• Title/Summary/Keyword: Optimum replacement time

Search Result 46, Processing Time 0.03 seconds

An Optimum Maintenance Policy : A bayesian approach to periodic incomplete preventive maintenance with minimal repair at failure

  • Park, Kwang-Su;Jun, Chi-Hyuck
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.193-196
    • /
    • 1997
  • In this paper we consider a Bayesian theoretic approach to periodic incomplete preventive maintenance with minimal repair at failure. We assume that the system failure rate is increasing as the frequency of PM increases and that the system is replaced at the K-th PM under this maintenance strategy. The optimal policies which minimize the expected cost rates are discussed. We seek the optimal periodic PM interval x and replacement time K under a Weibull failure intensity. Assuming suitable prior distribution for the Weibull parameters, we derive the posterior distribution incorporating failure data and obtain the updated optimal replacement strategies.

  • PDF

The Basic Study on the Spun Concrete Pipes using Blast-Furnace Slag Powder (고로슬래그 미분말을 사용한 콘크리트 흄관에 대한 기초적 연구)

  • 조영근;김승진;박유신;성기웅;손진군
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.939-944
    • /
    • 2000
  • This study examines both strength development and pore volume of high temperature curing mortar, using a blast-furnace slag powder (BFS). This study experiments with various pre-steaming period, differing curing temperature and the replacement of BFS. According to the results, the strength development of BFS mortar is stronger when higher curing temperature are used(as opposed to standard curing). Also, regardless of the curing method, pore volume decreases as the curing time increases. From these results we can identify the optimum conditions required pre-steaming period, differing curing temperature and the replacement to produce BFS mortar properties.

Adsorption Treatment of Petroleum Oil on Aqueous Phase (수용액중에 함유된 석유화합물들의 흡착처리에 관한 연구)

  • Lee, T.H.;Son, B.C.;Lee, S.B.;Kim, l.H.
    • Analytical Science and Technology
    • /
    • v.5 no.1
    • /
    • pp.1-5
    • /
    • 1992
  • The adsorption amount of petroleum oil on XAD-4, XAD-7 and replacement adsorbents as rice bran, rice straw and sawdust were studied by using batch method measured in the optimum adsorption condition. The adsorption capacity of rice bran and rice straw of petroleum oil were excellent as well as adsorption ability about 50% of XAD resins and adsorption capacity of their replacement adsorbents were increased with optimum condition that pyrolysis time was 30 min. at $200^{\circ}C$. Adsorption ability of sawdust was very weak on the 30% MeOH aqueous medium but adsorption ability was range of about 50% of XAD resin's adsorption capacity on the 0.5M NaCl aqueous medium. Adsorption ability of rice bran and rice straw showed the same adsorption capacity even if difference external structure. Therefore, showing that rice bran and rice straw were have to good adsorption ability as replacement adsorbent for XAD resins.

  • PDF

Failure Data Analysis of J79 Engine Transfer Gearbox for Aircraft Maintenance Planning (항공기 정비계획을 위한 J79 엔진 Transfer Gearbox의 고장데이터 분석)

  • Choi, Jae-Man;Yang, Seung-Hyo;Hwang, Young-Ha;Son, Ik-Sang;On, Yong-Sub;Kim, Young-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.6
    • /
    • pp.781-787
    • /
    • 2010
  • Forecasting possible failure characteristics is very important in maintenance planning because it helps in predicting any future failures and determining the optimum replacement interval. This paper examines the time.to-failure distribution of the transfer gearbox of a J79 engine by using a probability plotting technique which is one of the most convenient techniques for reliability analysis. Various probability distributions are evaluated for determining the suitable probability distribution of the failure data of the transfer gearbox, and the resulting correlation coefficient indicates that failure data have a lognormal distribution. The expected number of unscheduled maintenance actions and the optimum replacement interval for various values of cost ratios are determined.

