• Title/Summary/Keyword: Operations Scheduling

Search Result 590, Processing Time 0.023 seconds

Integration of Process Planning and Operations Scheduling by Process Net Model and Genetic Algorithm (공정 네트 모델과 유전 알고리즘에 의한 공정 계획과 일정 계획의 통합)

  • 박지형;강민형;노형민
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.3
    • /
    • pp.82-87
    • /
    • 1998
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper, an integrated system of process planning and operations scheduling based on the concept of process net model and genetic algorithm is suggested. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

LSB 스케줄링기법의 소개

  • Park Chang Gyu;Kim Hyeon Jun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.944-948
    • /
    • 2002
  • In industrial production setting scheduling problems of detalied day-to-day operations are often ordeals to production practitioners. For those who have scheduling experience with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large stale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. This paper introduces a new LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through the computer simulation in a hypothetical setting, this paper provides a comparison of LSB scheduling with existing algorithms and a guideline for selecting the suitable algorithm for certain industrial setting.

  • PDF

LSB Algorithm for the Job Oriented Heuristic Scheduling (작업지향 탐색적 일정계획을 위한 LSB 기법)

  • Kim Hyun-joon;Park Changkyu
    • Korean Management Science Review
    • /
    • v.21 no.2
    • /
    • pp.79-91
    • /
    • 2004
  • In industrial production settings, scheduling problems for detailed day-to-day operations are often ordeals to production practitioners. For those who have scheduling experiences with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large scale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. In this paper, we Introduce the LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through a computer experiment in a hypothetical setting, we make a performance comparison of LSB scheduling algorithm with existing algorithms and also suggest a guideline for selecting the suitable algorithm for certain industrial settings.

A Genetic Algorithm for Integration of Process Planning and Scheduling in a Job Shop (Job Shop 통합 일정계획을 위한 유전 알고리즘)

  • Park, Byung-Joo;Choi, Hyung-Rim;Kang, Moo-Hong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.3
    • /
    • pp.55-65
    • /
    • 2005
  • In recent manufacturing systems, most jobs may have several process plans, such as alternative sequence of operations, alternative machine etc. A few researches have addressed the necessity for the integration of process planning and scheduling function for efficient use of manufacturing resources. But the integration problem is very difficult and complex. Many prior researches considered them separately or sequentially. It introduces overlapping or partial duplications in solution efforts. In this paper, Integration problem of jobs with multiple process plans in a job shop environment Is addressed. In order to achieve an efficient integration between process planning and scheduling by taking advantage of the flexibility that alternative process plans offer, we designed GA(Genetic Algorithm)-based scheduling method. The performance of proposed GA is evaluated through comparing integrated scheduling with separated scheduling in real world company with alternative machines and sequences of operations. Also, a couple of benchmark problems are used to evaluate performance. The integrated scheduling method in this research can be effectively epplied to the real case.

A Process-net based System for the Integration of Process Planning and Operation Scheduling (동정 네트 모델에 의한 공정 계획과 일정 계획의 통합)

  • 박지형;강민형;노형민
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.445-449
    • /
    • 1997
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper,an integrated system of process planning and operations scheduling based on the concept of process net model is presented. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

Issues and approaches to spatial scheduling (공간 일정 계획의 이슈들과 접근방법)

  • 이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.758-759
    • /
    • 1995
  • In large-scale industry such as shipbuilding, aircraft manufacturing, and construction industry etc., it is required to consider two or three-dimensional spatial availability as one of bottlenecked resource constraints. We call this kind of scheduling a spatial scheduling, which considers the dynamic spatial layouts of objects as well as the traditional resource constraints. Since 1991, we have researched on the spatial scheduling for shipbuilding plant (Lee & Lee, 1992; Lee et al., 1994, Lee et al., 1995). In this paper, we present the various issues of spatial scheduling for the researchers and developers attacking spatial scheduling problems.

  • PDF

An Watch Duty Scheduling by using Heuristic focused on Korea Navy Ship (휴리스틱을 이용한 초계함급 함정의 정박당직근무 일정계획)

  • Jang, Yeong-Cheon;Jun, Geon-Uk
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.60-74
    • /
    • 2005
  • The main purpose of this study is to develop an watch duty scheduling focused on Korea Navy Ship, PCC class, in port. The watch duty scheduling is a type of a scheduling problem which both considers the readiness of the ship and fair duty for each person. In this study, we analyzed the personal ability and military occupational speciality and developed a manpower scheduling by using heuristic. We find an efficient and effective watch duty schedule which improved results.

A rule-based scheduling system for automated machining

  • Ahn, Jaekyoung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.249-257
    • /
    • 1992
  • An automated machining system involves concurrent use of manufacturing resources, alternative process plans, and flexible routings. High investment in the installation of automated facilities requires an efficient scheduling system that is able to allocate the resources specified for operations over a scheduling horizon. The primary emphasis of this paper is to generate schedules that accurately reflect details of the automated environment and the objectives stated for the system. In this paper, a scheduling algorithm for automated machining is presented. Using the previous simulation research for this topic, a rule-based scheduling system is constructed. An architecture for an intelligent scheduling system is proposed, and the system has a high potential to provide efficient schedules based on the task-specific knowledge for the dynamic scheduling environment

  • PDF

An Operating System Design and Development for Efficient Painting Process

  • Chung, Kuy-Hoon;Baek, Tae-Hyun;Park, Ju-Chull;Cho, Kyu-Kab
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.183-187
    • /
    • 2000
  • In this study, we design a scheduling system for painting shop, called HYPOS(Hyundai heavy industry Painting shop Operating System) and develop a system implementing the design. The painting shop operations are currently scheduled manually by experts. Manual scheduling is a serious time consuming job and generally can not guarantee a full optimality. Building a traditional heuristic scheduling system lot this problem, however, is not promising because there are various kinds of constraints to be satisfied including space allocation of shipbuilding blocks in a painting cell. We, therefore, adopt a spatial scheduling approach and develop scheduling algorithms based on field-oriented scheduling heuristics and computational geometry. And we show that the algorithms can successfully be applied to the painting shop scheduling problem.

  • PDF