• Title/Summary/Keyword: Operation method

Search Result 12,478, Processing Time 0.049 seconds

Integrated Job Shop Scheduling considering Alternative Machines and Operation Sequence (대체기계와 공정순서를 고려한 Job Shop에서의 통합 일정계획)

  • 최형림;박병주;박용성;강무홍
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.85-88
    • /
    • 2003
  • In case that any jobs in a Job Shop can be scheduled on more than one machine and may have flexible operation sequences, with considering such case it is very difficult and complex to make the optimal process plans and scheduling. But they should be considered for an integrated model to perform more effective process planning and scheduling in this job shop problem. In this paper, we propose GA-based scheduling method to integrate effectively the problem of alternative machines, alternative operation sequences and scheduling. The performance of proposed GA is evaluated through comparing integrated scheduling with not integrated scheduling in molding company with alternative machines and operation sequences. Also, we use benchmark problems to evaluate performance. The scheduling method in this research will apply usefully to real world scheduling problems.

  • PDF

A Study on Turbine Control and Turbine Bypass Control during Startup of Thermal Power Plants (화력발전소 기동시 터빈 바이패스 시스템과 터빈 제어에 관한 고찰)

  • Choi, In-Kyu;Park, Doo-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1664_1665
    • /
    • 2009
  • Many years ago, most of thermal power plants built in this country were of subcritical pressure, of medium or small size, of constant pressure operations and of drum type steam generators with circulation type boilers. But, nowadays almost all of them were of high efficiency, of supercritical pressure, of big capacity, of sliding pressure operations, and of once through type steam generator. It has such advantage as the reduction of startup duration, but it control system and operation method are very complicated. It has a big difference in operation method of turbine and boiler. The feedforward control needs to be introduced to prevent such problems as thermal shock during the transit from normal operation into bypass operation. This paper introduces the turbine control and turbine bypass control during startup of thermal power plants.

  • PDF

Current Control Method of WRSM in High-speed Operation Range

  • Lee, Jae-Jun;Lee, Ki-Doek;Jang, Ik-Sang;Lee, Sung-Gu;Chae, Woong-Chan;Lee, Hyung-Woo;Lee, Ju
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.5
    • /
    • pp.2052-2056
    • /
    • 2015
  • This Paper analyzes the characteristics of the WRSM in high-speed operation range. To verify the control characteritics of various WRSM models, the relative position of the central point of current limit circle and voltage limit ellipse is defined as M value and 3 models according to Mmax value are designed through inductance change. Through the designed models, the current control method of 3-variables control for maximum power especially in high-speed operation range is presented.

An Application of Optimization method for Efficient Operation of Micro Grid (마이크로그리드의 효율적 운영을 위한 최적화기법의 응용)

  • Kim, Kyu-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.12
    • /
    • pp.50-55
    • /
    • 2012
  • This paper presents an application of optimization method for efficient operation in micro grid. For operational efficiency, the objective function in a diesel generator consists of the fuel cost function similar to the cost functions used for the conventional fossil-fuel generating plants. The wind turbine generator is modeled by the characteristics of variable output. The cost function of fuel cell plant considers the efficiency of fuel cell. Particle swarm optimization(PSO) and sequential quadratic programming(SQP) are used for solving the problem of microgrid system operation. Also, from the results this paper presents the way to attend power markets which can buy and sell power from upper lever grids by connecting a various generation resources to micro grid.

An Integrated Model for Simultaneous Formation of Machine Cells and Part Families in FMS : Using Machine- Operation Incidence Matrix and Part - Operation Incidence Matrix (FMS에서 기계셀과 부품그룹의 동시형성을 위한 통합모형 : 기계-공정 빈도행렬과 부품-공정 빈도행렬의 이용)

  • 정병희;윤창원
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.1-17
    • /
    • 1995
  • The success of cell manufacturing applications in FMS rests on the effective cell formation to maintain the independent relations both between machine cells and between part families. This paper presents an integrated method for concurrent formation of cells and families with no E.E (Exceptional Element) in FMS with alternative routings. To determine the maximum number of cell and family with no E.E, mathematical conditions and properties are derived. New concept of nonsimilarity is introduced for each machine and part based on machine-operation incidence matrix and part-operation incidence matrix. To concurrently form the cells and families, integer programming based mathematical models are developed. For the predetermined number of cell or family, model I is used to identify whether E.E exists or not. Model II forms cells and families considering only nonsimilarity. But model III can consider nonsimilarity and processing times. The proposed method is tested and proved by using numerical examples.

