• Title/Summary/Keyword: Operation limit

Search Result 874, Processing Time 0.026 seconds

A Study on Operation Method of Power Distribution System Integrated with Dispersed Generation System (분산형전원이 도입된 복합배전계통의 운용방안에 대한 고찰)

  • Kim, Jae-Eon;Jo, Seong-Hyeon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.6
    • /
    • pp.692-698
    • /
    • 1999
  • This paper analyzes the effect of DGS(Dispersed Generation System) on the voltage regulation of the traditional distribution system of which the voltage is controlled by the bank LDC(Line Drop Compensator). Through the simulation results for 22.9kV class distribution system with DGSs, some general relationships among the operating power factor and introduction limit of DGS, and the sending-end reference voltage determined by internal setting coefficients of the LDC are derived. Those relationships are that the introduction limit of DGS increases as the power factor of DGS goes from lagging to leading and also as the allowance of the sending-end reference voltage increases. From the relationships, a operation method of the power distribution system integrated with DGSs is proposed from the view point of the operating power factor of DGS and new voltage regulation method.

  • PDF

A study of control system on Permanent Magnet Linear Synchronous Motor with Z-axis operation structure (Z축 운전구조를 갖는 선형 영구자석형 동기 전동기 운전제어에 관한 연구)

  • Lee C.H.;Choi C.;Park H.W.;Kim C.U.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07b
    • /
    • pp.654-658
    • /
    • 2003
  • In this study a control system with variable gain schedule using real speed and moving direction is proposed to control a Permanent Magnet Linear Synchronous Motor (PMLSM) with Z-axis operation structure. The implementation of the controller is designed on the DSP TMS320C32 board. PMLSM is operated by using 4-point absolute positions profile with each velocity, acceleration and deceleration. The direction of the initial angle action for starting is set from the lower limit point to the upper limit point on PMLSM operation stroke. The effectiveness of a control system with variable gain schedule is demonstrated by some experimental results.

  • PDF

Development of Display Content for Overload Prevention in the Crane Controller (크레인 컨트롤러에서의 전도방지를 위한 디스플레이 콘텐츠 개발)

  • Lee, Sang Young
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.3
    • /
    • pp.87-95
    • /
    • 2012
  • Up to now, industrial cranes play important roles as the effective machines to carry heavy loads in the manufacturing premise, in the construction field and so on. And, a crane is widely used not only to daily work but also to carry heavy materials efficiently in a construction site for prevention of accident. However, the crane operation is highly complicated even for experts. In this paper, we developed the content of the crane mounted on the controller. This content overload conditions in the operating environment for the crane operator to warn, and the operation of equipment has the capability to limit automatically. The content for crane controller is to alert the operator overload and to limit the operation of equipment for stabilizing capabilities. The content of the flexible algorithm is based on stabilizing controllers, PLC (Programmable Logic Controller) to connect for using the equipment and electrical control systems to ensure the safety of workers and to improve the ability to work possible.

A study on the operation performance control of urban rail vehicle using an optimal control (최적제어를 이용한 도시철도 차량 주행제어 연구)

  • Tak Kil Hun;Kim Dong-Hwan;Kim Chi Tae
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.107-112
    • /
    • 2005
  • When it comes to automatic operation control of urban rail vehicle, a PID control makes it run between stations within the fixed time and stop exactly at the stop sign on the platform, satisfying jerk limit. An optimal control is applied to automatic operation performance control to minimize energy consumption while the urban rail vehicle satisfies automatic operation condition on this paper. The control performance in terms of energy minimization along with the constraint on precision stops is compared between the optimal control and PID control.

  • PDF

Characteristic of Current and Temperature according to Normal and Abnormal Operations at Induction Motor of 2.2 kW and 3.7 kW (2.2 kW와 3.7 kW 유도전동기의 정상과 구속운전에 따른 전류 및 온도 특성)

  • Jong-Chan Lee;Doo-Hyun Kim;Sung-Chul Kim
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.35-42
    • /
    • 2023
  • This study analyzed the current and temperature characteristics of major components of an induction motor during normal and abnormal operations as functions of the difference in the rated capacities of medium and large-sized motors widely used in industrial settings. The temperature rise equation of the induction motor winding was derived through locked-rotor operation experiments and linear regression analysis. When the ambient temperature is 40 ℃, the time to reach 155 ℃, the temperature limit of the insulation class (F class) of the winding of the induction motor, was confirmed to be 48 seconds for the 2.2 kW induction motor and 39 seconds for the 3.7 kW induction motor. This means that when the rated capacity is large or the installation environment is high temperature, the time to reach the temperature limit of the insulation class during locked-rotor operation is short, and the risk of insulation deterioration and fire is high. In addition, even if the EOCR (Electronic Over Current Relay) is installed, if the setting time is excessively set, the EOCR does not operate even if the normal and locked-rotor operation of the induction motor is repeated, and the temperature limit of the insulation grade of the winding of the induction motor is exceeded. The results of this study can be used for preventive measures such as the promotion of electrical and mechanical measures for the failure of induction motors and fire prevention in industrial sites, or the installation of fire alarm systems.