A Study on the Optimum Mix Proportion of the Mass Concrete Designed as Massive and Deep Structure

  • Kwon Yeong-Ho;Lee Hwa-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.2 s.86
    • /
    • pp.293-302
    • /
    • 2005
  • This study describes data from determination of the optimum mix proportion and site application of the mass concrete placed in bottom slab and side wall having a large depth and section as main structures of LNG in-ground tank. This concrete requires low heat hydration, excellent balance between workability and consistency because concreting work of LNG in-ground tank is usually classified by under-pumping, adaptation of longer vertical and horizontal pumping line than ordinary pumping condition. For this purpose, low heat Portland cement and lime stone powder as cementitious materials are selected and design factors including unit cement and water content, water-binder ratio, fine aggregate ratio and adiabatic temperature rising are tested in the laboratory and batch plant. As experimental results, the optimum unit cement and water content are selected under $270kg/m^3$ and $l55{\~}l60 kg/m^3$ separately to control adiabatic temperature rising below $30^{\circ}C$ and to improve properties of the fresh and hardened concrete. Also, considering test results of the confined water ratio($\beta$p) and deformable coefficient(Ep), $30\%$ of lime stone powder by cement weight is selected as the optimum replacement ratio. After mix proportions of 5cases are tested and compared the adiabatic temperature rising($Q^{\infty}$, r), tensile and compressive strength, modulus of elasticity, teases satisfied with the required performances are chosen as the optimum mix design proportions of the side wall and bottom slab concrete. $Q^{\infty}$ and r are proved smaller than those of another project. Before application in the site, properties of the fresh concrete and actual mixing time by its ampere load are checked in the batch plant. Based on the results of this study, the optimum mix proportions of the massive concrete are applied successfully to the bottom slab and side wall in LNG in-ground tank.

Mechanical behaviour of waste powdered tiles and Portland cement treated soft clay

  • Al-Bared, Mohammed A.M.;Harahap, Indra S.H.;Marto, Aminaton;Abad, Seyed Vahid Alavi Nezhad Khalil;Mustaffa, Zahiraniza;Ali, Montasir O.A.
    • Geomechanics and Engineering
    • /
    • v.19 no.1
    • /
    • pp.37-47
    • /
    • 2019
  • The main objective of this study is to evaluate and compare the efficiency of ordinary Portland cement (OPC) in enhancing the unconfined compressive strength of soft soil alone and soft soil mixed with recycled tiles. The recycled tiles have been used to treat soft soil in a previous research by Al-Bared et al. (2019) and the results showed significant improvement, but the improved strength value was for samples treated with low cement content (2%). Hence, OPC is added alone in this research in various proportions and together with the optimum value of recycled tiles in order to investigate the improvement in the strength. The results of the compaction tests of the soft soil treated with recycled tiles and 2, 4, and 6% OPC revealed an increment in the maximum dry density and a decrement in the optimum moisture content. The optimum value of OPC was found to be 6%, at which the strength was the highest for both samples treated with OPC alone and samples treated with OPC and 20% recycled tiles. Under similar curing time, the strength of samples treated with recycled tiles and OPC was higher than the treated soil with the same percentage of OPC alone. The stress-strain curves showed ductile plastic behaviour for the untreated soft clay and brittle behaviour for almost all treated samples with OPC alone and OPC with recycled tiles. The microstructural tests indicated the formation of new cementitious products that were responsible for the improvement of the strength, such as calcium aluminium silicate hydrate. This research promotes recycled tiles as a green stabiliser for soil stabilisation capable of reducing the amount of OPC required for ground improvement. The replacement of OPC with recycled tiles resulted in higher strength compared to the control mix and this achievement may results in reducing both OPC in soil stabilisation and the disposal of recycled tiles into landfills.

Fundamental Properties of Self-Compacting Concrete Using Viscosity Modifying Admixture (증점제를 사용한 고유동콘크리트의 기초 물성)

  • 김진철;안태송;문한영
    • Journal of the Korea Concrete Institute
    • /
    • v.11 no.6
    • /
    • pp.69-78
    • /
    • 1999
  • Hydroxyethyl cellulose -based-viscosity modifying admixture and melamine-basd-superplasticizer were selected to be admixtures for self-compacting concrete based on the test results of fluidity and air content of mortar using 3 different viscosity modifying admixtures. The experimental results show that the initial and final set of self-compacting concrete and fly ash concrete with viscosity modifying admixture only have been delayed approximately 5 hours and 8~9 hours, respectively. It is found that the optimum dosage of viscosity modifying admixtures, coarse aggregate and cement content are 0.2% of water content, under 742 kg/$\textrm{m}^3$ and over 364 kg/$\textrm{m}^3$, respectively. Test results also show that the optimum fly ash in replacement of cement is 10% of cement weight for the enhancement of fluidity and long-term strength.

