Today air traffic at the airport is complicated including a significant increase in the volume of air transport, so aviation accidents are constantly occurring. Therefore, we should newly recognize importance of the Air Traffic Safety, the core values of the Air Traffic. The location of airport that is the basic infrastructure of the air traffic and the security of safety for facilities and equipments are more important than what you can. From this dimension, I analyze the step-by-step safety factors that are taken into account in the airport development projects from the construction or improvement of the airport within the current laws and institutions and give my opinion on the enhancement of safety in the design and construction of airport. The safety of air traffic, as well as airport, depends on location, development, design, construction, inspection and management of the airport including airport facilities because we have to carry out the national responsibility that prevents the risk of large social overhead capital for many and unspecified persons in modern society through legislation regarding intervention of specialists and locational criteria for aviation safety from the planning stage of airport development. In addition, well-defined installation standards of airports and air navigation facilities, the key points of the airport development phase, can ensure the safety of the airport and airport facilities. Of course, the installation standards of airport and air navigation facilities are based on the global standard due to the nature of air traffic. However, to prevent the chaos for the safety standards in design, construction, inspection of them and to ensure the aviation safety, the safety standards must be further subdivided in the course of domestic legislation. The criteria for installation of the Air Navigation facilities is regulated most specifically. However, to ensure the safety of the operation for Air Navigation Facilities, performance system proved suitable for the Safety of Air Navigation Facilities must change over from arbitrary restrictions to mandatory restrictions and be applied for foreign producers as well as domestic producers. Of course, negligence of pilots and defective aircraft maintenance lead to a large portion of the aviation accidents. However, I think that air traffic accidents can be reduced if the airport or airport facility is perfect enough to ensure the safety. Therefore, legal and institutional supplement to prioritize the aviation safety from the stage of airport development may be necessary.
False alarm of Electronic security causes various serious side effects such as decrease of electronic security guard's morale caused by unnecessary mobilization, increase of fatigue caused by workload increase, increase of electronic security company owner's management burden and decrease of electronic security service utilization rate caused by customer's distrust. Therefore, the study considered the Korean regulation related with false alarm of electronic security and proposed actual status of false alarm and measure for it. The study proposed systematic resolution assignments and political assignments in relation with the measure for false alarm. Systematic resolution assignments are as follows. First, electronic security company should construct electronic security system accurately from the initial step of security consulting and security planning related with target facility. Second, it is necessary to encourage installation and operation of video monitoring system. Third, sensor wiring should be separated. Fourth, the measures for false alarm depending on main system causes should be prepared. It is necessary to encourage the installation of 'arming disarming alarm sound' generator. In addition, the measures for false arm depending on the characteristics of sensor should be prepared and standardized. Fifth, system maintenance should be reinforced. Political assignments related with the measures for false alarm are as follows. First, it is necessary to reinforce education & training. Individual nurturing & education process should be run by electronic security company or the education focusing on the measure for false alarm should be performed in job training defined in "Security Industry Act". Second, it is necessary to establish and reinforce legal regulation and establish device. If police authority standardizes the documents related with false alarm, provides their forms and requires them for periodical reports or documents, it is expected that good measures for false alarm will be prepared on the basis of actual data in the future. Third, cooperation organization to discuss the measures for false alarm like 'Conference for False Alarm of Electronic Security' should be organized and operated. Fourth, interest and role of electronic security company and electronic security supervisor should be enlarged.
This study's purpose is to present the improvement of effectiveness of security activity for international conference which can be held hereafter. On the basis of security activity problems originating in G20 summit meeding that had been held in Seoul in 2010. I made up questions three times to on the members of the police, military, fire figher and national intelligence service who had experienced in Seoul G20 summit meeding and recognition of possible problem and possibility of improvement on each item of questions was analyzed by Delphi Method. Also interviews with 4 security experts selected from each security agency were conducted to present improvement in each part of problem. The results obtained from the face to face interview with four experts of security-enforcement agency about the role of event site activity stage for international conference are as followings; First, 'security protocol section' protocol and security are needed mutual win-win enough to be compared with adaptative relationship, thereby being demanded the closer cooperation and information exchange. Second, 'situation management section' there is a need of reinforcing the cooperative system between situation rooms of each agency in order to possibly operate all of the security manpower integrally, which are dispersed by function and by event site, in addition to the swift and organic information exchange between wide-area local government and all the security agencies focusing on a preparation planning group. Third, 'security manpower resource management section' there is a need of encouragement and interest in the leadership in order to devise system that all of the security manpower can concentrate on event and to be possibly satisfied the given conditions. Fourth, 'local government cooperative support section' the wide-area local government of a hosting city as international city operates several kinds of the facilities for international conference, supports operation of conference, achieves a ripple effect of event such as tourism, maximizes service of accomodations, and performs the primary responsibility for the maintenance of the traffic facilities, thereby needing to execute special inspection under the responsibility of Si-Do governors.
