• Title/Summary/Keyword: Operational period

Search Result 509, Processing Time 0.021 seconds

Bridge Resistance Deviation-to-Period Converter for Resistive Biosensors

  • Bae, Cheol-Soo
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.7 no.4
    • /
    • pp.195-199
    • /
    • 2014
  • A bridge resistance deviation-to-period (BRD-to-P) converter is presented for interfacing resistive biosensors. It consists of a linear operational transconductance amplifier (OTA) and a current-controlled oscillator (CCO) formed by a current-tunable Schmitt trigger and an integrator. The free running period of the converter is 1.824 ms when the bridge offset resistance is $1k{\Omega}$. The conversion sensitivity of the converter amounts to $3.814ms/{\Omega}$ over the resistance deviation range of $0-1.2{\Omega}$. The linearity error of the conversion characteristic is less than ${\pm}0.004%$.

A Study on Optimal Software Maintenance Policies with Warranty Period (보증기기간을 고려한 최적 소프트웨어의 보전정책 연구)

  • Nam, Kyung-H.;Kim, Do-Hoon
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.2
    • /
    • pp.170-178
    • /
    • 2011
  • In general, a software fault detection phenonenon is described by a software reliability model based on a nonhomogeneous Poisson process(NHPP). In this paper, we propose a software reliability growth model considering the differences of the software environments in both the testing phase and the operational phase. Also, we consider the problem of determining the optimal release time and the optimal warranty period that minimize the total expected software cost which takes account of periodic software maintenance(e.g. patch, update, etc). Finally, we analyze the sensitivity of the optimal release time and warranty period based on the fault data observed in the actual testing process.

Operational Reliability Analysis of Guided Weapon Systems (유도무기 시스템의 운용 신뢰도 분석)

  • Ha, Ju Seok;Kim, Kyung Mo
    • Convergence Security Journal
    • /
    • v.17 no.3
    • /
    • pp.95-101
    • /
    • 2017
  • Reliability is the priority matter in guided weapon systems. The reliability prediction data is used during the devel opment stage as the manufacturing cost is very high and the production quantity if quite limited. At the same time it takes relatively a long period of time to acquire a reliable operation data set after deployment such that in order t o determine the operational reliability, weapons must be tested and analyzed in real operating environments. For the research, the life distributions were estimated by using actual operation data and the reliability was calculated by ap plying the method of least squares and maximum likelihood estimation. Also, the comparisons were made between pr edicted reliability and actual operational reliability. As a result, the actual reliability of each system was higher than predicted reliability and it was considered that such a difference was caused by the fact that the application of the l atest designing technology and improved parts to the guided weapon systems was not reflected on the estimation of predicted reliability. It was possible to confirm the actual operational reliability of domestic (ROK) guided weapon sy stems through this research and the methods used here will contribute to the reliability analyses for the future guide d weapon systems to be developed.

The Investigation and Improvement plan of Contracting-out municipal wastewater treatment plant system in Korea (국내 하수처리장 관리대행 현황 및 제도 개선 방안)

  • Im, Jiyeol;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.19 no.2
    • /
    • pp.211-215
    • /
    • 2017
  • The market of the municipal wasetewater treatment plant (MWTP) operation is expanding across the world including Korea. The contracting-out system was introduced for the effective operation of MWTPs. However, an improvement of the contracting-out system of MWTP has been continuously required. This research investigated current operational status of MWTPs in Korea, to suggest the improvement of the cost effective MWTP operation to promote the contracting-out system of MWTP operation. Results showed that lower operational costs of MWTP were lower in larger MWTPs than in smaller MWTPs. Overall, MWTPs operated by a public enterprise showed lower operational costs than those operated by government agencies and private enterprises. Among the MWTPs similar in their treatment capacity, treatment process and operation period, MWTPs operated by private enterprises showed the lowest operational cost. According to the survey, managers and operators of MWTPs emphasized the importance of improvement on the methods of selecting operating agencies and estimating operationing costs. The results of this study should be useful as important supporting data to promote the contracting-out system for the MWTP operation.

