• Title/Summary/Keyword: Operation Interval Time

Search Result 292, Processing Time 0.025 seconds

Train Regulation by the Advanced Algorithm for Subway (개선된 알고리즘에 의한 지하철 운행간격 제어)

  • Park, Hong-Kyu;Shim, Won-Sup;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

A Scheduling Algorithm Using the Interval Graph (구간 그래프를 이용한 스케쥴링 알고리듬)

  • 김기현;정정화
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.31A no.1
    • /
    • pp.84-92
    • /
    • 1994
  • In this paper, we present a novel scheduling algorithm using the weighted interval graph. An interval graph is constructed, where an interval is a time frame of each operation. And for each operation type, we look for the maximum clique of the interval graph: the number of nodes of the maximum clique represents the number of operation that are executed concurrently. In order to minimize resource cost. we select the operation type to reduce the number of nodes of a maximum clique. For the selected operation type, an operation selected by selection rule is moved to decrease the number of nodes of a maximum clique. A selected operation among unscheduled operations is moved repeatly and assigned to a control step consequently. The proposed algorithm is applied to the pipeline and the nonpipeline data path synthesis. The experiment for examples shows the efficiency of the proposed scheduling algorithm.

  • PDF

A Temporal Relational Database:Modeling and Language

  • Kim, Jae-Kyeong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.2
    • /
    • pp.139-158
    • /
    • 1995
  • A temporal database systems provides timing information and maintains history of data compared to the conventional database system. In this paper, we present a temporal relational database which use an interval-stamping method for instant-based events and for interval-based states. A set of temporal algebraic operators are developed on an instance of time and interval of time so that we can manipulate events and states at a same time. The set of operation is the basis for creating a relational algebra that is closed for temporal relations. And temporal SQL is also suggested as a temporal query relational language for our algebraic operations on temporal relations.

  • PDF

Estimation of the Actual Working Time by Interval Linear Regression Models with Constraint Conditions (제약부 구간 선형 회귀모델에 의한 실동시간의 견적)

  • Hwang, S. G.;Seo, Y. J.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.14 no.2
    • /
    • pp.105-114
    • /
    • 1989
  • The actual working time of jobs, in general, is different to the standard time of jobs. In this paper, in order to analyze the actual working time of each job in production, we use the total production amount and the encessary total working time. The method which analyzes the actual working time is as follows. In this paper, we propose the interval regression analysis for obtaining an interval linear regression model with constraint conditions with respect to interval parameters. The merits of this method are the following.1) it is easy to obtain an interval linear model by solving a LP problem to which the formulation of proposed regression analysis is reduced, 2) it is easy to add constraint conditions about interval parameters, which are a sort of expert knowledge. As an application, within a case which has given certain data, the actual working time of jobs and the number of workers in a future plan are estimated through the real data obtianed from the operation of processing line in a heavy industry company. It results from the proposed method that the actual working time and the number of workers can be estimated as intervals by the interval regression model.

  • PDF

Study of an Optimal Control Algorithm for Train Interval Under Disturbance (외란을 고려한 열차간격 최적제어 알고리즘 연구)

  • Kim, Kiwoong;Lee, Jongwoo;Park, Minkee
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.419-425
    • /
    • 2015
  • When a train is delayed because of a disturbance, the time interval between successive trains increases and high-frequency metro lines can become unstable. Time interval control is therefore necessary in preventing such instabilities. In this paper, we propose an optimal interval control algorithm that is easy-to-implement and that guarantees system stability. In the proposed method, the controlled trains are determined from the time interval deviations between successive trains; the control algorithm for staying time is designed by use of a discrete traffic model to ensure an optimal time interval between successive trains. The results of a computer simulation are also given to demonstrate the validity of the proposed algorithm.

Analysis of Inspection Interval according to the Operating Platform of Overseas Purchase Missile (국외구매 대함유도탄의 운용 플랫폼에 따른 검사 주기 분석)

  • Hur, Jang Wan
    • Journal of Aerospace System Engineering
    • /
    • v.15 no.1
    • /
    • pp.63-71
    • /
    • 2021
  • The South Korean Navy has operated Harpoon guided missiles through step-by-step acquisition after adopting them for the first time in 1978. As Harpoon guided missiles have been operated for a long time, it is necessary to make an active follow-up logistics support to guarantee their performance. Inspection of guided missiles is a basic activity to check the status of missiles. This study was conducted to check if the existing inspection interval of Harpoon guided missiles that have been operated for a long time was appropriate. Regarding research methods, based on the Navy's field operation materials, this study analyzed and presented inspection interval by section according to the period of operation, utilizing the Martinez's theory and a non-parametric MCF technique.

