• Title/Summary/Keyword: Optimal Operation Line

Search Result 212, Processing Time 0.031 seconds

Allocation Model of Container Yard for A TC Optimal Operation in Automated Container Terminal

  • Kim, Hwan-Seong;Nguyen, DuyAnh
    • Journal of Navigation and Port Research
    • /
    • v.32 no.9
    • /
    • pp.737-742
    • /
    • 2008
  • In this paper, we deal with an allocation model of vertical type container yard for minimizing the total ATC (Automated Transfer Crane) working time and the equivalence of ATC working load in each block on automated container terminal. Firstly, a layout of automated container terminal yard is shown The characteristic of equipment which work in the terminal and its basic assumption are given Next, an allocation model which concerns with minimizing the total working time and the equivalence of working load is proposed for effectiveness of ATC working in automated container terminal. Also, a weight values on critical function are suggested to adjust the critical values by evaluating the obtained allocation plan. For ATC allocation algorithm, we suggest a simple repeat algorithm for on-line terminal operation.

Development of the QOC Monitoring System in Downcoiler (권취기에서의 단차 회피 제어 감시 시스템)

  • 최용준;황원호;이영진;이민철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.955-958
    • /
    • 2003
  • Strip top mark is one of the major problem areas in hot strip coiling operation. The key for good coiling is having a precise detection instrument of strip head end and an understanding of QOC(quick open control) control algorithm and mechanism. Therefore, this study aims at developing QOC monitoring system that is useful for avoiding strip top mark at coiling process. In this study, strip movement between mandrel and unit roll(wrapper roll) was thoroughly studied using high speed camera. The monitoring system was developed to calculate QOC open time and to estimate optimal open time values for good coiling operation. Its performance has been proven by extensive field tests on downcoiler of #2 Hot Strip Mill Line in Pohang Works.

  • PDF

A Design Methodology on Signal Paths for Enhanced Signal Integrity of High-speed Communication System and a BIST Design for Backplane Boards Testing (고속 통신 시스템의 신호충실성 향상을 위한 선로 설계 방법론 및 Backplane Boards Testing를 위한 BIST 설계)

  • Jang, Jong-Gwon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.4
    • /
    • pp.1263-1270
    • /
    • 2000
  • The operation frequency of High-speed Communication System becomes very fast with the advanced technology of VLSI chips and system implementation. There may exist various types of noise sources degrading the signal integrity in this system. The present main system is made of backplane, so faults can be brought whenever a board is removed, replaced or added. This backplane boards testing is a very important process to verify the operation of system. firstly, we model the effects of the internal noises in the High-speed Communication System to the signal line and propose a new design method to minimize these effects. For the design methodology, we derive the characterization value for each mode land them construct the optimal simulation model. We compare the result of own proposing method with that fo the existing methods, through simulation and show that the quality of High-speed Communication System is significantly enhanced. Secondary our proposing BIST for the Backplane Boards Testing is designed to guarantee that there is no fault in the high-speed communication system.

  • PDF

A Study on the Bus-Tie Application of 154kV HTS-FCL in Korean Power System (실계통에서의 154kV HTS-FCL Bus-Tie 최적 적용방안에 관한 연구)

  • Kim Jong-Yul;Yoon Jae Young;Lee Seung Rvul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.5
    • /
    • pp.226-233
    • /
    • 2005
  • As the power demand has been increasing, a fault current problem is becoming more serious in real power system. Various ways like bus-split operation, transmission line open operation, are used in Korean power system for solving the problem. In this time, superconducting FCL(Fault Current Limiter) has been developed as a vary attractive alternative since HTS(High Temperature Superconductivity) was discovered. Korea, a project developing superconducting FCL to apply to 154kV transmission system is proceeding. Therefore, a power system analysis for SFCL application to power system is necessary, This paper presents the determination of quenching resistance and the selection of optimal cites when 154kV HTS-FCL is applied to Korean power system.

Mobile Crane Ground-Fixing System (이동식 크레인의 접지설계 시스템)

  • Ho, Jong-Kwan;Seo, Jong-Min;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.6
    • /
    • pp.83-90
    • /
    • 2007
  • A mobile crane has been more frequently used to deal with the increased capital-intensive projects in line with the economic growth, but the operation is still heavily dependent on personal experience in the past, resulting in severe overturn accidents that cause the loss of lives and damage to the properties. A crane shall be installed in a systematic manner that proved to be safe in engineering aspect, and should the installation and operation be blindly dependent on experience alone, it would apparently cause a great risk. Particularly the mobile crane, among others, frequently causes a severe overturn accident due to poor ground-fixing device. The study therefore focused on fixing system of mobile crane and the outcome is highly expected to make a great commitment to selecting the optimal type of crane for the project as well as to securing the safety during construction.

Harmonics Measurement and Analysis on Industrial load Facilities (산업용 부하설비의 고조파 측정 및 분석)

  • Han, Wun-Dong;Ji, Pyeong-Shik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.2
    • /
    • pp.133-139
    • /
    • 2006
  • Harmonics happened due to nonlinear systems such as UPS, SCR controlled motors, and fluorescent lighting in distribute power system is very important subject to optimal operation and control of power system. Harmonics sometimes make incorrect operation of protective relaying system under normal condition on power system. In this study, total harmonics distortion(THD) of power were measured and analyzed by the field test on electrical facilities which were installed at the rural industrial complex in Chungbuk province. In addition, the deprivation of power factor by harmonics and the content of THD which is measured at neutral line was researched.