A Study on the Transformer Spare Capacity in the Existing Apartments for the Future Growth of Electric Vehicles (전기자동차 보급에 따른 기존 아파트의 변압기용량 한계시점에 대한 연구)

  • Choi, Jihun;Kim, Sung-Yul;Lee, Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.1949-1957
    • /
    • 2016
  • Rapid Expansion of EVs(Electric Vehicles) is inevitable trends, to comply with eco-friendly energy paradigm according to Paris Agreement and to solve the environment problems such as global warming. In this paper, we analyze the limit point of transformer acceptable capacity as the increase of power demand considering EVs supply in the near future. Through the analysis of transformer utilization, we suggest methods to analyze the spare capacity of transformer for the case of optimal efficiency operation and emergency operation respectively. We have the results of 18.4~29% spare capacity for the charging infrastructure to the rated capacity of transformer by analyzing the existing sample apartments. It is analyzed that the acceptable number of EVs is 0.09~0.14 for optimal efficiency operation and 0.06~0.13 for emergency operation. Therefore, it is analyzed the power demand of EV will exceed the existing transformer spare capacity in 7~8 years as the annual growth rate of EVs is prospected 112.5% considering current annual growth rate of EVs and the government EV supply policy.

Design and Implementation of EMS for Real-Time Power Generation Control of Wind Farm Based on Wake Effect Optimization (후류 영향 최적화 기반 실시간 풍력발전단지 발전 제어용 EMS의 설계 및 구현)

  • Kim, Joon-Hyoung;Sung, Ki-Won;Jung, Sung-Hwan
    • Journal of Korea Multimedia Society
    • /
    • v.25 no.8
    • /
    • pp.1097-1108
    • /
    • 2022
  • This paper aimed to design and implement an EMS for real-time power generation control based on wake effect optimization of wind farm, and then to test it in commercial operating wind farm. For real-time control, we proposed the wake band-based optimization and setting the wake effect distance limit, and when the wake effect distance limit was set to 7D in the actual wind farm layout, the calculation time was improved by about 93.94%. In addition, we designed and implemented the script-based EMS for flexible operation logic management in preparation for unexpected issues during testing, and it was installed and tested on a wind farm in commercial operation. However, three issues arose during the testing process. These are the communication interface problem of meteorological tower, the problem of an abnormal wake effect, and the problem of wind turbine yaw control. These issues were solved by modifying the operation logic using EMS's script editor, and the test was successfully completed in the wind farm in commercial operation.

The Calculation Method with index for the Transfer Power limit to Capital Area (지수를 적용한 수도권 융통전력한계량 계산)

  • Lee, Woon-Hee;Kang, Myung-Jang;Song, Suk-Ha
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.50-52
    • /
    • 2008
  • We have limited the transfer power to capital area below a certain level which is called "The Capital Area Transfer Power Limit", and calculated on every Thursday for the application next week. This level is very important in our network operation, because if this level is not set properly, our power network can be fallen under great danger in case of a fault among the transfer power line. But the calculation procedure for the limit level is so complicated and iterative that it mace us spend much time and do much work. So, when a sudden trip of the related facility to the limit level we can't recalculate the limit level fast enough. And this can drop our network reliability below our standards, therefore our network can be dangerous. To avoid this kind of problems, we have figured out a method to calculate simply the limit level. That method uses the index related to the level. We think this method can make short of the calculation procedures for the level. This paper deals with the simplified method for the calculation of the level limit.

  • PDF

Forming Limit Prediction in Tube Hydroforming Processes by Using the FEM and FLSD (유한요소법과 FLSD를 이용한 관재 하이드로포밍 공정에서의 성형 한계 예측)

  • Kim S. W.;Kim J.;Lee J. H.;Kang B. S.
    • Transactions of Materials Processing
    • /
    • v.14 no.6 s.78
    • /
    • pp.527-532
    • /
    • 2005
  • Among the failure modes which can occur in tube hydroforming such as wrinkling, bursting or buckling, the bursting by local instability under excessive tensile stresses is irrecoverable phenomenon. Thus, the accurate prediction of bursting condition plays an important role in producing the successfully hydroformed part without any defects. As the classical forming limit criteria, strain-based forming limit diagram (FLD) has widely used to predict the failure in sheet metal forming. However, it is known that the FLD is extremely dependant on strain path throughout the forming process. Furthermore, The application of FLD to hydroforming process, where strain path is no longer linear throughout forming process, may lead to misunderstanding for fracture initiation. In this work, stress-based forming limit diagram (FLSD), which is strain path-independent and more general, was applied to prediction of forming limit in tube hydroforming. Combined with the analytical FLSD determined from plastic instability theory, finite element analyses were carried out to find out the state of stresses during hydroforming operation, and then FLSD is utilized as forming limit criterion. In addition, the approach is verified by a series of bulge tests in view of bursting pressure and shows a good agreement. Consequently, it is shown that the approach proposed in this paper will provide a feasible method to satisfy the increasing practical demands for judging the forming severity in hydroforming processes.