• Title/Summary/Keyword: Optimal control period

Search Result 371, Processing Time 0.025 seconds

Design of Controller for Reducing In-Rush Current of Single-Phase Induction Motor (단상유도전동기의 돌입전류저감을 위한 제어기 설계)

  • Park, Su-Kang;Baek, Hyung-Lae;Lee, Sang-Il
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.5
    • /
    • pp.238-245
    • /
    • 2001
  • During an AC motor's start-up accelerating period, a large amount of current is required to reach to the rating speed. This is called in-rush current. This peak in-rush current can be more than about several times the operating or steady-state current in the full load rating of the motor. In-rush current is present in both and electronic ballasts. The main area of concern is the tripping of circuit breaker and fuses which can affect electrical system components From this, we can see that the electrical power controllers will be rather concerned, since they have to supply the actual current necessary to start the motor. This paper presents a new method to reducing in-rush current and energy saving of the single-phase induction motor used in air-conditioner. It can be obtained that proposed system is low cost and small size as compared with other controller. Experiments are focused on a capacitor starting single-phase induction motor. The optimal power saving and in-rush current limiting by phase angle control are verified by experimental results. Also, auxiliary winding was controlled by electronic starting switch.

  • PDF

The Effect of Auricular Acupuncture Therapy on Blood Pressure (이침시술이 혈압에 미치는 영향)

  • 이진구;이영구;윤희식
    • The Journal of Korean Medicine
    • /
    • v.24 no.2
    • /
    • pp.12-18
    • /
    • 2003
  • Objectives : Hypertension is very prevalent disease, and causes serious cardiovascular complications. Nowadays optimal hypertension treatment is emphasized to reduce the incidence of cardiovascular complications. Auricular acupuncture therapy is economical, safe and effective. Its clinical application is various, and it can be used to control blood pressure. So The effect of auricular acupuncture therapy was investigated. Daily variation of blood pressure during needle-embedded period and variation of blood pressure by blood pressure classification were observed. Methods : The auricular acupuncture points we used were Gangapjeom (降壓點), Sinmun (神門), Gyogam (交感), Sim(心), and Icheom (耳尖). Auricular acupuncture needles were embedded for three days. Blood pressure was checked four times per day and the mean obtained. Results : The following results were obtained : 1. During needle-embedded period, systolic and diastolic blood pressure decreased. Blood pressure decreased most significantly 2 days after treatment. 2. The change of blood pressure in the higher blood pressure group was more remarkable than that of the lower blood pressure group. Conclusions : Through this research, auricular acupuncture therapy is considered as an effective and safe method to lower blood pressure.

  • PDF

Optimal Policy for (s, S) Inventory System Characterized by Renewal Arrival Process of Demand through Simulation Sensitivity Analysis (수요가 재생 도착과정을 따르는 (s, S) 재고 시스템에서 시뮬레이션 민감도 분석을 이용한 최적 전략)

  • 권치명
    • Journal of the Korea Society for Simulation
    • /
    • v.12 no.3
    • /
    • pp.31-40
    • /
    • 2003
  • This paper studies an optimal policy for a certain class of (s, S) inventory control systems, where the demands are characterized by the renewal arrival process. To minimize the average cost over a simulation period, we apply a stochastic optimization algorithm which uses the gradients of parameters, s and S. We obtain the gradients of objective function with respect to ordering amount S and reorder point s via a combined perturbation method. This method uses the infinitesimal perturbation analysis and the smoothed perturbation analysis alternatively according to occurrences of ordering event changes. The optimal estimates of s and S from our simulation results are quite accurate. We consider that this may be due to the estimated gradients of little noise from the regenerative system simulation, and their effect on search procedure when we apply the stochastic optimization algorithm. The directions for future study stemming from this research pertain to extension to the more general inventory system with regard to demand distribution, backlogging policy, lead time, and inter-arrival times of demands. Another direction involves the efficiency of stochastic optimization algorithm related to searching procedure for an improving point of (s, S).

  • PDF

Performance tests on the ANN model prediction accuracy for cooling load of buildings during the setback period (셋백기간 중 건물 냉방시스템 부하 예측을 위한 인공신경망모델 성능 평가)

  • Park, Bo Rang;Choi, Eunji;Moon, Jin Woo
    • KIEAE Journal
    • /
    • v.17 no.4
    • /
    • pp.83-88
    • /
    • 2017
  • Purpose: The objective of this study is to develop a predictive model for calculating the amount of cooling load for the different setback temperatures during the setback period. An artificial neural network (ANN) is applied as a predictive model. The predictive model is designed to be employed in the control algorithm, in which the amount of cooling load for the different setback temperature is compared and works as a determinant for finding the most energy-efficient optimal setback temperature. Method: Three major steps were conducted for proposing the ANN-based predictive model - i) initial model development, ii) model optimization, and iii) performance evaluation. Result:The proposed model proved its prediction accuracy with the lower coefficient of variation of the root mean square errors (CVRMSEs) of the simulated results (Mi) and the predicted results (Si) under generally accepted levels. In conclusion, the ANN model presented its applicability to the thermal control algorithm for setting up the most energy-efficient setback temperature.

