• 제목/요약/키워드: Operation Cost

검색결과 3,771건 처리시간 0.045초

마이크로 그리드에서 분산전원의 최적 운영 방안 (Optimal Operation of Dispersed Generation in MicroGrid Systems)

  • 김규호;이상봉;김수남;이상근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.486_487
    • /
    • 2009
  • This paper presents a method for optimal operation to improve reliability of MicroGrid systems considering load types and interruption cost. The objective functions such as power losses cost, operation cost of dispersed generations, power purchasing cost, and interruption cost are minimized for reliability improvement and efficient operation. The several indices for reliability evaluation are improved by renewable energy sources installation.

  • PDF

경량전철 무인자동운전의 비용 절감 효과 분석 (A Cost Reduction Effects Analysis on Automatic Operation of Light Rail)

  • 민재홍
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.63-70
    • /
    • 2000
  • Light Rail is highlighted for its construction cost and operation & maintenance cost in Korea. However, lack of analysis on driverless operation effect causes many disputes. In this paper, using latest driverless operation cost data. analysed cost reduction effect of it, with comparing present KNR's metropolitan subway signal system. It showed there is enough economic appropriateness B/C 1.241 on interest rate 6%, 1.076 on 8% and 0.943 on 10%, though it couldn't include passenger travel time value.

  • PDF

저가형 Hot Swap Controller를 가지는 병렬 구동 서버용 전원 장치 (Parallel Driven Power Supply with Low Cost Hot Swap Controller for Server)

  • 이강현
    • 전기학회논문지
    • /
    • 제67권6호
    • /
    • pp.738-744
    • /
    • 2018
  • This paper proposes a low cost hot swap operation circuit of a parallel operation power supply for servers. Hot swap function for server power system is essential in 24 hour operation system such as internet data center, server, factory and etc. Server power supplies used in internet data centers have two or more parallel operations with the hot swap operation. However, the cost of the power supply is high because the controller IC for hot swap operation is very expensive. Therefore, this paper proposes a parallel-operated power supply with a low-cost hot swap controller for servers. The proposed system can operate hot swap function by using discrete devices and reduce the cost by more than 50%. A 1.2kW prototype system is implemented to verify the proposed low cost hot swap controller.

농업용 저수지의 소수력 개발을 위한 경제성 분석 (Economic Feasibility Analysis for Development of Small Hydropower Using Agricultural Reservoirs)

  • 우재열;김진수;장훈;김영현
    • 한국농공학회논문집
    • /
    • 제53권2호
    • /
    • pp.53-60
    • /
    • 2011
  • This study was conducted to investigate the effect of hydropower factors (watershed, gross head), operation ratio and unit electricity cost on the benefit-cost ratio (B/C ratio) of small hydropower using agricultural reservoirs. The equation of B/C ratio was expressed as a function of watershed area, gross head, operation ratio and unit electricity cost. The benefit increased with watershed area, gross head and unit electricity cost, while the cost increased with watershed area and gross head but decreased with operation ratio. The B/C ratio increased with watershed area, gross head, operation ratio and unit electricity cost. While the effect of gross head on the B/C ratio decreased with watershed area, the effect of operation ratio and unit electricity cost on the B/C ratio increased with watershed area. The operation ratio is an important factor to affect the B/C ratio and therefore we need to develop hydropower for the heightened dams to expect high operation ratio due to continuous water release. The unit electricity cost is also an important factor to affect the B/C ratio and the B/C ratio was always below 1 unless unit electricity cost is over 60 Won/kWh under given conditions. The reservoirs with economic feasibility for small hydropower development were three in 21 when the equation of B/C ratio was appled to the study reservoirs. The results can be used to choose the appropriate reservoir with economic feasibility for development of small hydropower.

근사규모 추정에 의한 증권시스템 운영비용 산정 모텔 개발 (Developing a Security Systems Operation Cost Estimation Model with Approximate Sizing)

  • 최원영;김현수
    • Journal of Information Technology Applications and Management
    • /
    • 제11권1호
    • /
    • pp.39-51
    • /
    • 2004
  • Application systems outsourcing is an important part of IT outsourcing services. Application systems outsourcing costs is determined by service levels of outsourcers. Recent researches show there is a strong need to build industry-specific cost estimation models. In this study, an industry-specific application systems operation cost estimation model is suggested. We reviewed operation cost models of previous researches, and proposed a cost estimation model for security industry. Industry-specific service factors are defined and service levels are determined by Interviews with experts. The proposed model is tested and adjusted with empirical data. The new model shows more accurate prediction than previous general models. Future research will be needed to develop outsourcing cost estimation models for other industries and to refine cost models developed in this study.

