The outage cost assessment has an important position for determination of the optimal level or optimal range of reliability for power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. While the utility cost(reliability cost) will generally increase as consumers are provided with higher reliability, the consumer costs(reliability worth) associated with supply interruptions will decrease as the reliability increases. The total costs to society are the sum of these two individual costs and the optimum or target level of reliability is achieved at minimum point of the total cost curve. This paper addresses the role, need and assessment algorithms and methodologies of the outage cost in power system expansion planning. In a case study, the outage cost has been assessed using macro approach for our country 15years(1986-200l) in the case study. Additionally, determination processing of optimum reliability level is presented in another case study with the five buses MRBTS.
본 논문은 민자발전소의 회피 발전비용을 계산하는 새로운 방법을 제안하였다. 제안된 방법은 기존의 부하감소법과 달리 민자발전소의 고장정지율과 경제적 투입순서를 정확히 고려할 수가 있다. 그러므로 더욱 정확한 회피 발전비용을 계산할 수가 있다. 또한 확률적 시뮬레이션을 수행하여 계산하므로 민자발전소의 비용에 대한 영향도 정확히 고려할 수가 있다. 부가적으로 한 개 이상의 민자발전소가 참여하였을 때에 회피 발전비용을 할당하는 방법도 제안하였다. 다양한 사례연구를 통해 제안한 방법의 결과를 분석하였다.
Reliability differentiated pricing (RDP) is known to improve the efficiency and benefits of consumers and producers. Outage costs representing the economic and non-economic consequences of service curtailments to customers can be used as an effective parameter of RDP in electricity markets. This paper examines the theoretical aspects of an RDP scheme, and derives the optimal decisions of consumers and electric utilities for long-term transactions. The proposed RDP is demonstrated through a case study on a wheeling service.
Power system outages can lead to huge economic losses for various industries. Jeju island power system outage in 2006 also caused significant social and economic impacts in Korea. There have been numerous attempts to evaluate the economic costs of power system outages. Power system outages can also have financial impacts on electric power industry. This paper attempts to analyze the economic impacts of the 2006 Jeju island power system outage on the values of the firms in the power industry using event study. Empirical analysis results are presented to show the economic impacts of the 2006 Jeju island outage on the values of the firms in the power industry.
This study proposes a new numerical analysis method for assessing the outage cost of the composite power system with considering transmission system at load points. The proposed method comes from combination of the expected energy not served curve(EENSC) with the marginal outage cost function obtained at load points. Uncertainty of the outages of the generation and transmission systems was also included in this study. This study can be categorized into three processing parts as like as follows. Firstly, EENSC at load points was developed newly from the composite power system effective load duration curve which has been proposed by the authors. Secondly, this study proposes a new technical method for determining the coefficients of the marginal outage cost functions at load points in the composite power system(Generation and Transmission systems). It is a main key point that the mathematical expression for the marginal outage cost function at a load point is formulated and evaluated using relations between the GNP (or GDP) and the electrical energy demand at the load pint. Finally, the outage cost was calculated in this paper by combining the proposed EENSC with the marginal outage cost function evaluated at each load point. It is another important feature that the average costs for future at load points can be forescasted using the proposed approach. The effectiveness of the proposed new approach is demonstrated by the case studies with the IEEE-RTS.
It is known that Reliability Differentiated Pricing (RDP) can improve the efficiency and benefits of consumers and producers. This paper examines the long-run social welfare maximization problem of the utility and presents a long-term reliability differentiated prices for firm capacity, based on customer outage costs. Then the applicability of the proposed pricing scheme is verified with a case study.
The efficient and rational transmission tariff structure is one of the crucial factors in creation of fair and competitive electricity markets. Transmission charge can be largely categorized into the line usage charge, system reliability charge, access charge and others. Any transmission tariff should be able to reflect these cost components reasonably. This paper suggests an approach amenable to allocating the transmission reliability costs reasonably with reflection of line sensitivity and line outage rate.
As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.
This paper examines the long-run social welfare maximization problems facing public utilities, which includes consideration of the cost of capital or other fixed costs of production, from which it derives optimal investment decisions in a reliability differentiated pricing based market. Reliability differentiated pricing policies lead to straightforward mathematical results on optimal investment decisions in generation and transmission expansion planning. This paper presents the mathematical conditions for optimal investment decisions.
South Korea is recently under serious situation in supplying electricity with enough power reserve. A single fault of power plant at a peak-load time may lead to a total blackout for whole area connected by a single electric grid and isolated from other grids. Despite of the seriousness of blackout, however, there are scarce studies with ex-ante analysis of the economic costs from blackout. In order to evocate the seriousness, we calculate the economic costs for both industrial and household sectors with using some survey data and statistical methodologies. As a result, total economic costs are 39.23 trillion KRW (35.83 trillion KRW for industrial sector, 3.40 trillion KRW for household sector).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.