Model Predictive Torque Control of Surface Mounted Permanent Magnet Synchronous Motor Drives with Voltage Cost Functions

  • Zhang, Xiaoguang;Hou, Benshuai;He, Yikang;Gao, Dawei
    • Journal of Power Electronics
    • /
    • v.18 no.5
    • /
    • pp.1369-1379
    • /
    • 2018
  • In this paper, a model predictive torque control (MPTC) without the use of a weighting factor for surface mounted permanent-magnet synchronous machine (SPMSM) drive systems is presented. Firstly, the desired voltage vector is predicted in real time according to the principles of deadbeat torque and flux control. Then the sector of this desired voltage vector is determined. The complete enumeration for testing all of the feasible voltage vectors is avoided by testing only the candidate vectors contained in the sector. This means that only two voltage vectors in the sector need to be tested for selecting the optimal voltage vector in each control period. Thus, the calculation time can be reduced when compared with the conventional enumeration method. On the other hand, a novel cost function that only includes the dq-axis voltage errors between the desired voltage and candidate voltage is designed to eliminate the weighting factor used in the conventional MPTC. Thus, the control complexity caused by the tuning of the weighting factor is effectively decreased when compared with the conventional MPTC. Simulation and experimental investigation have been carried out to verify the proposed method.

Predictive Current Control for Multilevel Cascaded H-Bridge Inverters Based on a Deadbeat Solution

  • Qi, Chen;Tu, Pengfei;Wang, Peng;Zagrodnik, Michael
    • Journal of Power Electronics
    • /
    • v.17 no.1
    • /
    • pp.76-87
    • /
    • 2017
  • Finite-set predictive current control (FS-PCC) is advantageous for power converters due to its high dynamic performance and has received increasing interest in multilevel inverters. Among multilevel inverter topologies, the cascaded H-bridge (CHB) inverter is popular and mature in the industry. However, a main drawback of FS-PCC is its large computational burden, especially for the application of CHB inverters. In this paper, an FS-PCC method based on a deadbeat solution for three-phase zero-common-mode-voltage CHB inverters is proposed. In the proposed method, an inverse model of the load is utilized to calculate the reference voltage based on the reference current. In addition, a cost function is directly expressed in the terms of the voltage errors. An optimal control actuation is selected by minimizing the cost function. In the proposed method, only three instead of all of the control actuations are used for the calculations in one sampling period. This leads to a significant reduction in computations. The proposed method is tested on a three-phase 5-level CHB inverter. Simulation and experimental results show a very similar and comparable control performance from the proposed method compared with the traditional FS-PCC method which evaluates the cost function for all of the control actuations.

A Period Assignment Algorithm for Real-Time System Design (실시간 시스템 설계를 위한 주기 할당 알고리즘)

  • Ryu, Min-Soo;Hong, Seong-Soo
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.27 no.1
    • /
    • pp.61-67
    • /
    • 2000
  • Digital controllers found in many industrial real-time systems consist of a number of interacting periodic tasks. To sustain the required control quality, these tasks possess the maximum activation periods as performance constraints. An essential step in developing a real-time system is thus to assign each of these tasks a constant period such that the maximum activation requirements are met while the system utilization is minimized [1]. Given a task graph design allowing producer/consumer relationships among tasks [2], resource demands of tasks, and range constraints on periods, the period assignment problem falls into a class of nonlinear optimization problems. This paper proposes a ploynomial time approximation algorithm which produces a solution whose utilization does not exceed twice the optimal utilization. Our experimental analysis shows that the proposed algorithm finds solutions which are very close to the optimal ones in most cases of practical interest.

  • PDF

Biodegradable Film Decomposition Levels and Their Effects on Growth and Yield of Corn Crops

