• 제목/요약/키워드: Operational Cost

검색결과 877건 처리시간 0.029초

인더스트리얼 캐리어를 위한 선대운영의 최적화에 관한 연구 (A Study on the Optimization of Fleet Operation for Industrial Carriers)

  • 김시화;곽민석
    • 한국항해학회지
    • /
    • 제22권4호
    • /
    • pp.1-14
    • /
    • 1998
  • There are three basic modes of operation of ships: liner, tramp and industrial operations. Industrial operations, where the owner of the cargo, i.e. the industrial carrier controls the ships, abound in the shipment of bulk commodities, such as oil, chemicals and ores. Industrial carriers strive to minimize the shipping cost of their cargoes. This paper is concerned with the operational optimization problem of a fleet owned by major international oil company. The major oil company is a holding corporation for a group of oil producing, transporting, refining, and marketing companies located in various countries throughout the world. The operational optimization problem of the fleet is divided into two-phases. The front end corresponds to the optimization of transporting crude oil, product mix, and the distribution of product oil to meet market demand. The back end tackles the operational optimization problem of the fleet to meet the transportation demand derived from the front end. A case study is carried out with the H major oil company problem composed by reflecting the practices of an international major oil company. The results are summarized and examined in the point of optimization for the total operation of the H major oil company and the operational optimization problem of the fleet. The paper concludes with the remark that the results of the study might be useful and applicable in practices of these related decision problems.

  • PDF

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

장기간의 항만 폐쇄와 일시적 운영 중단이 직립 방파제 케이슨의 최적 설계에 미치는 영향 (Effects of Long-Term Harbor Shutdown and Temporal Operational Stoppage upon Optimal Design of Vertical Breakwater Caisson)

  • 서경덕;김덕래;김경숙
    • 한국해안해양공학회지
    • /
    • 제19권2호
    • /
    • pp.113-127
    • /
    • 2007
  • 본 연구에서는 직립 방파제 케이슨의 활동에 따른 복구비용, 과도한 케이슨 활동 발생시 항만 폐쇄에 따른 경제적 피해 비용 그리고 월파에 의한 일시적 작업 중단에 따른 경제적 피해 비용을 동시에 고려하는 기대 총 건설비 산정 모델을 수립하였다. 발생시점이 서로 다른 피해 비용을 일정한 기준으로 산정하기 위해 할인율을 적용하였다. 케이슨의 최적 단면은 방파제 수명 동안의 기대 활동량의 허용범위 내에서 기대 총 건설비용이 최소가 되는 단면으로 정의되며, 그 기대 활동량의 허용치는 0.3 m와 0.1 m 두 가지 경우에 대해 살펴보았다. 과도한 케이슨 활동에 의한 항만 폐쇄에 따른 경제적 피해 비용과 그 산정 기준이 케이슨 복구비용이나 월파에 의한 작업 중단에 따른 경제적 피해 비용보다 최적 단면 결정에 더 중요한 요인임을 확인하였고, 항만 폐쇄에 대한 케이슨 활동량의 임계 칼이 커질수록 케이슨의 최적 단면은 기대 총 건설비의 최소점보다 기대 활동량의 허용치에 의해 결정되는 것으로 나타났다.

해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구 (A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model)

  • 원종남;문원식;허재선;김재철
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

웹기반 온라인 전기에너지 공급지장비 추정 및 정보 시스템의 개발 (Web based Online Outage Cost Assessment and Information System of Electrical Energy)

  • 임진택;최재석;전동훈;서철수;이재걸
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1249-1259
    • /
    • 2012
  • This paper proposes a Web Based Online Outage Cost Assessment and Information System(WOOCAIS) for power system outage cost assessment. The proposed WOOCAIS is a kind of web based survey method for outage cost assessment. While conventional survey methods have done outage cost assessment based on survey paper lists collected by post mail or visiting customers, the proposed WOOCAIS is a web based online survey operation and assessment system. Therefore, it can curtail expenditure for survey and also is more convenient than conventional method. It will be set up for actual outage cost assessment system of KEPCO in South Korea in the near future. The WOOCAIS will be applied in various research and actual planning and operation areas. First of all, the assessed results may be not only applied as one of objective function for generation system and grid expansion but also operational planning problems in power system.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

Vertical Type Organic Transistors and Flexible Display Applications

  • Kudo, Kazuhiro
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2007년도 7th International Meeting on Information Display 제7권1호
    • /
    • pp.168-169
    • /
    • 2007
  • Organic transistors are promising in the future development of active devices for flexible, low-cost and large-area photoelectric devices. However, conventional organic field-effect transistors have lowspeed, low-power, and relatively high operational voltage. Vertical type transistors show high-speed and high-current characteristics and are suitable for driver elements of flexible displays.

  • PDF

태양광발전원의 확률론적인 발전비용 산정에 관한 연구 (A Study on Probabilistic Production Costing for Solar Cell Generators)

  • 박정제;최재석
    • 전기학회논문지
    • /
    • 제58권4호
    • /
    • pp.700-707
    • /
    • 2009
  • The application of renewable energy in electric power systems is growing rapidly in order to make provision for the inequality of the climate, the dwindling supplies of coal, oil and natural gas and a further rise in oil prices. Solar cell generators(SCG) is one of the fastest growing renewable energy. This paper presents a methodology on probabilistic production cost simulation of a power system including SCGs. The generated power by SCGs is variable due to the random variation of solar radiation. In order to solve this problem, the SCGs is modeled as multi-state operational model in this paper. Probabilistic production cost of a power system can be calculated by proposed method considering SCGs with multi-state. The results show that the impacts of SCGs added to a power system can be analyzed in view point of production cost using the proposed method.

효과적인 PM 업무를 위한 RCM분석대상 시스템의 선정 (The selection of RCM analysis system for efficient PM Tasks)

  • 김민호;송기태;백영구;이기서;윤화현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.784-791
    • /
    • 2007
  • Most operational organization and railway authority which conduct scheduled maintenance(SM) have carried out the preventive maintenance(PM) based on the information provided from supplier and manufacturer of railway system. However these activities are far away from reality and low the efficiency, it is because an appropriate methods for system selection didn't take into account for improving maintenance efficiency. Therefore, the current SM tasks and maintenance activities lead to lots of spend on the cost and time. To solve the above problem, this thesis presents new approach methodology. This proposes the criteria for reliability centered maintenance(RCM) system selection through level of quantification of each parameter, i.e, frequency, severity and maintenance cost, etc. To do this, the field operation data and information of maintenance cost are essential. As applying this methodology, we can look forward to improving efficiency of PM/SM, and reducing cost.

  • PDF

열병합시스템 경제성 평가 프로그램의 개발 및 적용에 관한 연구 (Development and Application of an Economic Assessment Program of Cogeneration Systems)

  • 박차식;김용찬
    • 대한기계학회논문집B
    • /
    • 제22권11호
    • /
    • pp.1547-1554
    • /
    • 1998
  • The object of this study was to develop an economic assessment program for the optimal design of the cogeneration systems composed of combining engine, generator, waste heat recovery exchanger, absorption chiller, and boiler, etc. The energy demand categorized by electric power, heating, cooling and water supply was determined by statistical data of the existing cogeneration systems. An economic assessment was performed by comparing the total cost of cogeneration system with that of non-cogeneration system. The total cost was evaluated by adding initial investment to operational cost considering efficiency of equipment, cost of equipment, fuel and electricity. To confirm the validity of the developed program, a hotel building with an area of $127,960m^2$ was selected, and the simulated results were compared with the measured data. The difference between the simulated and the measured values for the selected hotel building was approximately 12% for annual electric consumption.