Lifetime Reliability Analysis of Irrigation System (관개조직의 수명기간 신뢰성 해석)

  • Kim Han-Joong;Lee Jeong-Jae;Im Sang-Joon
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.2
    • /
    • pp.35-44
    • /
    • 2003
  • A system reliability method is proposed to decide reliable serviceability of agricultural irrigation system. Even though reliability method is applied to real engineering situations involving actual life environments and maintaining costs, a number of Issues arise as a modeling and analysis level. This article use concepts that can be described the probability of failure with time variant and series-parallel system reliability analysis model. A proposed method use survivor function that can simulate a time-variant performance function for a lifetime before it is required essential maintenance or replacement to define a target probability of failure in agricultural irrigation canal. In the further study, it is required a relationship between a state of probability of failure and current serviceability to make the optimum repair strategy to maintain appropriate serviceability of an irrigation system.

Methodology for Variable Optimization in Injection Molding Process (사출 성형 공정에서의 변수 최적화 방법론)

  • Jung, Young Jin;Kang, Tae Ho;Park, Jeong In;Cho, Joong Yeon;Hong, Ji Soo;Kang, Sung Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.52 no.1
    • /
    • pp.43-56
    • /
    • 2024
  • Purpose: The injection molding process, crucial for plastic shaping, encounters difficulties in sustaining product quality when replacing injection machines. Variations in machine types and outputs between different production lines or factories increase the risk of quality deterioration. In response, the study aims to develop a system that optimally adjusts conditions during the replacement of injection machines linked to molds. Methods: Utilizing a dataset of 12 injection process variables and 52 corresponding sensor variables, a predictive model is crafted using Decision Tree, Random Forest, and XGBoost. Model evaluation is conducted using an 80% training data and a 20% test data split. The dependent variable, classified into five characteristics based on temperature and pressure, guides the prediction model. Bayesian optimization, integrated into the selected model, determines optimal values for process variables during the replacement of injection machines. The iterative convergence of sensor prediction values to the optimum range is visually confirmed, aligning them with the target range. Experimental results validate the proposed approach. Results: Post-experiment analysis indicates the superiority of the XGBoost model across all five characteristics, achieving a combined high performance of 0.81 and a Mean Absolute Error (MAE) of 0.77. The study introduces a method for optimizing initial conditions in the injection process during machine replacement, utilizing Bayesian optimization. This streamlined approach reduces both time and costs, thereby enhancing process efficiency. Conclusion: This research contributes practical insights to the optimization literature, offering valuable guidance for industries seeking streamlined and cost-effective methods for machine replacement in injection molding.

Using System Reliability to Evaluate and Maintain Structural Systems

  • Estes, Allen C.;Frangopol, Dan M.
    • Computational Structural Engineering : An International Journal
    • /
    • v.1 no.1
    • /
    • pp.71-80
    • /
    • 2001
  • A reliability approach to evaluate structural performance has gained increased acceptability and usage over the past two decades. Most reliability analyses are based on the reliability of an individual component without examining the entire structural system. These analyses often result in either unnecessary repairs or unsafe structures. This study uses examples of series, parallel, and series-parallel models of structural systems to illustrate how the component reliabilities affect the reliability of the entire system. The component-system reliability interaction can be used to develop optimum lifetime inspection and repair strategies for structural systems. These examples demonstrate that such strategies must be based on the reliability of the entire structural system. They also demonstrate that the location of an individual component in the system has a profound effect on the acceptable reliability of that component. Furthermore, when a structure is deteriorating over time, the reliability importance of various components is a1so changing with time. For this reason, the most critical component in the early life of the structure may not tie the most critical later.

  • PDF