• Title/Summary/Keyword: Operating hour

Search Result 188, Processing Time 0.023 seconds

Study on Divice for the Automatic Shut Off of Equipment Stand-by Power (자동전원 계폐장치에 관한 연구)

  • Kim, H.K.;Hyun, K.W.;Bae, J.I.;Yang, S.Y.;Park, S.T.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07f
    • /
    • pp.2626-2627
    • /
    • 1999
  • The device we have developed is the automatic shut off equipment which will reduce energy consumption when an equipment is in stand by power state. The principle for this system is when a man is moving, electricity will flow by setting a on-off light system. At night, in the stand-by power state the electric supply will be shut off immediately which will reduce energy consumption. Energy consumed by 24hour operating machines and stand-by electronic devices will be reduced by pulse signals which will give power supply when needed.

  • PDF

A construction of the exhibition evaluation support system based on GUI by visitors behavior analysis

  • Kim, Dae-Woong;Lee, Joong-Youp;Kaneko, Kousuke
    • International Journal of Contents
    • /
    • v.7 no.3
    • /
    • pp.48-59
    • /
    • 2011
  • The present thesis is on a construction of the system which supports exhibition evaluation of curators, which automatically collects, keeps, and totalizes objective data on visitor behavior in museums, and which comprehensively displays the results by tables and graphs. The system is composed by access points and mobile exhibition exposition devices in the museum operating together. Obtainable visitor information include a user number, an average staying period, contents use hour, and exhibition viewing frequency. Prototype experiment at museums shows that the system is effective in efficient data collection and exhibition evaluation and is expected to become an information collecting tool for visitor research and an exhibition evaluation tool for exhibition improvement.

A Study on Efficiency Improvement of Surface Preparation Process for Ship's Block - the Effect of Design and Operation Parameters for the Abrasive Recovery System (조선용 블록의 도장 전처리 효율 향상 연구 - 연마재 회수 효율 제어 인자별 특성 평가)

  • Baek Jea jin;Lee Byung Hun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2005.06a
    • /
    • pp.198-205
    • /
    • 2005
  • Reduction of labor hour for cleaning up of the used abrasives after blasting. is attempted by improving the efficiency of abrasive recovery process in the protective coating of ship's block, For this purpose, the theoretical background for pneumatic transport technology in the abrasive recovery system as well as experimental evaluation on the effect of design parameters such as flow pattern, saltation velocity and pressure drop on the efficiency of the abrasive recovery system are employed . By optimizing the operating parameters such as the length and diameter of the suction hose, specification of recovery device and recovery mouth, a new method which can dramatically increase the efficiency of abrasive recovery system, is proposed.

  • PDF

A Study on The Energy Conservation System in House for reducing the Environmental Load (환경부하 저감을 위한 주택의 에너지절약 시스템에 관한 연구 -소형코제너레이션시스템과 태양광발전시스템을 적용한 성능평가-)

  • 정진현
    • Journal of the Korean housing association
    • /
    • v.11 no.1
    • /
    • pp.159-169
    • /
    • 2000
  • This study was examined the energy conservation and the environmental value through the computer simulation employing the micro cogeneration system and the photovoltaic power generation system in house. The results of this study were as follows:1. In case of the micro cogeneration system. With the conditions of 'the electric produced by the micro cogeneration system was not sold to the electric power company', 'control quantity of commercial power supply was 10%' , 'operating time was 6 hour', 'minimum load rate of generator was 50%', and 'having a storage tank', the micro cogeneration system was superior compare to the comparative system in 2.4% of the energy conservation and 4.18% of the environmental value. 2. In case of the photovoltaic power generation system. 1) The 66.9% of total generated electric power from the photovoltaic power system was sold to the electric power company. That is, it could help to preserve the electric power from commercial power supply.2) There is a possibility of cutting the fair rate of electric power.

  • PDF

${\gamma}-Fe_2O_3$ Thick Film City Gas Sensor (${\gamma}-Fe_2O_3$ 후막형 도시가스 감지 소자)

  • Choi, Dong-Han;Lee, Won-Kee;Lee, Duk-Donq;Sohn, Hyunq-Ki
    • Proceedings of the KIEE Conference
    • /
    • 1987.07a
    • /
    • pp.477-480
    • /
    • 1987
  • ${\gamma}-Fe_2O_3$ thick film city gas sensors have been fabricated by using screen printing method. The sensitivity to $C_4H_{10}$ and, $CH_4$ was about 90% and 65% respectively. The devices heated in air at $400^{\circ}C$ for 1 hour exhibited the highest sensitivity (-90%) to $C_4H_{10}$ at the operating temperature of $300-350^{\circ}C$. And they had good selectivity for $C_4H_{10}$ in comparistion with other gases (CO, $H_2$, $C_3H_8$ etc).

  • PDF

A Case Study on Malfunction of OCGR and Inaccuracy of Watt-hour Meter in Distributed Generation System (분산형 발전고객의 OCGR오동작 및 과부족 계량에 대한 사례연구)

  • Shin, Dong-Yeol;Park, Yong-Woo;Cha, Han-Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1349-1355
    • /
    • 2008
  • The paper shows the analysis of operating conflict of OCGR trip events and metering errors in the photovoltaic generation, wind generation distributed generation customers with no defect of the distributed generation facilities, which are connected to 22.9kV distribution lines. To analyze problems with metering errors and OCGR fault event, a power quality analyzer and PSIM program were used to test the field and to simulate in Sun-Cheon photovoltaic generation and Seo-Cheon photovoltaic generation customers. With the trial distribution line, the result of analysis was verified to prove with the same situation of the actual field. This paper suggests short term and long term countermeasures of OCGR fault events, analysis of over and shortage of metering errors in distributed generation customers.