  • Ye Geon Kim;Hyun Hwa Park;Do Jin Lee;Yong In Kuk
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 2022.10a
    • /
    • pp.52-52
    • /
    • 2022
  • Recently, PE (polyethylene) film has been used increasingly in com cultivation. However, PE films often cause soil and environment contamination. In order to reduce this problem, many researches have been carrying out studies on biodegradable films (BF) that are easily decomposed by soil microorganisms. Therefore, this study was conducted to determine which BF is optimal for growth and yield of com crops while also having the highest rates of film decomposition. BFs Farmsbio (Farm Hannong), Heulgro Film (Sejin Bio), Vonto Film (Eco-Hansung) as well as a selected PE film were used in this study. For the control, we used crops grown without any kind of mulching. Experimental fields were fertilized according to conventional cultivation methods, tilled, and then covered by either BF or PE. After 1 week, com (cv. MIBECK2ho) at the 3-leaf stage (16 days after seeding) was transplanted. Plant height was measured at 18 and 32 days after transplanting and heading stages. Yield components and yield were also measured at harvest. In addition, pH, EC, and decomposition and light transmittance levels of films were investigated during the experimental period. Daily average temperature, relative humidity and organic matter in soils were also measured during the experimental period. There was no significant difference in plant height, heading date, and silking between crops with BFs and PE, but the crops grown with BFs and PE films reached higher growth parameters in a shorter amount of time than the crops in the non-mulching control. Additionally, there were no significant differences in yield components such as length of ears, ear width, ear weight, and yield in crops that were grown using films or crops in the control plot. Light transmittance and decomposition levels of films generally increased with time after transplanting, and was highest in the Heulgro film than other BFs. Soil pH and organic matter in crops using BFs and PE films were significantly higher than in the control plot at 99 and 113 days after transplanting. In general, the EC contents in the control plot was lower than in crops using BFs and PE films. The average daily moisture in soil was higher when BFs and PE films were used than in the control plot. However, the daily average soil temperature was higher in crops using BFs and PE films than in the control plots at the beginning of the experimental period, but there was no consistent difference in soil temperature towards the later part of the experimental period. Therefore, the BFs used in this study were shown to be helpful without causing negative impacts on the growth and yield of com.

  • PDF

Evaluation of storage period of fresh ginseng for quality improvement of dried and red processed varieties

  • Zhang, Na;Huang, Xin;Guo, Yun-Long;Yue, Hao;Chen, Chang-Bao;Liu, Shu-Ying
    • Journal of Ginseng Research
    • /
    • v.46 no.2
    • /
    • pp.290-295
    • /
    • 2022
  • Background: Dried and red ginseng are well-known types of processed ginseng and are widely used as healthy food. The dried and red ginseng quality may vary with the storage period of raw ginseng. Therefore, herein, the effect of the storage period of fresh ginseng on processed ginseng quality was evaluated through multicomponent quantification with statistical analysis. Methods: A method based on ultrahigh performance liquid chromatography coupled to triple quadrupole mass spectrometry in multiple-reaction monitoring mode (UPLC-MRM-MS) was developed for quantitation of ginsenosides and oligosaccharides in dried and red ginseng. Principal component analysis and partial least squares discriminant analysis were conducted to evaluate the dynamic distributions of ginsenosides and oligosaccharides after different storage periods. Results: Eighteen PPD, PPT and OLE ginsenosides and nine reducing and nonreducing oligosaccharides were identified and quantified. With storage period extension, the ginsenoside content in the processed ginseng increased slightly in the first 2 weeks and decreased gradually in the following 9 weeks. The content of reducing oligosaccharides decreased continuously as storage time extending, while that of the nonreducing oligosaccharides increased. Chemical conversions occurred during storage, based on which potential chemical markers for the storage period evaluation of fresh ginseng were screened. Conclusion: According to ginsenoside and oligosaccharide distributions, it was found that the optimal storage period was 2 weeks and that the storage period of fresh ginseng should not exceed 4 weeks at 0 ℃. This study provides deep insights into the quality control of processed ginseng and comprehensive factors for storage of raw ginseng.

A Study on the Loop Detector System for Real-Time Traffic Adaptive Signal Control (실시간 교통신호제어를 위한 루프 검지기 체계 연구)

  • 이승환;이철기
    • Journal of Korean Society of Transportation
    • /
    • v.14 no.2
    • /
    • pp.59-88
    • /
    • 1996
  • This study has determined optimal type, and location of loop detector to measure accurately traffic condition influenced by traffic variation with real time. Optimal type of loop detector for through vehicle at stop bar was determined by confidences of occupancy period, and nonoccupancy period, and so appropriate detector type for application to real time traffic control system has been decided on special loop detector.

    shows types and winding methods of existing detector (num1) and special detector (num 7,8) determined. It is desired that optimal location of through loop detector should be installed within 50cm of stop bar owing to vehicle behavior. And optimal location of loop detector for left turn vehicle is determined by left turn vehicle behavior on stop bar. In the case of install only one loop, it is desirable that within 20cm of stop bar. Both the special loop (1.8 × 4.0m : num 1.7) and existing loop (1.8 × 1.8m : num1) would be suitable. A location standard aspects, while regarding as economic, existing loop (1.8 × 1.8m : num1) would be suitable. A location of the queue detector and the spillback prevention detector considering the link length, the pedestran crossing is be or not and the estimation range of queue. And if the link length is shorter than 250m, locations of queue detector and spillback protect detector must be considered in the respect of queue management.

  • PDF