  • PDF

UPFC Operation Strategy for Enhancement of System Security (안전도 향상을 위한 UPFC 운전 전략)

  • Lee, Dong-Woo;Ahn, Seon-Ju;Moon, Seung-Il;Yoon, J.S.;Chang, B.H.;Kim, S.Y.;Moon, S.P.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.177-178
    • /
    • 2006
  • The enhancement of system security is one of the most important objectives of UPFC operation. To describe the system security, the index related to line flows and bus voltages are used. For the enhancement of security, the operation point of UPFC is set to minimize the index. This paper proposes the minimization algorithm using the Marquardt method. Moreover, the coefficients minimizing iteration number will be derived. For verification of the proposed operation scheme, numerical simulations have been performed on power system in Kwanju area, Korea with a UPFC.

  • PDF

The Stablized Control Method for The Voltage Source Inverter Fed Induction Motor Driver (전압형 인버터로 구동되는 유도기의 안정화 제어)

  • Ro, S.C.;Lee, H.W.;Lee, O.G.;Woo, J.I.
    • Proceedings of the KIEE Conference
    • /
    • 1989.07a
    • /
    • pp.567-570
    • /
    • 1989
  • A constant V/F control system of voltage contrlled PWM inverter has a unstable operation of the low- speed and the light-load. In this paper, the authors propose stability control with idealized operation of induction motor by the neglect of primary leakage inductance and resistance. Also ldealized operation system is adopted voltage error, feed back impedance circuit, and increasing resistance from dead time of switching is compensated by the soft ware with u-processors. The proposed simulation of the idealized control method is proved at the low-speed operation for three phase induction motor.

  • PDF

Investigation on Noise Characteristics of Pile Driving Operation and Design of a Low-noise Pile Cap Based on the Scale Model Experiment (항타공법에 의한 발생 소음 특성 분석 및 축소 모형 실험을 이용한 저소음 말뚝 캡의 설계)

  • 이종화;이정권;이기홍;정승창
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.445-448
    • /
    • 2001
  • Noise radiated from pile driving operation is one of major sources of community noise pollution and thus its operation method is strictly restricted by regulations. Although the drilling method is now used been commonly used in urban areas because of its activity, the benefit of low noise decreases due to high working cost. In the present work, noise characteristics of pile driving operation are carried out. Based on the study result, a low-noise pile cap for driven piles is developed in order to satisfy both the noise level restriction and the economical efficiency. Effects of pile cap are investigated by a scale model experiment, which is focused on the variation of impact force and sound pressure level. The results show a good possibility of noise reduction by an appropriately designed pile cap.

  • PDF

Implementation of Dual Cycle in Container Yard based on Ad-hoc Networks (Ad-hoc 네트워크 기반의 컨테이너장치장의 Dual Cycle 구현)

  • Park, Doo-Jin
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.4
    • /
    • pp.998-1007
    • /
    • 2013
  • At container terminals, a major measurement of productivity can be work efficiency. For improving the productivity of container crane, the more efficient container yard operation method is necessary in container terminals. Recently, container terminal operators make an experiment on the dual cycle operation, which ship loading/unloading were carried out simultaneously, for increasing the productivity of container crane. In this paper, propose a system operating efficient dual cycle methods as utilize Ad-hoc technology in distributed port operation system. The dual cycle methods that proposed recognizes position information of Y/T during an action in Ad-hoc networks in case of container transfer works by real time as load an Ad-hoc module to Y/T taking charge of a container transfer with quay and yard. Utilize Ad-hoc networks technology in an operating system of container yard, and efficiently distributed processing done Y/T to container crane compare with operation systems of the existing dedicated method, and an improvement can do an operating system of an yard.

A Daily Operation Scheduling of Total Cogeneration System Connected with Auxiliary Devices of Different Posession Right (소유권이 서로 다른 각종 보조설비가 연계된 종합 열병합발전 시스템의 일간운전계획 수립)

  • 이종범;류승헌
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.81-88
    • /
    • 1998
  • This paper describes the method decide to optimal sizing and operation scheduling of total cogeneration system which is interconnected with cogeneration unit of utility and auxiliary thermal devices of heating company. Optimal sizing and operation scheduling is established in order to minimize the fuel cost under national viewpoint. Simulations are carried out to show the reliability of method suggested by seasons and kinds. The simulated results can be effectively used as the guideline of operation scheduling between the utility and the heating company.

  • PDF