NSSS Control Systems automatically mitigate transient conditions and leads to a stable plant condition without operator actions when a transient occurs during normal power operation. In this paper, the function and performance of NSSS control systems were examined and evaluated by comparing the predicted results with the measured data for the selected events. Loss of a Main Feedwater Pump and Load Rejection to House Load Operation events were selected for the evaluation among the transient tests peformed during the Power Ascension Test (PAT) of UCN unit 4. The overall schematic control actions of NSSS control systems can be evaluated easily through the observation of these two typical events. The selected events were analyzed by the KISPAC computer code[l] which had been used in developing the control logic and determining the control setpoints during the plant design. Additionally, the performance of FWCS during low power operation was evaluated. The result of evaluation showed that the NSSS control systems were designed properly and the performance of the NSSS control systems was excellent and also the computer code had a good prediction capability.
This paper presents a method of the voltage-reactive power control in the long and short range operations and introduces a conception, "optimum control pattern." The optimum control pattern, aiming at the over-all system control, is defined as the optimum voltage distribution which minimizes the system operating cost under the conditions that the specified power be supplied and the system voltage be kept within the specified bounds. The following procedure was adopted to obtain this optimum pattern. In the first place, a power system was divided into three blocks, namely, load, substation and generator. Lagrange's, multiplier method is applied to each block in turn, paying attention only at the operating voltage distribution. Phase angles at each bus are then modified so that the continuity of active power is maintained. This procedure may be called "block relaxation method with Lagrange's multipliers." In a long range operation, this control pattern determines the optimum installation capacity of reactive power sources. In a short range operation, it also gives the reference state of real time control and the optimum switching capacity of reactive power souces. The real time control problem is also studied from the standpoint of cooperation of control devices such as generators, shunt capacitors, shunt reactors and ratio load controllers. A proposal for the real time control will contribute to the automation of power system operation in the near future. in the near future.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.16
no.4
/
pp.351-357
/
2003
An easy learning elevator originated is opened to compare the existed teaming equipment, and it had a high studied efficiency that the sequence control circuit can open and close with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demostrated by the constructive apparatus with the lamps to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward reverse breaker and the motor of load, and the mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connect each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequently the cage could go and come till 1∼5 steps with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of L/S1 ∼ L/S5 let posit with the control switchs of S/W1 ∼ S/W5 of PLC testing panel and switchs of S/W1 ∼ S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is the hand-auto operation combined learning equipment to study the principle and technique of the originate sequence control circuit and the auto program of PLC.
Youn-chul Choi;Yong-tae Jung;Young-jin Cho;Do-hyun Kim;Won-hyuk Choi;Yoon-Su Park
Journal of Advanced Navigation Technology
/
v.27
no.2
/
pp.173-181
/
2023
Aircraft carriers need to maintain an orderly flow of aircraft in order for military ships to conduct combat through aircraft. Maintaining aircraft flow is an important factor in strengthening ship and aviation safety. In order to maintain aircraft flow, it is essential to develop a state-of-the-art air control system that provides higher quality control information by simultaneously accommodating radar-based monitoring information and monitoring information based on CNS integrated technology. Based on this point, this study describes the function and operation method of specific control equipment for the operation of the Aviation Support System and Air Traffic Control System required to operate light aircraft carriers in Korea based on overseas cases.
In this paper, the cooperative control scheme of micro sources and an ESS (Energy Storage System) during islanded operation is presented and evaluated by a simulation study. The ESS handles the frequency and voltage as a primary control. Then, the secondary regulation control returns the cur-rent power output of ESS into a pre-planned value. The simulation's results show that the proposed co-operative control scheme can regulate the frequency and voltage and reduce the consumption of the stored energy of ESS.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.10
/
pp.1672-1681
/
2016
This paper proposes a wireless parallel operation method of three-phase modular UPS inverter using resistive droop control. Furthermore, it applies a virtual resistor to droop control so that the output impedance of UPS inverter gets closer to resistive. It makes resistive droop control effective. The simulation using PSIM was performed in order to verify the validity of proposed algorithm. After consisting two-parallel system with three-phase modular UPS inverter, the experiment according to resistive load was conducted. It demonstrated the performance of current sharing and power sharing.
Critical conduction mode (CRM) operation is more efficient than continuous conduction mode (CCM) operation at low power levels because of the valley switching of switches and elimination of the reverse recovery losses of boost diodes. When using a sensorless digital control method, an error occurs between the actual and the estimated current. Because of the error, it operates as CCM or discontinuous conduction mode (DCM) during CRM operation and also has an adverse effect on THD of input current. In this paper, a current sensorless technique is presented in an inverter system using a bridgeless boosted power factor correction converter, and a compensation method is proposed to reduce CRM calculation error. The validity of the proposed method is verified by simulation and experiment.
Kim Young-Hoon;Hong Soon-Heum;Jung Tae-Un;Ahn Jin;Kim Ryu-ho;Park Sung-Kyu
Proceedings of the KSR Conference
/
2004.06a
/
pp.528-533
/
2004
The purpose of this thesis is to construct the autonomous decentralized train traffic management structure using techniques of Autonomous Decentralized System. Currently, a method of train traffic control is making use of CTC(Centralized Traffic Control). Its operation method is divided into the remote mode and the local mode. The classified basis is according to the control authority of install signals in track side. In most cases, a large scale station is operated by the local mode. Because of dispatchers in center can not control the shunting works influence on the main route. In order to solve these problem s, we analyzed a current operation condition and system requirements. Moreover, this thesis is constructing autonomous decentralized train traffic management structure. Finally, this research proposed that interface with CTC and step-by-step construction.
Journal of Institute of Control, Robotics and Systems
/
v.5
no.2
/
pp.145-150
/
1999
A real-time control system, composed of the controlled processor and the controller computer(s), may have a variety of task types, some of which have tight timing-constraints in generating the correct control input. The maximum period of those task failures tolerable by the system is called the hard deadline, which depends on not only fault characteristics but also task characteristics. In the paper, we extend a method deriving the hard deadline in LTI system executing single task. An algorithm to combine the deadlines of all the elementary tasks in the same operation-mode is proposed to derive the hard deadline of the entire system. For the end, we modify the state equation for the task to capture the effects of task failures (delays in producing correct values) and inter-correlation. We also classify the type of executing the tasks according to operation modes associated with relative importance of correlated levels among tasks, into series, parallel, and cascade modes. Some examples are presented to demonstrate the effectiveness of the proposed methods.
This paper explores design and control methods of a surgical robot for total hip replacement surgery which can be easily maneuvered by a surgeon Like an advanced surgical tool. The 3-DOF in-parallel surgical robot is fixed directly onto patient's femur by the bone clamp during surgery. With the master/slave combined surgical robot, the surgeon can directly control the motion of the surgical robot with surgeon's experience and judgment during operation. For the easiness of operation, the master/slave combined robot is controlled using admittance control paradigm. And for the precise operation, the robot motion is restricted at the surgical boundary using virtual hard wall display.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.