  • PDF

Relationship Between Farm Land Structure and Machine Operation in Korea

  • Singh, Gajendra;Ahn, Duck-Hyun
    • 한국농업기계학회:학술대회논문집
    • /
    • 한국농업기계학회 1993년도 Proceedings of International Conference for Agricultural Machinery and Process Engineering
    • /
    • pp.129-138
    • /
    • 1993
  • The shortage of agricultural labour due to industrial growth has greatly induced the mechanization in Korean agriculture. However small and scattered land holdings have been the main constraints in the process of mechanization. This paper describes the interrelationships of farm land structure, machinery selection and machinery operation areas. The sandy silt loam irrigated paddy land having single crop a year was selected as a target areas for this study. Machine operation cost is greatly influenced by operation period, plot geometry and operation area. On the improved geometry plots, optimal machine size increases slowly with increase in operation area. Operable area increases due to increased effective machine capacity on better geometry plot. The difference between the effects of operation period and plot geometry is that in the former case, the cost reduction is caused by delay in increase of machine size, whereas in the latter case timeliness cost is reduced by increase ffective capacity. The effect of farmland consolidation is greater on small plots than that on big plots. Increasing wage rates have induced the adoption of more labor saving machinery. Bigger labor saving machines require enlargement of operation area and larger plots through improvement in farm land structure. Machine cost on poor plot geometry increases more rapidly than that on the good plot geometry and as operation area increases machine cost reduces significantly. It is concluded that the development of agricultural mechanization ion Korea will depend on the improvement in farm land structure and enlargement of operation area.

  • PDF

빙축열 냉방시스템의 운전특성 및 비용 분석 (The Operation Characteristics and Cost Analysis of an Ice Thermal Storage System)

  • 안영환;강병하;김석현;이대영
    • 설비공학논문집
    • /
    • 제17권2호
    • /
    • pp.156-164
    • /
    • 2005
  • A comparative analysis of an ice storage system has been performed on the operation cost for the four control strategies, i.e., chiller priority and chiller downstream, chiller priority and chiller upstream, storage priority and chiller upstream, storage priority and chiller downstream. Main components of the ice storage system are an ice-on-coil storage tank and a screw compressor chiller. With the simulation program, the operation cost has been evaluated from the economics of an ice storage system. It is found that the operation cost of the ice storage system is strongly dependent on the control strategy, i.e., chiller priority or storage priority, but less affected by the arrangement method, i.e., chiller upstream or chiller downstream. In case of the maximum load day, the control strategy with chiller priority and chiller upstream is supposed to obtain the reduction of operation cost. However, it is found that the control strategy with storage priority and chiller downstream is the best economical operation for most summer seasons except the maximum load day.

IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구 (An Empirical Study on Contract Model for IT Outsourcing Application Operation)

  • 김흥식;박소아
    • 한국IT서비스학회지
    • /
    • 제16권2호
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.

철도차량 획득단계에 적용되는 수명주기비용 모형에 관한 연구 (Life Cycle Cost Model for the Acquisition of Rolling Stocks)

  • 김종운;정광우;정종덕;한석윤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.198-205
    • /
    • 2009
  • 일반적으로 철도차량은 획득비용보다 운영 유지보수비용이 높다는 것이 알려져 있다. 운영 유지보수비용의 절감을 위해서는 운영 유지보수 비용 측면에서 효율적으로 설계된 철도차량을 획득하는 것이 매우 중요하다. 따라서 철도차량의 획득단계에서부터 운영 유지보수비용을 포함한 수명주기비용을 고려하는 것이 필요하다. 본 연구는 철도차량의 획득단계에서 수명주기비용을 고려하기 위한 절차 및 수명주기비용 모형을 제시한다.

  • PDF

에너지 비용을 고려한 중앙냉방시스템 최적운영 방안에 관한 연구(의료시설을 중심으로) (The Study on the Optimal Operation Strategies for Central Cooling System Considering Energy Cost (Focus on a medical facility))

  • 이가람;송재엽
    • 한국지열·수열에너지학회논문집
    • /
    • 제16권4호
    • /
    • pp.1-8
    • /
    • 2020
  • For a central cooling system of a medical facility composed of absorption chiller and screw chiller, the study was conducted on how to minimize the energy cost. In consideration of the energy cost, the optimal operation method in which the operation method of the heat source is changed according to the size of the cooling load was derived through simulation analysis. When applying the optimal operation method, the indoor environment, energy consumption, and energy cost were analyzed and compared with the reference operation method.