Seasonal Forecasting of Tropical Storms using GloSea5 Hindcast (기후예측시스템(GloSea5) 열대성저기압 계절예측 특성)

  • Lee, Sang-Min;Lee, Jo-Han;Ko, A-Reum;Hyun, Yu-Kyung;Kim, YoonJae
    • Atmosphere
    • /
    • v.30 no.3
    • /
    • pp.209-220
    • /
    • 2020
  • Seasonal predictability and variability of tropical storms (TCs) simulated in the Global Seasonal Forecast System version 5 (GloSea5) of the Korea Meteorological Administration (KMA) is assessed in Northern Hemisphere in 1996~2009. In the KMA, the GloSea5-Global Atmosphere version 3.0 (GloSea5-GA3) that was previously operated was switched to the GloSea5-Global Coupled version 2.0 (GloSea5-GC2) with data assimilation system since May 2016. In this study, frequency, track, duration, and strength of the TCs in the North Indian Ocean, Western Pacific, Eastern Pacific, and North Atlantic regions derived from the GloSea5-GC2 and GloSea5-GA3 are examined against the best track data during the research period. In general, the GloSea5 shows a good skill for the prediction of seasonally averaged number of the TCs in the Eastern and Western Pacific regions, but underestimation of those in the North Atlantic region. Both the GloSea5-GA3 and GC2 are not able to predict the recurvature of the TCs in the North Western Pacific Ocean (NWPO), which implies that there is no skill for the prediction of landfalls in the Korean peninsula. The GloSea5-GC2 has higher skills for predictability and variability of the TCs than the GloSea5-GA3, although continuous improvements in the operational system for seasonal forecast are still necessary to simulate TCs more realistically in the future.

Sensitivity Analysis of Wind-Wave Growth Parameter during Typhoon Season in Summer for Developing an Integrated Global/Regional/Coastal Wave Prediction System (전지구·지역·국지연안 통합 파랑예측시스템 개발을 위한 여름철 태풍시기 풍파성장 파라미터 민감도 분석)

  • Oh, Youjung;Oh, Sang Meong;Chang, Pil-Hun;Kang, KiRyong;Moon, Il-Ju
    • Ocean and Polar Research
    • /
    • v.43 no.3
    • /
    • pp.179-192
    • /
    • 2021
  • In this study, an integrated wave model from global to coastal scales was developed to improve the operational wave prediction performance of the Korean Meteorological Administration (KMA). In this system, the wave model was upgraded to the WaveWatch III version 6.07 with the improved parameterization of the source term. Considering the increased resolution of the wind input field and the introduction of the high-performance KMA 5th Supercomputer, the spatial resolution of global and regional wave models has been doubled compared to the operational model. The physical processes and coefficients of the wave model were optimized for the current KMA global atmospheric forecasting system, the Korean Integrated Model (KIM), which is being operated since April 2020. Based on the sensitivity experiment results, the wind-wave growth parameter (βmax) for the global wave model was determined to be 1.33 with the lowest root mean square errors (RMSE). The value of βmax showed the lowest error when applied to regional/coastal wave models for the period of the typhoon season when strong winds occur. Applying the new system to the case of August 2020, the RMSE for the 48-hour significant wave height prediction was reduced by 13.4 to 17.7% compared to the existing KMA operating model. The new integrated wave prediction system plans to replace the KMA operating model after long-term verification.

Korea's Free Economic Zone as an Economic Development Strategy and Operational System (경제발전전략으로서 한국의 경제자유구역과 운영체계에 관한 연구)

