• Title/Summary/Keyword: Operation

Search Result 48,615, Processing Time 0.071 seconds

Design of Parallel Multiplier Circuit synthesized operation module over $GF(2^m)$ (연산 모듈의 결합에 의한 $GF(2^m)$상의 병렬 승산 회로의 설계)

  • Byun, Gi-Young;Kim, Heung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2002.11c
    • /
    • pp.268-273
    • /
    • 2002
  • In this paper, a new parallel multiplier circuit over $GF(2^m)$ has been proposed. The new multiplier is composed of polynomial multiplicative operation part and modular arithmetic operation part, irreducible polynomial operation part. And each operation has modular circuit block. For design the new proposed circuit, it develop generalized equations using frame each operation idea and show a example for $GF(2^m)$.

  • PDF

The Establishment of Train Operation Plan in Railway System (철도시스템의 운전계획 수립)

  • 이동근;고영호;권정원
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.929-936
    • /
    • 2002
  • This paper presents a Rotem's methodology for the establishment of train operation plan in Railway system. Train operation plan is the key prior plan to proceed the design of the civil and E&M relevant subsystem. But, due to the limitation of the environmental and project condition, common consensus to the key factors which make up the operation plan have not been accomplished. So, as a result of this comparative review for the general approaching method of train operation plan and application status of the major key factors being performed by Rotem, we will get the opportunities to improve the accuracy of the train operation plan.

  • PDF

Development of Generic Train Operation Model Based on Korean Urban Transit Regulations

  • Lee, Young-Hoon
    • International Journal of Railway
    • /
    • v.4 no.4
    • /
    • pp.81-85
    • /
    • 2011
  • This paper discusses the development of a generic train operation model from a set of Korean Urban Transit Regulations such as Regulation for Train Operation of Urban Transit, Regulation for Safety Requirements of Urban Transit and so on. It is to communicate with various stakeholders on urban transit system, and to elicit copious requirements in performance of the urban transit train operation based on the model.

  • PDF

A Study(I) of Signalling for Driverless Operation (무인자동운전을 위한 신호제어시스템 개발(I))

  • 윤용기;정락교;이병송;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.376-381
    • /
    • 2000
  • Because of the presure of costs some public transport companies are forced to think new system that is more simple and more economic forms of operation. Radio-based operation and automatic driverless operation for city railways are possible to low the costs. To construct the automated driverless operation system, it is necessary to configure the new signalling. This paper focuses on the automated driverless operation system suitable for the LRT and the standard of signalling function and the R&D project in the world.

  • PDF

Optimal Capacity and Allocation Distributed Generation by Minimization Operation Cost of Distribution System (배전계통 운영비용의 최소화에 의한 분산전원의 최적 용량과 위치결정)

  • 배인수;박정훈;김진오;김규호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.481-486
    • /
    • 2004
  • In operation of distribution system, $DG_s$ Distributed Generations) are installed as an alternative of extension and establishment of substations and transmission and distribution lines according to increasing power demand. In operation planning of $DG_s$, determining optimal capacity and allocation gets economical pro(it and improves power reliability. This paper proposes determining a optimal number, size and allocation of $DG_s$ needed to minimize operation cost of distribution system. Capacity of $DG_s$ (or economical operation of distribution system estimated by the load growth and line capacity during operation planning duration, DG allocations are determined to minimize total cost with power buying cost. operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm).

Facility Location Planning with Realistic Operation Times in Supply Chain (공급사슬에서 실제 시설물 운영시간을 고려한 시설배치계획에 관한 연구)

  • Lee Sang Heon;Kim Sook Han
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.2
    • /
    • pp.143-156
    • /
    • 2005
  • Facility location planning (FLP) problem is the strategic level planning in supply chain. The FLP is significantly affected by the operation time of each facility. In most of the FLP researches, operation time of facility has been treated as a fixed value. However, the operation time is not a static factor in real situations and the fixed operation time may lead unrealistic FLP. In this paper, a mixed integer programming (MIP) model is proposed for solving the 3-stage FLP problem and operation times are adjusted by the results from the simulation model and an iterative approach combining the analytic model and simulation model is proposed to obtain more realistic operation plans for FLP problems.

The Analysis of Distribution Characteristic on the Operation Cost for Respective Transport Volume and Travel Speed of New Transit System Bi-Modal Tram (녹색 신교통 시스템 바이모달트램의 수송수요 및 운행속도별 운영비용 분포특성 분석)

  • Bae, Eul-Ho;Kim, Kyung-Man;Shin, Cheol-Ho;Kim, Do-Han;Park, Young-Kon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2297-2302
    • /
    • 2010
  • The status and effectiveness of Bi-modal Tram is analyzed through the comparison of the transport effectiveness and operation cost between the public transportation systems (bus, light rail transit) considering the vehicle and operation characteristic of new transit system Bi-modal Tram. The standard operation schedule is established in consideration of the vehicle specification and operation characteristic of main public transportation modes, and then the annual average operation cost is estimated depending on the volume, speed, analysis length for respective public transportation mode. Through analyzing the operation cost and distribution characteristic of public transportation modes depending on the transport volume and travel speed, the operational efficiency suitable for the city is derived. It is concluded that the operational efficiency of Bi-modal Tram is superior to that of the bus and light rail transit on the aspect of travel volume and operation speed.

  • PDF

A Study on Construction of Unified Control and Operation System for the Efficient Operation of Bimodal Tram (바이모달트램의 효율적 운용을 위한 통합관제시스템 구축에 관한 연구)

  • Lee, Kang-Won;Yun, Hee-Tek;Park, Young-Kon;Kil, Gun-Kuk;Oh, Jae-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.633-637
    • /
    • 2007
  • Bimodal Tram is the newly developed vehicle for both the tracked way and the public road. Its operation system has some characteristics including BIS(bus information system)/BMS(bus management system) based on ITS(intelligent Transportation system) which is used presently in public transportation operation system. One of them is more accurate vehicle fleet control based on both magnetic maker position reference system and GPS(global positioning system) and the other is automatic vehicle control for emergency situations by the Bimodal Tram operation system which will be performed by the unified control and operation center. This paper has investigated the requirements and functional definitions necessary to construct the unified control and operation center for Bimodal Tram operation system which will be more efficient and secure public transportation system than the conventional ones.

  • PDF

Conceptual design of autonomous emergency operation system for nuclear power plants and its prototype

  • Kim, Jonghyun;Lee, Deail;Yang, Jaemin;Lee, Subong
    • Nuclear Engineering and Technology
    • /
    • v.52 no.2
    • /
    • pp.308-322
    • /
    • 2020
  • This paper presents a conceptual design for a plant-wide autonomous operation system that uses artificial intelligence techniques. The autonomous operation system has the power and ability to perform the control functions needed for the emergency operation of a nuclear power plant (NPP) with reduced operator intervention. This paper discusses the emergency operation and level of automation in an NPP and presents the design requirements for an autonomous emergency operation system (A-EOS). Then, an architecture that consists of several modules is proposed, with descriptions of the functions. Finally, this paper introduces a prototype of the suggested autonomous system that integrates the authors' previous works.