• 제목/요약/키워드: Optimal Manpower

검색결과 64건 처리시간 0.026초

통계적 방법을 이용한 항공기 정비인력산정 (A Statistical Method on the Estimation of the Maintenance Manpower of Aircraft)

  • 송근우;최석철
    • 한국국방경영분석학회지
    • /
    • 제26권1호
    • /
    • pp.70-88
    • /
    • 2000
  • In this research we consider a statistical model to estimate the optimal maintenance manpower of aircraft which we use at present. We design a multiple regression model, apply to three types of aircraft to estimate the optimal maintenance manpower of aircraft. This paper provides reasonable results about maintenance manpower of aircraft, and contributes accomplishment of mission for air and air support operations.

  • PDF

중국 일 종합병원에서 적정 간호인력 추정을 위한 환자분류체계의 타당성 검증 (A Study on the Validity Test of Patient Classification System for Optimal Nursing Manpower of Hospital in China)

  • 송영선;이동매
    • 간호행정학회지
    • /
    • 제11권2호
    • /
    • pp.209-218
    • /
    • 2005
  • Purpose: This study was to setup the basis on hospital and national nursing manpower estimation accurately according to apply patient classification system of Song's study to China hospital system. Method: This study was surveyed to 964 patients at surgical and medical ward on Yanbian University Hospital in China from 17th to 31th January, 2005. Results: There was study results to test hypotheses for estimating optimal nursing manpower as follows. First, a trimodel classification scheme was developed which suggested three categories of patients as minimal care(category 1), moderate care(category 2), intensive care(category 3). Second, there was not significant difference with nursing time by sex. Third, there was not significant difference with nursing time by medical wards. Fourth, there was not significant difference with average nursing care time for each category of patients. Category 1 was estimated to spend average 19.59minutes for patients, Category 2 was about 35.68 minutes, Category 3 was 72.07minutes respectively. Total nursing hours was 62,610 minutes. Conclusion: Patient classification system of Song's study is validity for optimal nursing manpower of hospital in China.

  • PDF

가변적 수요에 대한 최적인력의 크기와 휴무계획 결정방법 (Optimal Workforce Size and Day-off Scheduling with Variable Demands)

  • 기재석;강맹규
    • 대한산업공학회지
    • /
    • 제13권2호
    • /
    • pp.9-16
    • /
    • 1987
  • This paper develops an optimal manpower scheduling algorithm that gives an optimal workforce size and day-off scheduling required to satisfy following conditions. First, everyone is to have two consecutive day-off per cycle in a continuous operating environment. Second, everyone is to have at least A weekends off in a cycle of B Weeks. The model addressed is under the circumstance that the demands can vary from day to day in a weekly cycle. The proposed algorithm makes it possible to minimize the maximum workstretch and to maximize the number of weekends off. It is also possible to minimize the variance of idle manpower distribution in order that idle manpower may be utilized in case of emergency.

  • PDF

유전자 알고리즘을 이용한 프로젝트 포트폴리오 투입인력 최적화 모델에 관한 연구 (A Study on the Optimization Model for the Project Portfolio Manpower Assignment Using Genetic Algorithm)

  • 김동욱;이원영
    • 한국IT서비스학회지
    • /
    • 제17권4호
    • /
    • pp.101-117
    • /
    • 2018
  • Companies are responding appropriately to the rapidly changing business environment and striving to lead those changes. As part of that, we are meeting our strategic goals through IT projects, which increase the number of simultaneous projects and the importance of project portfolio management for successful project execution. It also strives for efficient deployment of human resources that have the greatest impact on project portfolio management. In the early stages of project portfolio management, it is very important to establish a reasonable manpower plan and allocate performance personnel. This problem is a problem that can not be solved by linear programming because it is calculated through the standard deviation of the input ratio of professional manpower considering the uniformity of load allocated to the input development manpower and the importance of each project. In this study, genetic algorithm, one of the heuristic methods, was applied to solve this problem. As the objective function, we used the proper input ratio of projects, the input rate of specialist manpower for important projects, and the equal load of workload by manpower. Constraints were not able to input duplicate manpower, Was used as a condition. We also developed a program for efficient application of genetic algorithms and confirmed the execution results. In addition, the parameters of the genetic algorithm were variously changed and repeated test results were selected through the independent sample t test to select optimal parameters, and the improvement effect of about 31.2% was confirmed.

