• Title/Summary/Keyword: Operating Reserve

Search Result 50, Processing Time 0.02 seconds

Study on Establishing Investment Mathematical Models for Each Application ESS Optimal Capacity in Nationwide Perspective (국가적 관점에서 각 용도별 ESS 적정용량 산정을 위한 투자수리모델 수립에 관한 연구)

  • Kim, Jung-Hoon;Youn, Seok-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.979-986
    • /
    • 2016
  • At present, electric power industry around the world are being gradually changed to a new paradigm, such as electrical energy storage system, the wireless power transmission. Demand for ESS, the core technology of the new paradigm, has been growing worldwide. However, it is essential to estimate the optimal capacity of ESS facilities for frequency regulation because the benefit would be saturated in accordance with the investment moment and the increase of total invested capacity of ESS facilities. Hence, in this paper, the annual optimal mathematical investment model is proposed to estimate the optimal capacity and to establish investment plan of ESS facility for frequency regulation. The optimal mathematical investment model is newly established for each season, because the construction period is short and the operation effect for the load by seasons is different unlike previous the mathematical investment model. Additionally, the marginal operating cost is found by new mathematical operation model considering no-load cost and start-up cost as step functions improving the previous mathematical operation model. ESS optimal capacity is established by use value in use iterative methods. In this case, ESS facilities cost is used in terms of the value of the beginning of the year.

Review of Virtual Power Plant Applications for Power System Management and Vehicle-to-Grid Market Development (전력시스템 관리 및 Vehicle to Grid 전력시장 개발을 위한 가상발전소의 활용방안)

  • Jin, Tae-Hwan;Park, Herie;Chung, Mo;Shin, Ki-Yeol;Foley, Aoife;Cipcigan, Liana
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.2251-2261
    • /
    • 2016
  • The use of renewable energy sources and energy storage systems is increasing due to new policies in the energy industries. However, the increase in distributed generation hinders the reliability of power systems. In order to stabilize power systems, a virtual power plant has been proposed as a novel power grid management system. The virtual power plant plays includes different distributed energy resources and energy storage systems. We define a core virtual power plant technology related to demand response and ancillary service for the cases of Korea, America, and Europe. We also suggest applications of the proposed virtual power plant to the vehicle-to-grid market for restructuring national power industries in Korea.

Performance Optimization of High Specific Speed Pump-Turbines by Means of Numerical Flow Simulation (CFD) and Model Testing

  • Kerschberger, Peter;Gehrer, Arno
    • International Journal of Fluid Machinery and Systems
    • /
    • v.3 no.4
    • /
    • pp.352-359
    • /
    • 2010
  • In recent years, the market has shown increasing interest in pump-turbines. The prompt availability of pumped storage plants and the benefits to the power system achieved by peak lopping, providing reserve capacity, and rapid response in frequency control are providing a growing advantage. In this context, there is a need to develop pumpturbines that can reliably withstand dynamic operation modes, fast changes of discharge rate by adjusting the variable diffuser vanes, as well as fast changes from pumping to turbine operation. In the first part of the present study, various flow patterns linked to operation of a pump-turbine system are discussed. In this context, pump and turbine modes are presented separately and different load cases are shown in each operating mode. In order to create modern, competitive pump-turbine designs, this study further explains what design challenges should be considered in defining the geometry of a pump-turbine impeller. The second part of the paper describes an innovative, staggered approach to impeller development, applied to a low head pump-turbine project. The first level of the process consists of optimization strategies based on evolutionary algorithms together with 3D in-viscid flow analysis. In the next stage, the hydraulic behavior of both pump mode and turbine mode is evaluated by solving the full 3D Navier-Stokes equations in combination with a robust turbulence model. Finally, the progress in hydraulic design is demonstrated by model test results that show a significant improvement in hydraulic performance compared to an existing reference design.