Kim, Hak-Jin;Roh, Mi-Young;Lee, Dong-Hoon;Jeon, Sang-Ho;Hur, Seung-Oh;Choi, Jin-Yong;Chung, Sun-Ok;Rhee, Joong-Yong
Journal of Bio-Environment Control
/
v.20
no.2
/
pp.93-100
/
2011
Maintenance of adequate soil water potential during the period of crop growth is necessary to support optimum plant growth and yields. A better understanding of soil water movement within and below the rooting zone can facilitate optimal irrigation scheduling aimed at minimizing the adverse effects of water stress on crop growth and development and the leaching of water below the root zone which can have adverse environmental effects. The objective of this study was to evaluate the feasibility of using a portable irrigation controller with an Watermark sensor for the cultivation of drip-irrigated vegetable crops in a greenhouse. The control capability of the irrigation controller for a soil water potential of -20 kPa was evaluated under summer conditions by cultivating 45-day-old tomato plants grown in three differently textured soils (sandy loam, loam, and loamy sands). Water contents through each soil profile were continuously monitored using three Sentek probes, each consisting of three capacitance sensors at 10, 20, and 30 cm depths. Even though a repeatable cycling of soil water potential occurred for the potential treatment, the lower limit of the Watermark (about 0 kPa) obtained in this study presented a limitation of using the Watermark sensor for optimal irrigation of tomato plants where -20 kPa was used as a point for triggering irrigations. This problem might be related to the slow response time and inadequate soil-sensor interface of the Watermark sensor as compared to a porous and ceramic cup-based tensiometer with a sensitive pressure transducer. In addition, the irrigation time of 50 to 60 min at each of the irrigation operation gave a rapid drop of the potential to zero, resulting in over irrigation of tomatoes. There were differences in water content among the three different soil types under the variable rate irrigation, showing a range of water contents of 16 to 24%, 17 to 28%, and 24 to 32% for loamy sand, sandy loam, and loam soils, respectively. The greatest rate increase in water content was observed in the top of 10 cm depth of sandy loam soil within almost 60 min from the start of irrigation.
Proton therapy facility, which is recently installed at National Cancer Center in Korea, generally produces a large amount of radiation near cyclotron due to the secondary particles and radioisotopes caused by collision between proton and nearby materials during the acceleration. Although the level of radiation by radioisotope decreases in length of time, radiation exposure problem still exists since workers are easily exposed by a low level of radiation for a long time due to their job assignment for maintenance or repair of the proton facility. In this paper, the working environment near cyclotron, where the highest radiation exposure is expected, was studied by measuring the degree of radiation and its duration for an appropriate level of protective action guide. To do this, we measured the radiation change in the graphite based energy degrader, the efficiency of transmitted beam and relative activation degree of the transmission beam line. The results showed that while the level of radiation exposure around cyclotron and beam line during the operation is much higher than the other radiation therapy facilities, the radiation exposure rate per year is under the limit recommended by the law showing 1~3 mSv/year.
Predictional study for lateral change between pre- and post-orthognathic surgery has been emphasized mainly on anterior area of lateral profile; upper lip, lower lip and chin et al. So interest for lateral profile change has been less in posterior area of lateral profile and literature analyzing gonial angle change is rare. The purpose of this study is to make prediction for gonial angle change possible and to offer somewhat treatment guidance for gonial angle to be improved by investigating overall gonial angle change between pre- and post-orthognathic surgery and inquiring into factors influencing on pattern of genial angle change. For this study 35 patients were selected retrospectively. Lateral cephalometric radiographs were taken in just pre-op time, pod 1 day, pod 1 year. They were analyzed and genial angles were measured. The results were as follows : 1. Gonial angle at pod 1 day was decreased about $9.3^{\circ}$ than pre-op and gonial angle at pod 1 year was increased about $4.0^{\circ}$ than pod 1 day. So genial angle at pod 1 year was decreased about $5.3^{\circ}$ than pre-op genial angle(p<0.01). 2. Mean pre-op gonial angle was $129.4^{\circ}$, showing significantly high value than normal and mean gonial angle at pod 1 year was $124.1^{\circ}$, showing value near to normal. 3. Mean gonial angle change between pre-op and pod 1 year was decreased about $5.4^{\circ}$ in female and $5.3^{\circ}$ in male. There was no statistically significant difference between male and female(p>0.05). 4. Principal factor influencing on decreased gonial angle in gonial angle change between pre-op and pod 1 year was amount of mandibular setback. 5. Principal factor influencing on increased gonial angle in gonial angle change between pod 1 day and pod 1 year was % horizontal relapse, and it was thought that resorption and bone remodelling on posterior area in mandibular distal segment also were related to increased gonial angle. 6. It is thought that sagittal split ramus osteotomy in mandibular prognathic patients with high value of gonial angle is effective to improvement of gonial angle, and In patients who have normal range of gonial angle and are required with excessive mandibular setback, short lingual cut method, additional resection of posterior margin of distal segment, Obwegeser II method will be considerd. 7. More prudent operation and careful post-op management will be responsible for maintenance of postoperative stable gonial angle.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.52-63
/
2015
Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.