경영지향성에 따른 호텔 MICE 적정 인력 측정 모델 연구 (A Study on hybrid model for measuring the manpower of Hotel MICE, based on management orientation)

  • 김영문;윤혜진;김철원
    • 한국과학예술포럼
    • /
    • 제37권2호
    • /
    • pp.35-46
    • /
    • 2019
  • 본 연구는 호텔 MICE의 적정인력 산정을 위한 지표를 개발하는 목적에서 시작되었다. 따라서 본 연구는 국내외 다양한 MICE 행사들을 유치하고 운영하고 있는 서울의 특급호텔 MICE 관련 전문가들을 대상으로 적정 인력을 산정할 때 중요하게 고려해야 하는 항목들을 도출하고 지표의 신뢰성과 타당성을 시도하였다. 연구결과 및 내용은 다음과 같다. 첫째, 도출 결과의 일반화를 위하여 최종 개발된 지표는 호텔 MICE 행사와 관련한 289명의 종사원들을 대상으로 실증 분석을 하여 지표의 신뢰성과 타당성을 검토하였다. 둘째, 그 결과 호텔의 인력 산정 및 운영에 매우 큰 영향을 미치는 호텔의 인사 및 경영전략을 3가지로 분류(서비스 지향, 안정성 지향, 효율성 지향)하였다. 셋째, 도출된 지표는 실무적으로 측정할 수 있도록 정량지표(15개)와 정성 지표(19개)로 구분하였으며, 호텔 MICE의 적정인력 산정은 정량지표와 정성 지표와 의 총계이다. 본 연구는 도출된 적정인력 지표를 정량 및 정성 지표로 구분하고 향후 실측할 수 있는 산식의 모형을 제시하였다는 점에서 향후 실무적으로 크게 기여할 것으로 기대한다.

2010년까지의 간호사 인력 수요 및 공급 추계 (The Supply and Demand Projection of Nurses in Korea)

  • 박현애;최영희;이선자
    • 보건행정학회지
    • /
    • 제3권1호
    • /
    • pp.146-168
    • /
    • 1993
  • The study was conducted to project supply and demand of the nurses till year 2010 based on analysis of supply and demand of nurses up to year 1991. Results of the study will provide invaluable information for nurses manpower planning as well as overall health manpower planning for the 21th century. It is projected that nurses will be oversupplied based on the current prductivity which is undesirable situation if the quality of care is considered, and undersupplied based on the the medical law as well as optimal productivity. Thus, it is desirable to increase active supply of nurses. One of the ways of increasing active supply would be increasing the size of training and education. But, considering low employment rate of nurses which is about 59% better way of solving problems related to nurses shortage would be improvement in nurses' employment rate. According to simulation study done as part of this study, if nurses' employment rate goes up to 80%, there is no need for increasing the size of training to meet the demand at the level of medical law.

  • PDF

2010년까지의 진료부문 의사인력수급 추계 (The Supply and Demand Projection of Physicians in the Medical Service Area)

  • 박현애;최정수;류시원
    • 보건행정학회지
    • /
    • 제1권1호
    • /
    • pp.136-152
    • /
    • 1991
  • The study was conducted to project supply and demand of the physicians from year 1991 to year 2010 based on the analysis of supply and demand of the physicians up to year 1989. Results of the study will provide information for the physicians manpower planning of the 7th 5-year Economic Social Development Planning(1992-1996) and contribute to the overall health manpower planning for the 21the century. It is projected that physician will be oversupplied from the very near future based on the current productivity or underestimated based on the optimal productivity. Thus, it is desirable not to change size of training and education during the 7the 5-year planning period and re-examine the status of the physician manpower at the end of the 7th 5-year period taking into consideration medical services utilization pattern, patients' satisfaction, and physicians' productivity.