An Effective Priority Method Using Generator's Discrete Sensitivity Value for Large-scale Preventive Maintenance Scheduling (발전기 이산 민감도를 이용한 효율적인 우선순위법의 대규모 예방정비계획 문제에의 적용 연구)

  • Park, Jong-Bae;Jeong, Man-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.3
    • /
    • pp.234-240
    • /
    • 1999
  • This paper presents a new approach for large-scale generator maintenance scheduling optimizations. The generator preventive maintenance scheduling problems are typical discrete dynamic n-dimensional vector optimization ones with several inequality constraints. The considered objective function to be minimized a subset of{{{{ { R}^{n } }}}} space is the variance (i.g., second-order momentum) of operating reserve margin to levelize risk or reliability during a year. By its nature of the objective function, the optimal solution can only be obtained by enumerating all combinatorial states of each variable, a task which leads to computational explosion in real-world maintenance scheduling problems. This paper proposes a new priority search mechanism based on each generator's discrete sensitivity value which was analytically developed in this study. Unlike the conventional capacity-based priority search, it can prevent the local optimal trap to some extents since it changes dynamically the search tree in each iteration. The proposed method have been applied to two test systems (i.g., one is a sample system with 10 generators and the other is a real-world lage scale power system with 280 generators), and the results anre compared with those of the conventional capacith-based search method and combinatorial optimization method to show the efficiency and effectiveness of the algorithm.

  • PDF

An Economic Analysis on Dual-fuel Engine Generation for Peak Load (피크부하용 혼소엔진발전의 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

Gird Connected Modeling of Primary Frequency Recovery Reserve Provided by Electric Vehicle Considering Characteristics of Electric Vehicle Charge/Discharge Control Integrated Environment (전기자동차 충·방전제어 통합 환경을 고려한 전기차 1차 주파수 회복예비력의 계통연계형 모델링)

  • Kook, Kyung Soo;Lee, Jihoon;Moon, Jonghee;Choi, Wooyeong;Park, Kijun;Jang, Dongsik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.249-254
    • /
    • 2021
  • As the spreading speed of electric vehicles increases rapidly, those are expected to be able to use them as flexible resources in the power system beyond the concern for the supply of its charging power. Especially when the Renewable Energy sources (RES) which have no intrinsic control capability have replaced the synchronous generators more and more, the power system needs to secure the additional frequency control resources to ensure its stability. However, the feasibility of using electric vehicles as the frequency control resources should be analyzed from the perspective of the power system operation and it requires the existing simulation frameworks for the power system. Therefore, this paper proposes the grid connected modeling of the primary frequency control provided by electric vehicles which can be integrated into the existing power system model. In addition, the proposed model is implemented considering technical performances constrained by the characteristics of the Vehicle-Grid Integration (VGI) system so that the simulation results can be accepted by the power utilities operating the power system conservatively.

Relations between the Financial Ratios and the Management Performance in Oriental Medicine Hospital (재무분석을 통한 대학부속 한방병원의 경영성과분석)

  • Lee, Woo-Chun
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.2
    • /
    • pp.35-44
    • /
    • 2012
  • This paper provides information for decision making of the managers and the staffs of oriental medicine hospitals through the analyzing financial statement. The oriental medicine hospitals decreased total assets, total gross revenues, and increased debt. Comparison of years 2008 and 2010, oriental medicine hospital's total assets decreased, liabilities increased, total revenue decreased, and showed a continuing deficit. On the other hand, the rate of net worth of the oriental medicine hospitals were high and lower dependence on the borrowings. So the management performance of the oriental medicine hospitals as a whole were good. However some the oriental medicine hospitals were experiencing serious financial difficulties. In order to the hospitals overcome its financial difficulties, they had to rely on short-term borrowings. In consideration of the reserve fund for essential business, the transfers and the net profit ratio to total assets of the operating profit ratio to total assets were the level of commercial interest rates. But the operating profit ratio to the total assets were significantly different according to the hospitals. And 10 hospitals of the operating profit ratio to gross operating revenues were (-), they had problems with profitability. Meanwhile the total amount of capital and the equity capital of reduced hospitals increased, there were significant differences even between hospitals.

