용;김슬기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.139-141
    • /
    • 2003
  • The outage cost has very important position for determination of the optimal level or optimal range of reliability in power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. This paper addresses the role, need and assessment algorithm and methodology of the outage cost on power system expansion planning. Furthermore outage cost has been assessed using macro approach for our country 15years(1986-2001) in the case study.

  • PDF