  • PDF

DEVELOPMENT OF A TABU SEARCH HEURISTIC FOR SOLVING MULTI-OBJECTIVE COMBINATORIAL PROBLEMS WITH APPLICATIONS TO CONSTRUCTING DISCRETE OPTIMAL DESIGNS

  • JOO SUNG JUNG;BONG JIN YUM
    • Management Science and Financial Engineering
    • /
    • 제3권1호
    • /
    • pp.75-88
    • /
    • 1997
  • Tabu search (TS) has been successfully applied for solving many complex combinatorial optimization problems in the areas of operations research and production control. However, TS is for single-objective problems in its present form. In this article, a TS-based heuristic is developed to determine Pareto-efficient solutions to a multi-objective combinatorial optimization problem. The developed algorithm is then applied to the discrete optimal design problem in statistics to demonstrate its usefulness.

  • PDF

국내 건축공사 시공조직 구성에 관한 연구 - 수도권 공동주택을 중심으로 - (A Study on Composition of The Construction Organization in Construction Work in Korea - Focus on Apartment of The Capital Region -)

  • 이교선;김현석;강경인
    • 한국건축시공학회지
    • /
    • 제3권1호
    • /
    • pp.155-160
    • /
    • 2003
  • The Korean economic crisis hit badly the local construction industry, especially during the year of the 1998 when the country took the IMF bailout proframme. Under the poor business environment, such as reduction of construction investment, financial difficulty from high interest rate, and increasing bankruptcies, restructuring measures were repuired for survival of the industry. It is obvious the restructuring process is essential for the future business success. regardless of the financial crisis. With this background, this research aims the contribute to improved construction management structure and strengthened international competitiveness of the industry through the cost reduction and productivity enhancement, by analysising and proposing and optimal level of the manpower structure of construction management organization With the subject of 24 construction fields of apartment houses in the capital region as of January 1, 1999, constructed by OO company having leaded the construction industry of the country so far now, the researcher performed the on the spot survey regarding the organization/manpower structure and construction contract amount.

A TQM case of Centralized Sequential Decision-making Problem

  • Chang, Cheng-Chang;Chu, Yun-Feng
    • International Journal of Quality Innovation
    • /
    • 제4권1호
    • /
    • pp.131-147
    • /
    • 2003
  • This paper considers that a public department under specialized TQM manpower constraints have to implement multiple total quality management (TQM) policies to promote its service performance (fundamental goal) by adopting a centralized sequential advancement strategy (CSAS). Under CSAS, the decision-makers (DMs) start off by focusing specialized TQM manpower on a single policy, then transfer the specialized TQM manpower to the next policy when the first policy reaches the predetermined implementation time limit (in terms of education and training). Suppose that each TQM policy has a different desirous education and training goal. When the desirous goals for all TQM policies are achieved, we say that the fundamental goal will be satisfied. Within the limitation of total implementation period of time for all policies, assume the desirous goals for all TQM policies cannot be achieved completely. Under this premise, the optimal implementation sequence for all TQM policies must be calculated to maximize the weighted achievement of the desirous goal. We call this optimization problem a TQM case of "centralized sequential decision-making problem (CSDMP)". The achievement of the desirous goal for each TQM policy is usually affected by the experience in prior implemented policies, which makes solving CSDMP quite difficult. As a result, this paper introduces the concepts of sequential effectiveness and path effectiveness. The structural properties are then studied to propose theoretical methods for solving CSDMP. Finally, a numerical example is proposed to demonstrate CSDMP′s usability.