  • PDF

Warm Start Up Time Reduction Through the Increase of Boiler Water Circulating Pump Inlet Water Temperature Rate of the Thermal Power Plant (관수온도 상승률 증가에 의한 발전용 보일러의 온간기동시간 단축에 관한 연구)

  • Kang, Hee-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.10 no.1
    • /
    • pp.47-53
    • /
    • 2014
  • The national capacity of electricity of Korea was 81,737 MW and the peak demand was renewed by the record of 71,230 MW in 2012 which has been increasing since the first lighting ceremony had taken place in the Royal Palace(Kyung-Bok Goong) in 1887. Aa the counteract on the rapid increasing of the demand, Korean government is constructing and operating the high capacity nuclear and thermal power plants, however, the operating reserve on weekdays is small while those of weekends are more than 40% of capacity, so they are providing the pumped-storage power plants with the surplus electricity during weekends and operating the power plants which cost higher production price and located in the capital area with WSS (Weekly Start and Stop) mode including the Seoul Thermal Power Plant. Since the Seoul Thermal Power Plant is spending huge amount of expenses for more than 30 times of the WSS annually due to the high production cost even though it is in Seoul, the core of the demand, I chose the power plant unit #5 which was on the grid in 1969 for the case to confirm reducing 23% of the warm start-up time by applying the "Start-up time management program", and that reducing 35% of the water temperature increasing time by accelerate the increasing rate of the inlet temperature of the water circulating pump.

  • PDF

Improvement of Linux Schedulability Analysis for Simultaneous Support of Real-Time Task Groups and Deadline Task (실시간 태스크 그룹과 데드라인 태스크의 동시 지원을 위한 리눅스 스케줄링 가능성 분석 개선)

  • Yim, Yin-Goo;Jin, Hyun-Wook;Lee, Sang-Hun
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.7
    • /
    • pp.452-457
    • /
    • 2017
  • Linux is a general-purpose operating system that supports several schedulers, allowing different schedulers to coexist. In addition, Linux uses the Control Group (cgroup) to reserve CPU resources for task groups that follow the real-time (SCHED_FIFO, SCHED_RR) and non-real-time (SCHED_NORMAL) scheduler policies, except for the deadline scheduler (SCHED_DEADLINE). The cgroup performs the schedulability analysis to guarantee the reserved CPU resource as much as possible. However, current implementation of the schedulability analysis does not distinguish between deadline tasks and real-time tasks. Therefore, if these deadline tasks and real-time task groups coexist, there is a case where the resource reservation for the real-time task group is rejected. In this paper, we analyze the problems in the schedulability analysis for real-time task groups of Linux cgroups and propose patches to solve these problems.

Web-based Agricultural Machinery Rental Business Management System

  • Shin, Seung-Yeoub;Kang, Chang-Ho;Yu, Seok-Cheol;Kim, Byounggap;Kim, Yu-Yong;Kim, Jin-Oh;Lee, Kyou-Seung
    • Journal of Biosystems Engineering
    • /
    • v.39 no.4
    • /
    • pp.267-273
    • /
    • 2014
  • Purpose: This study was conducted to develop a web-based business management system to ensure the efficient operation and transparent management of government-subsidized agricultural machinery rental businesses. Methods: An MS_SQL2000 database management system (DBMS) solution was utilized in the system for high system compatibility and integrated management. This system was targeted to be compatible with Internet Explorer 6.0 or later and to ensure security and seamless web operations. The system administrator is able to manage a fleet of agricultural machinery, including various inventory codes, release and return, fleet registry, and business performance. Users (farmers) may search the database of rental machinery and reserve them. Results: With respect to rental reservations, the system administrator can manage the fleet by setting the rental status to Approved, Released, or Returned. Through the web, the administrator can also create a database that includes machinery specifications, features, and rental rates. In addition, business performance data can be analyzed using a diverse array of tools to streamline the rental business. Without having to go to the rental office, users can save time and money by searching for and renting agricultural machinery through the information available on the website, including availability, specifications, and rental fees. After deploying the system, the time required to analyze monthly performance and create reports was dramatically reduced from 20 days per person to one day per person. Conclusions: Since 2014, AMRB has been installed and is operating in agricultural machinery rental businesses in 31 cities and counties in South Korea. This study recommends continued expansion and dissemination of AMRB for the systematic and efficient management of agricultural machinery rental businesses.