  • Koh, Eui-Hyeon
    • Journal of Distribution Science
    • /
    • v.12 no.9
    • /
    • pp.113-123
    • /
    • 2014
  • Purpose - After Korea's Free Economic Zone (FEZ) system was launched in 2003, there have been many debates about upgrading it and its support systems. However, as of 2013, there were insufficient results. Further, upon the designation of the East Coast and Chungbuk as official FEZs from February 4, 2013 by the 56th the Commission, there is a concern that many people are in the area designated as FEZ 8. This study investigates Korea's new FEZ system as part of Korea's primary new economic development policy in the 21st century. Therefore, this study examines views on the weaknesses of the past ten years of FEZs so that Korea can expand its FEZ system. Research design, data, and methodology -Many countries have considered the FEZ as an economic special zone. By reviewing previous research models, this study provides an update using recent data and materials, until 2013, from the Center of Free Economic Zones. In previous studies, the lack of support systems was attributed to proposals to ensure operational autonomy and differentiation of each FEZ; however, the main cause cannot be solved through regulatory issues, as difficulties caused by the operational system are responsible for the problems. We wish to analyze the FEZ, specifically the operational system; this is the main issue of this study. Results - After the first FEZs were established, it became necessary to have basic plans, as investment results in 2013 compared to the same period this year led to lower earnings in the first half of 2014. We propose an improvement of the operational system because in the free economic zones, the operational system is the root cause of the underlying problem. The results of this research are as follows. The weak management of the FEZ system is influenced by weak investment, delayed development, foreigners' living facilities, benefits of foreign investments, the control tower's policy making decision process, quickness of the process of satisfying legal requirements, and support For the independence of FEZs. Conclusion - Local governments do not have legal rights over FEZ deregulation and investment industries. This study suggests that the local government should have more independence from the central government. Moreover, independent management committees are more effective for ensuring public rights, better employee responsibilities, and better-qualified personnel. The FEZ committee struggles to effectively manage the locations of FEZs, foreign investments, and related facilities under the control of the Ministry of Trade, Industry and Energy. Thus, the FEZ committee should be under either the Prime Minister's office or the Presidential committee, to control and effectively coordinate between the local and central governments. If the problem clearly applies to the operational system in 2013, it is necessary to provide materials and methods so that the results of the first half of 2014 can be computed despite the data limits and lack of resources, and the data can be analyzed in a more diachronic thesis.

A Study on the Role Conflict of Head Nurse (수간호원의 역할 갈등에 관한 연구)

  • 박성애;이병숙
    • Journal of Korean Academy of Nursing
    • /
    • v.15 no.1
    • /
    • pp.44-51
    • /
    • 1985
  • The purpose of this study was to investigate the role conflict of head nurse; to identify the degree of the role conflict, the sources of the conflict, and the relation between the degree of the conflict and the general characteristics of head nurse. During the period from July 23, 1984 to August 4, 1984, data were collected from 109 head nurses working in 7 general hospitals in seoul. The results of this study were: 1. The degree of the role conflict of head nurse was moderate. But among the three areas in performing head nurse's role, the degree of role conflict as a operational manager was slightly serious. 2. In the various sources of the role conflict of head nurse, the main sources were the shoratage of personnel (20.7%), lack of equipment (19.3%), and lack of time. (17.6%). 3. In comparison of the degree of role conflict of head nurse, there is no significant difference in the general characteristics of head nurse. But the role conflict of head nurse as a operational manager, there is a significant difference in hospital types in which the head nurse were working. (p <0.01). And as a operational manager, there is a significant difference of role conflict in educational levels. (p <0.01).

  • PDF

An Operation Scheduling of Transporters Considering Turns and Passing Delay at the Intersection Roads on the Shipyard (교차로 구간 회전 및 감속을 고려한 트랜스포터 최소 공주행 운영계획)

  • Moon, Jong-Heon;Ruy, Won-Sun;Cho, Doo-Yeoun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.54 no.3
    • /
    • pp.187-195
    • /
    • 2017
  • The operation planning of transports used to move blocks is the one of key factors. Furthermore, reducing the running time through the effective plan contributes to pulling forward the whole logistic process of the shipyard and substantially saving the fuel consumption of itself as well. The past researches of the transporter focused on finding only the shortest distances, so called, Manhattan distance. However, these searching approaches cannot help having the significant difference in the real operational time and distance with the minimum cost approach which considers the speed retardation for turns or safety at the intersection. This study suggests the noble transporter's operational model which could take account of the consuming operational time around the crossroads on the shipyard. Concretely, the proposed method guarantees the minimization of transporters' turns and passage number which are huge burdensome to the operation time and the whole planning of transports with the given period. Resultantly, this paper is willing to explain the appropriateness of our approach, compared with the previous ones.

Provisioning Quantity Determination of Consumable Concurrent Spare Part Under Availability Constraint and Cannibalization Allowed (운용가용도 제약하에서 동류전용이 허용될 때 소모성 동시조달부품의 적정구매량 결정)

  • Oh, Geun-Tae;Na, Yoon-Kyoon;Kim, Myung-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.199-207
    • /
    • 2010
  • In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of the failed part is impossible and the part is replaced and cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the operational availability in CSP is defined. The solution procedure consists of two parts. Firstly, a heuristic algorithm is developed under the assumption that the failure rate is constant during the CSP period. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time. An illustrative example is shown to explain the solution procedure.