This study is aimed to analyze problems of police budgetary execution and to suggest better ways for establishing effective budget implementation as well as legitimacy of securing budget in the field of police work. For this purpose, this paper analyzed the annual reports on police budgetary execution, from 2009 to 2012, conducted by National Assembly Budget Office. In result, most parts of the police budgetary execution were not satisfied with the audit standard, and especially in terms of management of budgetary execution, it showed 40% in inappropriateness. In addition, excessive and underestimate appropriation in the police budgetary execution, which happened frequently in other offices, was recorded on the second place. 10% of the amount of budget was executed for ordinance violence. Given results analyzed from each division, Transportation Division occupied 40% of the amount of related problems and all of types in the field did not meet the audit standard, thus it is required to manage budgetary execution effectively. In terms of Public Safety Division, the problem was related to budgetary allocation prior to execution, such as overlap in other works, excessive and underestimate appropriation, and inappropriate business plans. Director General for Planning and Coordination did not meet the standard of law system maintenance, Given the light of the result of analyzing programs, traffic safety and securing communication was the most problematic and support for police administration, crime prevention and protecting the disadvantaged, educating professional police officers, and establishment of policing infrastructure were required to be reformed in sequence. In order to resolve these problems, it is demanded to check budgetary execution and the process in business plans on a regular basis. Additionally, in case of using budget in inappropriate parts, tough penality including reduction of budget in related to the local police should be implemented to increase the importance of budgetary execution. Moreover, because of the fact that a part of problem of budgetary execution was originally caused by the budgetary allocation, it is advised to allocate police budget using the budget proposal of National Finance Act and Ministry of Strategy and Finance.
SaKong, Hyub;Shin, Hong Kwan;Lee, Young-Kook;Bae, Ki Cheor;Cho, Chul Hyun;Lee, Kyung Jae;Son, Eun-Seok;Kim, Doo Han
Journal of the Korean Arthroscopy Society
/
v.16
no.2
/
pp.153-159
/
2012
Purpose: This study aims at evaluating our results with a 5-year follow up of arthroscopic pull-out suture repair of posterior root tear of the medial meniscus. Materials and Methods: This study enrolled 30 cases who underwent a arthroscopic pull-out suture repair to treat the posterior root tear of the medial meniscus from January 2001 to May 2005 and followed up at least 5 years. The average follow-up period was 76 months (range, 60-90 months). Clinical results by use of the Lysholm knee score and radiographic grade by use of the Kellgren-Lawrence classification were evaluated and second-look arthroscopy was done in all cases. The clinical results were compared with trauma history, obesity, varus deformity and time to operation. Results: At the last follow up, the Lysholm knee score improved from 55 points to 86 points. For the radiological results, 23 cases displayed maintenance or improvement of the medial joint space on the follow up X-ray, but 7 cases displayed decrease of the medial joint space, and 1 case was lately performed total knee replacement due to progressive osteoarthritic change. Conclusion: Arthroscopic pull-out suture repair has a good result at 27 cases (90%) in minimum 5 years follow-up. The clinical improvement was significantly reduced in more severe varus angle.
Kim, Kee-Won;Kwak, Yong-Geun;Chae, Joon-Seak;Cho, Kyu-Park
The Korean Journal of Pharmacology
/
v.23
no.2
/
pp.123-131
/
1987
The possible inolvement of central opiate system in the control of cardiovascular function and in the antihypertensive action of clonidine has been examined in unanesthetized rats with shamoperated or 2-kidney, 1-clip (2K1C) renal hypertension. In both groups of rats, intraventricular clonidine $(3-30\;{\mu}g/kg)$ produced hypotension and bradycardia. Hypotensive action of clonidine was more potent in the hypertensive rats than in the normotensive sham-operated rats. Yohimbine $(30\;{\mu}g/kg,\;i.v.t.)$ inhibited the hypotension and bradycardia produced by clonidine. Naloxone ($50\;{\mu}g/kg$, i.v.t.) inhibited the action of clonidine in 2K1C hypertensive rats but not influenced in the sham-operated rats. Intraventricular morphine $(10-100\;{\mu}g/kg)$ also reduced rats. Intraventricular morphine $(10-100\;{\mu}g/kg)$ also reduced blood pressure and heart rate in both groups of rats. But these effects were not affected by yohimbine, but antagonized by naloxone ($50\;{\mu}g/kg$, i.v.t.). Chronic treatment of 2K1C rats with clonidine ($3{\times}20\;{\mu}g/kg$, p.o.,) for 14 days from 1 day after 2K1C operation) suppressed the development of hypertension and maintained the blood pressure in normal level and this errect of clonidine was abolished by naloxone (2 mg/kg, i. p.). In the 2K1C hypertensive rats, immunoreactive ${\beta}-endorphin$ content was significantly decreased, but maximum binding (Bmax) of $(^3H)-naloxone$ was significantly increased in brain of 2K1C hypertensive rats. However, Kd value was not changed. These results suggest that the opioidergic component might be involved in the antihypertensive action of clonidine only in hypertensive and that central opiate system might play important roles in pathophysiology of development and maintenance of hypertension.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.