  • PDF

Operation Performance of a Polymer Electrolyte Fuel Cell Cogeneration System for Residential Application (가정용 고분자연료전지 시스템의 운전 방법에 따른 성능 비교)

  • Lee, W.Y.;Jeong, K.S.;Yu, S.P.;Um, S.K.;Kim, C.S.
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.16 no.4
    • /
    • pp.364-371
    • /
    • 2005
  • Fuel cell systems(FCS) have a financial and environmental advantage by providing electricity at a high efficiency and useful heat. For use in a residence, a polymer electrolyte fuel cell system(PEFCS) with a battery pack and a hot water storage tank has been modelled and simulated. The system is operated without connection to grid line. Its electric conversion efficiency and heat recovery performance are highly dependent on operation strategies and also on the seasonal thermal and electric load pattern. The output of the fuel cell is controlled stepwise as a function of the state of the battery and/or the storage water tank. In this study various operation strategies for cogeneration fuel cell systems are investigated. Average fuel saving rates at different seasons are calculated to find proper load management strategy. The scheme can be used to determine the optimal operating strategies of PEFCS for residential and building applications.

Application of Parallel PSO Algorithm based on PC Cluster System for Solving Optimal Power Flow Problem (PC 클러스터 시스템 기반 병렬 PSO 알고리즘의 최적조류계산 적용)

  • Kim, Jong-Yul;Moon, Kyoung-Jun;Lee, Haw-Seok;Park, June-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.10
    • /
    • pp.1699-1708
    • /
    • 2007
  • The optimal power flow(OPF) problem was introduced by Carpentier in 1962 as a network constrained economic dispatch problem. Since then, the OPF problem has been intensively studied and widely used in power system operation and planning. In these days, OPF is becoming more and more important in the deregulation environment of power pool and there is an urgent need of faster solution technique for on-line application. To solve OPF problem, many heuristic optimization methods have been developed, such as Genetic Algorithm(GA), Evolutionary Programming(EP), Evolution Strategies(ES), and Particle Swarm Optimization(PSO). Especially, PSO algorithm is a newly proposed population based heuristic optimization algorithm which was inspired by the social behaviors of animals. However, population based heuristic optimization methods require higher computing time to find optimal point. This shortcoming is overcome by a straightforward parallel processing of PSO algorithm. The developed parallel PSO algorithm is implemented on a PC cluster system with 6 Intel Pentium IV 2GHz processors. The proposed approach has been tested on the IEEE 30-bus system. The results showed that computing time of parallelized PSO algorithm can be reduced by parallel processing without losing the quality of solution.

Optimal Design of A Quick-Acting Hydraulic Fuse Using Design of Experiments and Complex Method (실험계획법과 콤플렉스법에 의한 고성능 유압휴즈의 최적 설계)

  • Lee, Seong Rae
    • Journal of Drive and Control
    • /
    • v.12 no.4
    • /
    • pp.8-14
    • /
    • 2015
  • A quick-acting hydraulic fuse, which is mainly composed of a poppet, a seat, and a spring, must be designed to minimize the leaked oil volume during fuse operation on a line rupture. The optimal design parameters of a quick-acting hydraulic fuse were searched using the design of experiments method and the complex method. First, the $L_{50}(5^4)$ orthogonal array is used to find the robust minimum point among the 625 points of design variables. The search range can then be narrowed around the robust minimum point. Second, the $L_{25}(5^4)$ orthogonal array is used to obtain the variations of the design variables in the narrowed search range. The variations of design variables are used to set the structure of a polynomial equation representing the leakage oil volume of the quick-acting hydraulic fuse. The least squares method is then applied to obtain the coefficients of polynomial equation. Finally, the complex method is used to find the optimal design parameters where the objective function is described by the polynomial equation.

An Approach to Optimal Dispatch Scheduling Incorporating Transmission Security Constraints

  • Chung, Koo-Hyung;Kang, Dong-Joo;Kim, Balho H.;Kim, Tai-Hoon;Oh, Tae-Kyoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.2
    • /
    • pp.199-206
    • /
    • 2008
  • The introduction of competition in electricity markets emphasizes the importance of sufficient transmission capacities to guarantee effective power transactions. Therefore, for the economic and stable electric power system operation, transmission security constrains should be incorporated into the dispatch scheduling problem. With the intent to solve this problem, we decompose a dispatch scheduling problem into a master problem(MP) and several subproblems(SPs) using Benders decomposition. The MP solves a general optimal power flow(OPF) problem while the SPs inspect the feasibility of OPF solution under respective transmission line contingencies. If a dispatch scheduling solution given by the MP violates transmission security constraints, then additional constraints corresponding to the violations are imposed to the MP. Through this iterative process between the MP and SPs, we derive an optimal dispatch schedule incorporating the post-contingency corrective rescheduling. In addition, we consider interruptible loads as active control variables since the interruptible loads can participate as generators in competitive electricity markets. Numerical examples demonstrate the efficiency of the proposed algorithm.