• Title/Summary/Keyword: Optical Subscriber network

Search Result 54, Processing Time 0.021 seconds

A Packet Control method of Interconnection between IBM NP4GS3 DASL and CSIX Interface (IBM NP4GS3 DASL인터페이스와 CSIX-Ll인터페이스의 연동구조 및 패킷 제어방안)

  • 김광옥;최창식;박완기;최병철;곽동용
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.40 no.4
    • /
    • pp.10-21
    • /
    • 2003
  • Recently, the optical subscriber interface module uses the high performance network processor to quickly develop new application services such as MPLS, VPN, RPR and EPON with a short time-to-market. Although a number of vendors are developing the network processor at 2.5Gbps, only the IBM NP4GS3 can provide packet processing with wire-speed at 2.5Gbps. IBM NP4GS3, however, uses its unique speed DASL interface instead of CSIX-Ll interface, which has standardized by M: Forum currently Therefore, we implement an interconnection mechanism to use the switch fabric with CSIX-Ll interface. In this paper, we suggest the architecture and a packet control mechanism supporting interconnection between IBM NP4GS3 DASL and CSIX-Ll switch interface using the common IBM UDASL ASIC and XILINX FPGA.

Performance Evaluation of a Dynamic Bandwidth Allocation Algorithm with providing the Fairness among Terminals for Ethernet PON Systems (단말에 대한 공정성을 고려한 이더넷 PON 시스템의 동적대역할당방법의 성능분석)

  • Park Ji-won;Yoon Chong-ho;Song Jae-yeon;Lim Se-youn;Kim Jin-hee
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.11B
    • /
    • pp.980-990
    • /
    • 2004
  • In this paper, we propose the dynamic bandwidth allocation algorithm for the IEEE802.3ah Ethernet Passive Optical Network(EPON) system to provide the fairness among terminals, and evaluate the delay-throughput performance by simulation. For the conventional EPON systems, an Optical Line Termination (OLT) schedules the upstream bandwidth for each Optical Network Unit (ONU), based on its buffer state. This scheme can provide a fair bandwidth allocation for each ONU. However, it has a critical problem that it does not guarantee the fair bandwidth among terminals which are connected to ONUs. For an example, we assume that the traffic from a greedy terminal increases at a time. Then, the buffer state of its ONU is instantly reported to the OLT, and finally the OW can get more bandwidth. As a result, the less bandwidth is allocated to the other ONUs, and thus the transfer delay of terminals connected to the ONUs gets inevitably increased. Noting that this unfairness problem exists in the conventional EPON systems, we propose a fair bandwidth allocation scheme by OLT with considering the buffer state of ONU as welt as the number of terminals connected it. For the performance evaluation, we develop the EPON simulation model with SIMULA simulation language. From the result of the throughput-delay performance and the dynamics of buffer state along time for each terminal and ONU, respectively, one can see that the proposed scheme can provide the fairness among not ONUs but terminals. Finally, it is worthwhile to note that the proposed scheme for the public EPON systems might be an attractive solution for providing the fairness among subscriber terminals.

Implementation of 500BASE-T with 2 Pairs UTP (2조 UTP를 이용한 500BASE-T의 구현)

  • Chung, Hae;Jeon, Seong-Bae;Kim, Jin-Hee;Park, Hyung-Jin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.10B
    • /
    • pp.1150-1158
    • /
    • 2011
  • More than 100 Mbps rate is needed in the UBcN for a subscriber to receive broadband traffics with multi-channel like UDTV or 3DTV. Although the optical fiber is recently deployed for the FTTH, the UTP is the most widely used medium and will be used in UBcN age. Network providers may consider the 1000BASE-T or the vectorized VDSL if they adopts the UTP in the place where does not have optical fibers. But UTP should be expanded because 1000BASE-T and vectorized UTP needs 4 and 3 pairs cable, respectively while residential region has not exceeding 2 pair UTP cable. To solve the problem, we propose a 500BASE-T technology using 2 pairs UTP in this paper. The technology introduces a rate adaptation sublayer and a SERDES sublayer above and under the PCS, respectively. The rate adaptation sublayer is compatible for the GMII. Also, if we modify the SERDES sublayer, the technology can easily obtain 250BASE-T with 2 pairs UTP. We implement such functions with FPGA and analog board and verify the function of rate adaptation and symbol vector synchronization, and effective transmission rate by experiments. In particular, we show that link efficiency is increased by enable control in the rate adaptation sublayer.

A study on the Need for Introducing the Information and Communication Facilities Maintenance Mandatory System: In view of Apartment House Environment) (정보통신설비의 유지관리 의무화제도 도입 필요성에 관한 연구(공동주택환경을 중심으로))

  • Lim, Sang-Chool;Kim, Sun-Hyung
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.6 no.3
    • /
    • pp.15-24
    • /
    • 2007
  • According to an apartment house environment and the service provide method of major telecom operators, is providing optic-LAN service with installing the equipments of optical office center and optic distribution at MDF(Main Distribution Frame) and under-ground of apartment. therefore the distribute is deepening between service providers because of space securement to install equipments and spare pipe securement to reinstall UTP cable. These were reasons that operators leaned to subscriber collection and neglected to maintenance, in addition, insist the facilities invested by each operators is his own assets for all that in-plant of apartment house is private land. So, would not being touched by others. Accordingly, this study will search it through the field current condition examine that service's types and methods which various telecom operators and broadcast operators are providing, the current conditions of being maintained, the problems of being happened. etc. and would like to improve that the users could use the services safely by making the information & communication facilities maintenance mandatory under the regular size of apartment house circumstances through the analysis of various laws relations which are managed information & communication construction work law, telecommunication basis law, home network. etc. technical standards by the Ministry of Information and Communication and are managed housing law, construction law, the regulation related to house construct standards. etc. by the Ministry of Construction and Transportation.

  • PDF