• Title/Summary/Keyword: Operation Research

Search Result 12,853, Processing Time 0.047 seconds

Protection for a Wind Turbine Generator in a Large Wind Farm

  • Zheng, Tai-Ying;Kim, Yeon-Hee;Kang, Yong-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.4
    • /
    • pp.466-473
    • /
    • 2011
  • This paper proposes a protection algorithm for a wind turbine generator (WTG) in a large wind farm. To minimize the outage section, a protection relay for a WTG should operate instantaneously for an internal fault or a connected feeder fault, whereas the relay should not operate for an internal fault of another WTG connected to the same feeder or an adjacent feeder fault. In addition, the relay should operate with a delay for an inter-tie fault or a grid fault. An internal fault of another WTG connected to the same feeder or an adjacent feeder fault, where the relay should not operate, is determined based on the magnitude of the positive sequence current. To differentiate an internal fault or a connected feeder fault from an inter-tie fault or a grid fault, the phase angle of the negative sequence current is used to distinguish a fault type. The magnitude of the positive sequence current is then used to decide either instantaneous operation or delayed operation. The performance of the proposed algorithm is verified under various fault conditions with EMTP-RV generated data. The results indicate that the algorithm can successfully distinguish instantaneous operation, delayed operation, or non-operation depending on fault positions and types.

Virtual Analysis of the Remote Operation of the ACP

  • Yoon Ji sup;Kim Sung Hyun;Song Tai Gil;Lim Kwang-Mook
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11b
    • /
    • pp.60-75
    • /
    • 2005
  • The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance method needs to be provided. To provide such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in a computer, not in a real environment. In this way the graphic simulator can substantially reduce the design cost of the remote operation process and the equipment. Also it can provide new operation concept that is more reliable, easier to implement, and easier to understand.

  • PDF

Research Analysis Related to Research Trends and the Operation Status of Childcare Curriculum for 0 to 2 Year-Olds: Based on Research After the 3rd Standard Childcare Curriculum (영아보육과정의 연구동향 및 운영실태 관련 연구 분석: 제3차 표준보육과정 시행 이후 연구를 바탕으로)

  • Kim, Sejin
    • Korean Journal of Childcare and Education
    • /
    • v.17 no.3
    • /
    • pp.1-17
    • /
    • 2021
  • Objective: The objective of this study is to investigate the tendency of research in relation to childcare curriculum for 0 to 2 year-olds, and then to analyze and understand the results of precedent research about the status of the operation of Childcare Curriculum. Methods: The analytic data utilized in this research contains a total of 45 research results about childcare curriculum for 0 to 2 year-olds. Results: First, the research methods were focused on quantitative research. Regarding research topics, the status of the operation of Childcare Curriculum, and contents and programs of Childcare Curriculum received high attention. Second, while, childcare teachers showed an awareness of the Childcare Curriculum, they made few efforts to investigate and understand it in depth. It was reported that a lack of multiple support systems would serve as an obstacle to the operation of Childcare Curriculum. Conclusion/Implications: There is a need for childcare centers, academic circles and the government to pay an even greater deal of attention to the childcare curriculum for 0 to 2 year-olds. In addition, structural and policy support is required, such as revitalizing case-based teacher training, lowering the ratio of teachers to children, and improving working conditions for infant teachers.

LRIT DESIGN OF COMS

  • KOO In-Hoi;PARK Durk-Jong;SEO Seok-Bae;AHN Sang-Il;KIM Eun-Kyou
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.305-308
    • /
    • 2005
  • The COMS, Korea's first geostationary multipurpose satellite program will accommodate 3 kind of payloads; Ka-Band communication transponder, GOCI (Geostationary Ocean Color Imager), and MI (Meteorological Imager). MI raw data will be transferred to ground station via L-band link. The ground station will perform image data processing for raw data, generate them into the LRIT/HRIT format, the user dissemination data recommended by the CGMS. The LRIT/HRIT are disseminated via satellite to user stations. This paper shows the COMS LRIT data generation procedure based on COMS LRIT specification and its verification results using the LRIT user station.