A Study on Optimal Economic Operation of Hydro-reservoir System by Stochastic Dynamic Programming with Weekly Interval (주간 단위로한 확률론적 년간 최적 저수지 경제 운용에 관한 연구)

  • Song, Gil-Yong;Kim, Yeong-Tae;Han, Byeong-Yul
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.106-108
    • /
    • 1987
  • Until now, inflow has been handled an independent log-normal random variable in the problem of planning the long-term operation of a multi-reservoir hydrothermal electric power generation system. This paper introduces the detail study for making rule curve by applying weekly time interval for handling inflows. The hydro system model consists of a set of reservoirs and ponds. Thermal units are modeld by one equivalent thermal unit. Objective is minimizing the total cost that the summation of the fuel cost of equivalent thermal unit at each time interval. For optimization, stochastic dynamic programming(SDP) algorithm using successive approximations is used.

  • PDF

Emergency Trephination Site of Acute Subdural Hematoma (급성 경막하 혈종에서 응급 두개골 천공의 위치)

  • Moon, Soo-Hyeon;Kim, Geun-Hoe;Kwon, Taek-Hyun;Park, Youn-Kwan;Chung, Hung-Seob;Suh, Jung-Keun
    • Journal of Korean Neurosurgical Society
    • /
    • v.29 no.5
    • /
    • pp.659-663
    • /
    • 2000
  • The motality rate of acute subdural hematoma(ASDH) associated with closed head injury is high in spite of recent advances in neurosurgery. Many variables in regard to outcome of ASDH have been assessed. But among them, intracranial pressure(ICP) control and the time interval between injury and operative evacuation are the only things that can be affected by doctor. We introduced a simple method to the management of ASDH for reducing the time interval between injury and operation. When the immediate decompressive operation of ASDH was impossible by any causes, we made a burr hole at the center of hematoma, usually on 2-3cm above temporal squama and 1-2cm behind coronal suture under local anesthesia before main operation. Partial hematoma evacuation was achieved through the burr hole and it was effective in preventing further worsening of patients neurological status before main operation. Prompt hematoma evacuation through the burr hole seemed to be effective in delaying secondary ischemic brain damage and made easy to closing the dura opening and replacement of the bone flap at the end of main decompressive operation. This easy method may reduce the time interval between injury and operation. We represent surgical technique with two cases of ASDH managed with this simple method.

  • PDF

Decision-making Method of Optimum Inspection Interval for Plant Maintenance by Genetic Algorithms (유전 알고리즘에 의한 플랜트 보전을 위한 최적검사기간 결정 방법론)

  • 서광규;서지한
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.1-8
    • /
    • 2003
  • The operation and management of a plant require proper accounting for the constraints coming from reliability requirements as well as from budget and resource considerations. Most of the mathematical methods to decide the inspection time interval for plant maintenance by reliability theory are too complicated to be solved. Moreover, the mathematical and theoretical models are not usually cases in the practical applications. In order to overcome these problems, we propose a new the decision-making method of optimal inspection interval to minimize the maintenance cost by reliability theory and genetic algorithm (GA). The most merit of the proposed method is to decide the inspection interval for a plant machine of which failure rate $\lambda$(t) conforms to any probability distribution. Therefore, this method is more practical. The efficiency of the proposed method is verified by comparing the results obtained by GA-based method with the inspection model haying regular time interval.

The Effects of a Trauma Team Approach on the Management of Open Extremity Fractures in Polytrauma Patients: A Retrospective Comparative Study

  • Sakong, Seungyeob;Lim, Eic Ju;Cho, Jun-Min;Choi, Nak-Jun;Cho, Jae-Woo;Oh, Jong-Keon
    • Journal of Trauma and Injury
    • /
    • v.34 no.2
    • /
    • pp.105-111
    • /
    • 2021
  • Purpose: Open extremity fractures require prompt antibiotic medication and initial debridement surgery to reduce the infection rate and restore functional stabilization. We aimed to report the effects and positive outcomes of a trauma team approach on the management of open extremity fractures in polytrauma patients. Methods: This retrospective review included all polytrauma patients with open extremity fractures admitted between March 2009 and December 2019. Patients were divided into two groups according to whether they were treated before or after the implementation of the trauma team approach (March 2014). We analyzed the outcomes in each group with respect to the time interval until the doctor's arrival, total length of stay in the emergency department, the time interval until initial antibiotic treatment and operation, whether the initial operation was performed within 24 hours, and the rate of deep infections. Results: A total of 123 patients met the inclusion criteria. There were no statistically significant differences in demographic characteristics. The time interval until the doctor's arrival (64.12±49.2 minutes vs. 19.82±15.23 minutes; p=0.035) and initial antibiotic treatment (115.47±72.12 minutes vs. 48.78±30.12 minutes; p=0.023) significantly improved after implementing the trauma team approach. The union rate was not significantly different. However, the time interval until initial debridement, opportunity for initial debridement within 24 hours, and the rate of deep infections demonstrated better results. Conclusions: The reduced time interval until initial antibiotic treatment and debridement could be attributed to the positive effect of the trauma team approach on the management of open extremity fractures in polytrauma patients.