Planning ESS Managemt Pattern Algorithm for Saving Energy Through Predicting the Amount of Photovoltaic Generation

  • Shin, Seung-Uk;Park, Jeong-Min;Moon, Eun-A
    • Journal of Integrative Natural Science
    • /
    • v.12 no.1
    • /
    • pp.20-23
    • /
    • 2019
  • Demand response is usually operated through using the power rates and incentives. Demand management based on power charges is the most rational and efficient demand management method, and such methods include rolling base charges with peak time, sliding scaling charges depending on time, sliding scaling charges depending on seasons, and nighttime power charges. Search for other methods to stimulate resources on demand by actively deriving the demand reaction of loads to increase the energy efficiency of loads. In this paper, ESS algorithm for saving energy based on predicting the amount of solar power generation that can be used for buildings with small loads not under electrical grid.

Configuration and Ground Tests of Solar Cell and Fuel Cell Powered System for Long Endurance UAV (장기체공 무인기용 태양전지-연료전지를 활용한 동력원 구성 및 지상시험)

  • Park, Byeongseob;Kim, Hyuntak;Baek, Seungkwan;Kwon, Sejin
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.19 no.4
    • /
    • pp.94-101
    • /
    • 2015
  • Each of power systems of solar cell and fuel cell were configured and validated for long endurance UAV, as the preliminary research for the integration of power systems. Solar power system consisted of solar modules fabricated by solar cells of Sunpower's C60, commercial solar MPPT controller and Li-po battery, and then was validated. The re-start characteristics of hydrogen production from $NaBH_4$ hydrolysis was validated for operating the commercial fuel cell. The average voltage drop of Li-po battery in solar power system was -2.9 V/hour. The performance of re-start characteristics of $NaBH_4$ hydrolysis was stable in sequence mode of mission profile. Each of single systems were satisfied for the proposed mission profile.

Intermittent Bleeding Method after Replantation o the Distal Phalanx (원위 수지 재접합술 뒤 간헐적 실혈 요법)

  • Lee, Byung-Ho;Park, Chan-Il;Lee, Jun-Mo
    • Archives of Reconstructive Microsurgery
    • /
    • v.20 no.1
    • /
    • pp.38-42
    • /
    • 2011
  • Purpose: To evaluate the effect of intermittent bleeding method in the distal phalanx replantation. Materials and Methods: From January 2007 through June 2009, authors have replanted 117 cases of distal phalangeal amputation in adults at Soo Hospital and Chonbuk National University Hospital. Cases of zone II were 60 cases and zone III 57 according to Allen classification. Male to female ratio was 8.7:1.3. The most common cause was machinery injury in the factory, 98 cases(83.8%), next one was belt injury of the machine, 11 cases(9.4%) and others, 8(6.8%). At least one digital artery and digital nerve were anastomosed under the operating microscope, but vein was impossible to anastomosis as unable to find out in the zone II and III. After anastomosis of one or more digital arteries and nerves, heparine(6,000-10,000 units) was kept to intravenous injection for 24 hours and at the same time fish mouth incision in 2-3 millimeter diameter was made in the distal radial and ulnar margin of the replanted distal phanlanx. From the first 30 minutes to an hour after replantation, incision site was swabbed with heparinized cotton ball for 5 minutes in every 30 to 40 minutes to make sure perfusion for 24 hours, every an hour at the second day, every two hours at the postoperative third to fifth day. Results: 92 cases(78.6%) was completely survived at average postoperative third week follow-up and satisfied with preservation of the finger nail, digit length, good range of motion of the distal interphalangeal joint and acceptable sensibility at average 1.2 years follow-up. Conclusions: Intermittant bleeding method in replantation of crushed distal phalanx impossible to anastomosis of vein at zone II and III of Allen classification was regarded as one of the notable salvage procedure.

  • PDF

Radiation Exposure Reduction in APR1400

  • Bae, C.J.;Hwang, H.R.;Matteson, D.M.
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.2
    • /
    • pp.127-135
    • /
    • 2003
  • The primary contributors to the total occupational radiation exposure in operating nuclear power plants are operation and maintenance activities doting refueling outages. The Advanced Power Reactor 1400 (APR1400) includes a number of design improvements and plans to utilize advanced maintenance methods and robotics to minimize the annual collective dose. The major radiation exposure reduction features implemented in APR1400 are a permanent refueling pool seal, quick opening transfer tube blind flange, improved hydrogen peroxide injection at shutdown, improved permanent steam generator work platforms, and more effective temporary shielding. The estimated average annual occupational radiation exposure for APR1400 based on the reference plant experience and an engineering judgment is determined to be in the order of 0.4 man-Sv, which is well within the design goal of 1 man-Sv. The basis of this average annual occupational radiation exposure estimation is an eighteen (18) month fuel cycle with maintenance performed to steam generators and reactor coolant pumps during refueling outage. The outage duration is assumed to be 28 days. The outage work is to be performed on a 24 hour per day basis, seven (7) days a week with overlapping twelve (12) hour work shifts. The occupational radiation exposure for APR1400 is also determined by an alternate method which consists of estimating radiation exposures expected for the major activities during the refueling outage. The major outage activities that cause the majority of the total radiation exposure during refueling outage such as fuel handling, reactor coolant pump maintenance, steam generator inspection and maintenance, reactor vessel head area maintenance, decontamination, and ICI & instrumentation maintenance activities are evaluated at a task level. The calculated value using this method is in close agreement with the value of 0.4 man-Sv, that has been determined based on the experience aid engineering judgement. Therefore, with the As Low As Reasonably Achievable (ALARA) advanced design features incorporated in the design, APR1400 design is to meet its design goal with sufficient margin, that is, more than a factor of two (2), if operated on art eighteen (18) month fuel cycle.