  • PDF

GOES-9 Raw Data Acquisition & Image Extraction

  • Kang C. H.;Park D. J.;Koo I. H.;Ahn S. I.;Kim E. K.
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.582-585
    • /
    • 2005
  • The Geostationary Operational Environmental Satellite (GOES) 9, which is currently located at 155°E geostationary orbits, has transmitted earth observation data acquired by imager to CDA at NOAA. After the acquisition on ground, observation data are corrected on ground and re-transmitted to GOES-9 for the dissemination to users. In this paper, the procedure and result from raw data acquisition and pre-processing for earth observation imagery retrieval from GOES-9 Raw data acquired in Korea at May 2005 are introduced.

  • PDF

Analysis on Processing Timeline of COMS LHGS Design

  • Bae, Hee-Jin;Koo, In-Hoi;Seo, Seok-Bae;Ahn, Sang-Il;Kim, Eun-Kyou
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.216-219
    • /
    • 2006
  • This paper analyzes on LHGS (LRIT/HRIT Generation Subsystem) processing timeline for COMS LHGS design. The LHGS shall transmit LRIT/HRIT (Low Rate Information Transmission/ High Rate Information Transmission) data to the users within 15 minutes after the end of the image acquisition. So, this paper performs experiment using MTSAT-1R LRIT/HRIT (11 days) and calculates minimum LHGS processing time. Only HRIT FD (Full Disk) image is considered in this paper because data size of HRIT FD image is the largest. As a result of experiment, COMS LHGS should be able to receive MI Level 1B product within 157 seconds at least.

  • PDF

Transport Simulation of The Operation Modes in a KT-2 Tokamak

  • B. G. Hong;Lee, K. W.;Kim, S. K.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.05b
    • /
    • pp.1027-1032
    • /
    • 1995
  • To develop operation scenarios of KT-2 tokamak, 3 operation modes(OH, high ${\beta}$ and high bootstrap) deduced from zero dimensional steady-state power balance are examined with TSC(Tokamak Simulation Code) time-dependent transport .ode. Plasma profiles are evaluated self consistently during simulations and plasma shapes are maintained by feedback control on PF coil currents. Simulations show operation modes which are typical of KT-2 expected discharges are compatible with the KT-2 PF system design specifications[1].

  • PDF

The Design of MSC(Multi-Spectral Camera) Calibration Operation

  • Yong Sang-Soon;Kang Geum-Sil;Jang Young-Jun;Kim Jong-Ah;Kang Song-Doug;Paik Hong-Yul
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.601-603
    • /
    • 2004
  • Multi-Spectral Camera(MSC) is a payload on the KOMPSAT -2 satellite to perform the earth remote sensing. The instrument images the earth using a push-broom motion with a swath width of 15 km and a ground sample distance (GSD) of 1 m over the entire field of view (FOV) at altitude 685 Km. The instrument is designed to have an on-orbit operation duty cycle of $20\%$ over the mission lifetime of 3 years with the functions of programmable gain! offset and onboard image data compression/storage. MSC instrument has one(1) channel for panchromatic Imaging and four(4) channel for multi-spectral Imaging covering the spectral range from 450nm to 900nm using TDI CCD Focal Plane Array (FPA). In this paper, the configuration, the interface of MSC hardware and the MSC operation concept are described. And the method of the MSC calibration are described and the design of MSC calibration operation to measure the change of MSC after Launch & Early Operation(LEOP) and normal mission operations are discussed and analyzed.

  • PDF

A Study on the Bus Operation and the Strategy for Bus Transport Improvement (버스운행관리 및 수송전략에 관한 연구)

  • 배기목
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.123-130
    • /
    • 1999
  • The bus as a feeder trip should supply equality service to the whole community. But in spite of the change of latent demand to the bus by the variety of regional structural change, the existing bus route can not supply effective feeder service. For cope with the latent demand to the bus, this study establish a concept that frame of the bus operation and management. This study tackled to evidence this fact by analyzing the bus transport problems in terms of the urban growth, and following issues were discussed: 1) the strategy for improvement of bus operation, 2) the land use control which is appropriate for the public transport network, 3) the economical range to justify the bus operation, 4) the allowance for the private transport mode. On the second part of this study, the difference on the bus operation was compared to determine the range within which the bus operation can be justified. This would provide the direction to improve the management for bus operation and fundamental information to develop the bus operation system.